Meet the Supplier Event The Radisson Blu Portman Hotel 24th March 2015 www.procure21plus.nhs.uk

Delivering Cost Reduction through Standardisation Standard Components

24th March 2015 www.procure21plus.nhs.uk

Introduction and Welcome David Kershaw PSCP Programme Director

www.procure21plus.nhs.uk

Agenda • • • •

Introduction and Welcome Cost Reduction Journey Standard Components Supplier Presentations and Q&A – Suspended Ceilings – Privacy Screens – Skirting Heating – Bedhead Service Trunking

• 11:30 Break and Exhibition

Agenda • Supplier Presentations and Q&A – Sanitary Ware – Patient Hoists – Paint

• 13:00 Lunch and Exhibition • Supplier Presentations and Q&A – Lighting – Soft and Hard Flooring – Doors

Agenda • 15:00 Break and Exhibition • Supplier Presentations and Q&A – Windows

• Final Q&A • Summary • 16:10 Close

Housekeeping • • • •

Breaks Facilities Fire/Emergency Phones

Cost Reduction Journey Andrew Cartwright PSCP Lead – Galliford Try

www.procure21plus.nhs.uk

The Challenge • Government Construction Strategy • Efficiency Agenda

Our Response • Cost reduction programme • Repeatable solutions • Standard materials & Components • National Events

Our Committed Response All 6 PSCPs Working together with DH, Supply Chain and Industry

LEADERSHIP

Cost Manager Programme Manager

Core Teams

Design Room Specification Supplier Development

Development Process

Operating Policy

Specification Operational Policy

Post Project Evaluation

Literature/ Research Review

Literature Review Repeatable Room Design

Evidence Matrix Patient Group Design Assessments

In-Use Review

Evidence Matrix

Peer Review

Applies to all Rooms & Designs

Patient Focus Group

Peer Review Previous Scheme Designs

Published Work P21 Club website Guidance

Development Work Reports Literature reviews Assessment Schedules

Updated & New Framework Documents

Charter Works Information Procurement Strategy Guidance Note 19 & 20

NHS England & TDA Business Case checklists

Published Work P21+ Club website Standard Share

Standard Materials & Components: Soft & Hard Flooring Suspended Ceilings Doors & Ironmongery Lighting Sanitary Ware Fire & Smoke Dampers Bedhead Services Radiant Panels Ceiling Hoists Paint

What have we achieved 14 Standard Rooms Developed & Validated: Acute

• 3 Single Bedrooms • 3 4Bed MBB Primary/Acute • 5 Consult/Exam Rooms

Mental Health • Functional Bedroom • 2 Organic Bedrooms

INNOVATION INTEGRATION AND COLLABORATIVE WORKING

iPad App

What we are doing now and in the future Emergency Department Rooms: • Fixed acuity • Acuity-adaptable • Chair-centric Review Feasibility & Benefits for : • 8 Bed Cluster Standard Components

Repeatable Rooms in Use • Projects at Stage 3: – Doncaster – Chase Farm – Addenbrookes – Basildon – Oxleas

Repeatable Rooms in Use • Projects at Stage 4: – Wrightington, Wigan and Leigh • IHP and IBI Nightingale

– Lymes Wards 112 & 113, Royal Stoke University Hospital • Kier and Gilling Dod

Repeatable Rooms in Use • Completed Projects – Lilac Ward, Scarborough Hospital • Kier and RLA

– Lymes Wards 110 & 111, Royal Stoke University Hospital • Kier and Gilling Dod

Benefits – Potential Savings • Total potential saving: £30.24m, or c5.04%

(against typical market rates, and based on £600m total spend pa)

• • • • • • • • •

Flooring: £4.20m Doors: £3.84m Lighting: £2.52m Ceilings: £2.46m Bedhead Services: £1.98m Ceiling Hoists: £1.20m Sanitary Ware: £0.54m Radiant Panels: £0.48m Paint: £0.18m

• • • •

Partitions: £4.5m Pipework: £3.54m Chillers: £2.64m AHUs: £2.16m

This image cannot currently be display ed.

9 Month Savings • Total: £1,114k • • • • • •

Lighting: £511K (20%) Sanitary Ware: £319k (59%) Ceilings: £180k (7%) Flooring: £92k (2%) Doors: £9k Fire Dampers: £2k

Airedale Buckland and Dover Croydon Darlington Memorial Hillingdon Leighton New Cross Nottingham University Rotherham Royal Stoke University Scarborough Southampton General St Bernards Stepping Hill The Walton Centre Worcester Royal Queen Elizabeth, Gateshead

Technical Papers • • • •

AHU Chillers Pipework Partitions

How you will benefit

Helping you achieve your savings targets & improve your business Can you afford not to?

TECHNICAL

COMMERCIAL

Off the shelf solutions-ready for use

Significant savings on HBN Bespoke Designs

Compliant designs and products

Benchmarked Costs

Endorsed by Department of Health

Supporting the Government Construction Strategy

Quicker design period

Helps you deliver real savings

Use on New build and refurbished projects

Value for Money

23

Thoughts for today • Listen to what’s on offer • £1M saved in £4M of Orders • Why are you not benefiting from using Standard Components • Easy to access benefits, via StandardShare

Suspended Ceiling Daniel Broyd Rockfon Ceilings

www.procure21plus.nhs.uk

Suspended Ceilings • • • • •

Rockfon Medicare Standard tile; HTM 60 Classes 2-5 30 year warranty Fixed price to end 2015 Up to 27% savings

Agenda • • • • • • •

Introduction to Rockfon Proposal (range, warranty, fixed price, savings) Standard Component(s) (Key features, benefits) Product Development/Innovation/BIM Current/Previous Projects Spend/Savings to Date (as Q4 2014) Key Contacts

Introduction to Rockfon Rockfon – part of Rockwool International (T/O >€2.4BN) Largest Stonewool Manufacturer in the world Largest RBMF Ceiling manufacturer in Euro/Russia Leading healthcare supplier in EU/Russia

Complete ROCKFON ceiling systems

Proposal – Warranty/Savings • Savings - £1.50 to 5.00/m². • Long warranty

• Risk taken by Rockfon on price

• Healing Process/Patient Comfort

Standard Components • Rockfon recommend MediCare Standard to comply with HTM class 2-5 (6). • MediCare ceilings are resistant to MRSA, easy to clean and disinfect, while being aesthetically pleasing and offering the inherent benefits of Rockfon stone wool ceilings. • Rockfon T24 and T15 Click Grid is durable, easy to install, robust and stable which provides a perfect platform for Rockfon tiles

Key Feature USP’s/Benefits Hygiene works to prevent spread of infection ISO Class 5 Air Cleanliness

Create warm welcoming environments

Highest Class A sound absorption

Durable easy to clean surfaces

Rockfon grid and tile is 100% recyclable

Non combustible A1 reaction to fire

Development/BIM/Innovation • Innovation to support the needs of our customers

• Patient Comfort is primary

• BIM modelled for ease of design

Projects

Spend V Savings (2014) Standard Component Savings

14 - P21+ Projects 1 - Non-P21+ Project

P21+ Value

Cost Saving

P21+

Typical Market Value £573,725

£394,190

£179,535

Non-P21+

£98,800

£65,600

£33,200

Total

£672,525

£459,790

£212,735

Contacts Key “field contacts

Additional Support: Customer Services Technical Support Sales Team

Questions?

Privacy Screens Tim Clarke Silentia

www.procure21plus.nhs.uk

Privacy Screens • • • • • •

Silentia Alternative to disposable or washed curtains Maximum positioning flexibility Potential wholelife cost benefits Fixed price to October 2016 Up to 20% savings

Tim Clarke 24 March 2015

Presentation • • • •

Intro to Silentia Product Innovation & Benefits UK Projects Silentia: ProCure21+ Enhancement Option

Silentia - Company

• • • •

25 years supplying screens End-to-end services: from design to delivery Screens used across healthcare facilities Flexible market uses

Silentia - Product

Patented screening system: hospital curtains

alternative to

Silentia Benefits CLIENT

PROJECT • • • •

Design Versatility Aesthetics Acoustics

• • • •

Infection Prevention Privacy & Dignity Economics Ergonomics

Design

Flexible Accommodation

Versatility

Product range: Heights, Lengths, Mounting Options

Aesthetics

Range of colours and panel finishes

Acoustics

Reduced sound travel

Infection Prevention

Hard, wipeable surfaces

Problems with Curtains • Contaminated Curtains:

92% contaminated within 1 week

• Confidentiality Breached:

No ‘private’ conversations or clinical examinations & wards restricted by same-gender policies

• Costs: Money for laundry & new curtains; time to remove & replace curtains

• Clashing with Other Equipment: e.g. Ceiling Hoists

Privacy & Dignity

Private examinations & conversations

Ergonomics

Patented hinges enable easy handling

Economics Cost Comparison Over 5 Years £600.00 £500.00 £400.00 £300.00 £200.00 £100.00 £Investment Operation

UK Projects Hospital

Year

Location Installed

Golden Jubilee, Glasgow

2012

Single Rooms

Borough Kidney Treatment Centre, London (Guy’s & St Thomas’ NHS Foundation Trust)

2012

Renal Unit

Princess of Wales, Bridgend

2013

A&E Unit Dermatology

University College, London

2013-14

A&E Unit MacMillan Cancer Centre

Southmead, Bristol

2014

Renal Unit Day Case Surgery Chemotherapy Critical Care

St Thomas’ , London

2014

Neo-Natal

Enhancement Option Repeatable Rooms Framework Agreement • 20% List Price Discount • Fixed Prices to Dec. 2016 • CE Mark (MDD 93/42/EEC) • 2-Year Product Warranty • Reduced Whole Life Costs

4-Bed (Multi Bed Bay) Example

Contact Silentia UK Tel: 0870 066 2455 Tim Mobile: 077 8875 7171 Email: [email protected] Web: www.silentiascreens.com

Tim Clarke 24 March 2015

Skirting Heating Martin Wadsworth Discrete Heat

www.procure21plus.nhs.uk

Skirting Heating • • • • • •

Discrete Heat Alternative to Radiant Panels Perimeter skirting heating option 10 year warranty Fixed price to October 2016 Up to 20% savings

Hygienic Heat • Controllable Comfort • Safe & Secure

HAVE I GOT DRAGONS DEN NEWS FOR YOU… Guess the odd one out round..

As seen on BBC’s Dragons Den We always get asked: “did you get the money?”…

The end of the pipe line for ThermaSkirt? ..or maybe not…..

The Dragons Den Video has been broadcast all over the world…

The ‘odd’ one out is radiant skirting heating - because you’ve probably never installed it! Yet..

Background

Dr Barzo Faris MD, MSc (LSHTM), FRCPath Lead Microbiologist MRI

+

contacted by NHS Trafford General infection control team (now part of MRI).

+

Developed from the ThermaSkirt product with over 13,000 domestic installations

+

Independently assessed for Energy Saving Performance

+

Installed in 4 NHS Projects (2014) and specified on 3 more in 2015.

+

Specified on > 1,000 Assisted living apts. for 2015

+

Now Included on NHS Procure 21+ Program

Some Recent

Projects

Some Recent Dementia &

Installs

Benefits to Service Users

+ + + + + + + + + HB Villages Blackburn, LD & PD Assisted Living

Hygienic and improved infection prevention Anti fall, Anti trip and naturally Anti ligature Safe to the touch No over heating No Under heating No ‘Hot Head Syndrome’ causing distress All around room comfort Familiarity of skirting for dementia sufferers Available with high visibility top capping for Alzheimer's and the visually impaired

+ + + + + + NHS Trafford General

+

Benefits to Service Providers Simple to clean – wipe down when mopping the floors Energy Efficient – typically 13% more the LST Radiators Rapid controllable heat on & off for staff comfort Simple to trouble shoot – not in floor nor over head height Versatile – allows subsequent bolting of furniture to floor without risk Eliminates any risk of ‘dead leg syndrome’ – from standing on hot floors all day 10 year warranty on wet parts

Benefits to Designers

+ + + + NHS Hertfordshire, Queensway

+

Allows room designs to be standardised yet frees up all walls for varying furniture and equipment Can be colour coordinated to suit the room, or to provide a visual marker between floor and walls Provides a domestic ‘feel’ to living spaces without compromising comfort, safety or space. Allows the use of larger windows and seating areas for better natural light. Works in rooms in rooms of all ceiling heights

Benefits to Constructors

+ + + + + + + + + Cowan Court Assisted Living, Pennicuik

One size fits all – cut to length on site. Simplified pipe layout Reduced total heating load and pipe sizing Single feed and return point Reduced construction costs Flexible program of works Reduced liability & PI Reduced build time Reduced risk of re-work

Cost Benefits + + + + + + Extract from Procure 21+ Repeatable Room

Exclusive access to P21+ pricing Typical savings 40 %+ from List Price Economies of scale and interchangeability of skills and components 1 profile suits all applications/designs Off the shelf spares and parts 24/7 via www.discreteheat.com Pricing Transparency

Independently Tested & Assessed

BSRIA Comfort test vs Radiators

Swedish Institute of Climate Research, BRE & NHS NTAC Reports

Current Installs

Iris Murdoch Centre, DSDC

Demonstration + Iris Murdoch Centre, Stirling University + Better Bedrooms 1 DIMHN Warrington + Better Bedrooms 2 DIMHN (mobile) Confirmed 2015 + NHS Dudley & Walsall Mental Health Trust + HB Villages – 20 x 16 bed PD & LD Assisted Living + Priory Asset – 44 Dementia Care Units , 96 Assisted Living Apartments, 15 Lodges + Moseley Rd Care Village, Birmingham + Brookes Bay – 2 x 40 bed care home, Dundee P21+ Planned

Noble Care Autistic Respite Centre

Summary of Benefits

+ + + + + + +

HB Villages, Grimsby

Improved Comfort, Hygiene & Safety Reduced Running Costs & Maintenance Improved Welfare & safety Reduced Construction Costs Procure 21+ Pricing Flexibility & Versatility of use Lifetime Design & 10 year warranty

Dragons Den II – “The One that Got Away” 12 months later, and James Caan returns..

This 2nd broadcast led to enquiries from all over the world, including the NHS...

Any Questions ?

Andy Burnham Shadow Sec. State Health

www.discreteheat.co.uk

Bedhead Service Trunking Phil Wade Static Systems

www.procure21plus.nhs.uk

Bedhead Services • 4 Suppliers – Cableflow – Mediplan – Static Systems; and – Wandsworth

Bedhead Services • Specification led component • P21+ Specification, with Vertical and Horizontal options • 4 Suppliers – Cableflow; Mediplan; Static Systems; and Wandsworth

• Fixed price to end 2015 • Up to 25% savings

“Meet the supplier” Static Systems Group Bedhead Services Trunking

24th March 2015 Phil Wade Director of Marketing

Agenda • • • • • • •

Introduction Company Profile Bedhead Trunking Standard Components What’s next ? Key Contacts Questions

Established: Employees:

1964 240

Product Groups • Bedhead services trunking • Healthcare communications • Fire alarm systems • Attack alarm systems • Prison alarm systems

• • • • •

CLIENT GROUPS Health authorities/trusts Framework consortia Prison departments Government establishments

Some projects • • • • • • • • • • • • •

Peterborough Hospital North Staffs Hospital South Glasgow Hospital Coventry Hospital Ulster Hospital Aberdeen Royal ECC Walsall Hospitals Bart's & London Hospitals Alder Hey Children’s Hospital QE Hospital Gateshead Cramlington ECC Bristol Royal Infirmary Lichfield Community Hospital

Bedhead Trunking

Off site construction

Bespoke product

Bespoke product • • • •

Design drawing production Approval process Extended delivery Increased cost

Standardised repeatable products

2700mm

2600mm

Vertical & Horizontal options

Standardised repeatable products • • • • • • • • •

Based on repeatable room designs BIM modelling HTM08-03 compliant Nurse call & medical gas provision (O2 , Vac) Lighting control 4 x twin 13 amp sockets 2 x twin data outlets USB charging facility Delivery & offloading

Standardised repeatable products • Options – – – – –

Pre- wiring Pre-piping of medical gas Additional gas (MA4) Installation

Standardised repeatable product • • • •

Design drawing production Approval process Extended delivery Increased cost reduction ( average 17%)

What’s next ? • Procure 21+ Design & Innovation Centre • Mounting options • ???????

Procure 21+ Design & Innovation Centre

Mounting options

Key contacts •

Static Systems Group Heath Mill Road Wombourne West Midlands WV5 8AN

• •

www.staticsystems.co.uk/procure21-repeatablerooms-initiative.pdf [email protected]



Paul Maddox - Sales Manager [email protected] Tel: 01902 891032

Any questions ? www.staticsystems.co.uk/procure21-repeatableroomsinitiative.pdf [email protected]

Break and Exhibition Return 12:00 www.procure21plus.nhs.uk

Sanitary Ware Bill Freemantle/ Liam Ansell

www.procure21plus.nhs.uk

Sanitary Ware – Primary and Acute • • • • • • •

Ideal Standard and Pipe Centre Product Selector; Room Packs Lever or Sensor options No cost demountable tap now lunched Also, Stainless Steel products Fixed price to end 2016 Up to 40% savings

Sanitary Ware – Mental Health • • • • • •

Ideal Standard and Pipe Centre Product Selector; Room Packs Contour and Sentry 21 L/M/H secure unit options Fixed price to end 2016 Up to 20% savings

Armitage Shanks •

Liam Ansell – Key Account Manager / Procure 21+ Lead.



Manufacturing Sanitaryware since 1817.



Strongest UK Brand in commercial bathroom, sanitaryware and washroom installations.



Complete Sanitaryware “One Shop” Offering.

Working in partnership to deliver PROCURE 21+

Warranties & Savings •

Vitreous China (Ceramics)

Lifetime



Solid Surface (Mental Health offering)

Two Years



Brassware (Taps, Mixers)

Five Years



Stainless Steel



Fixed price until December 2016 via Pipe Center Only



Savings of 40% on normal market prices on Standard components



Savings of 25% on normal market prices on Mental Health components

Twenty-five Years

Supplier Summary •

Only UK Sanitaryware manufacturer



Regular consultation on standards with DOH



All Health product fully compliant with HBN 00-09 HBN 00-10 HTM 04-01 addendum and D08



Dedicated Project Team



Single Point of Contact



National Distribution Via Our Network



Full environmental policy



Products Manufactured in UK 9 years consecutive RoSPA gold medals

Standard Room Selector Matrix

Room Selector Matrix (Mental Health)

Innovation •

Demountable Markwik Clinical Mixer Submerge & Disinfect Integral Thermostat Horizontal Spout Purging Facility Thermal Disinfection Auto-Flush Technology



Bio Guard Outlets on Markwik & Contour Mixers



Bariatric WC

Innovation •

Sentry 21 – Flexible Pack Offering



BIM (Building Information Modelling) – All Standard & Mental Health Products Armitage Shanks are one of an elite few companies invited by the governments BIM task group manufacturing arm (BIM4M2) to be recognised as pioneers of the new process.

Previous Projects

Project Name

Trust

The Walton Centre - Project Arizona

The Walton Centre NHS Foundation Trust.

Buckland Dover Hospital

East Kent Hospitals University NHS Foundation Trust

York Teaching Hospital

York Teaching Hospital NHS Foundation Trust

Queen Elizabeth Hospital

Gateshead Health NHS Foundation Trust

Prestwich Hospital

Greater Manchester West Mental Health NHS Foundation Trust

Hillingdon Hospital

The Hillingdon Hospitals NHS Foundation Trust

Worcester Royal Hospital

Worcester Health & Care NHS Trust

Airedale Hospital

Airedale NHS Foundation Trust

Woodlands Hospital

Greater Manchester West Mental Health NHS Foundation Trust

Nottingham Queens Medical Centre

Nottingham University Hospital NHS Trust

Southampton General Hospital

University Hospital Southampton NHS Foundation Trust

Royal Stoke University Hospital

University Hospitals of North Midlands NHS Trust

St Mary' Hospital

Isle of Wight NHS Trust

Scarborough Hospital

York Teaching Hospital NHS Foundation Trust

Royal Cornwall Hospital

The Royal Cornwall Hospitals NHS Trust

Leighton Hospital

Mid Cheshire Hospitals NHS Foundation Trust

Seaward Lodge

Hertfordshire Partnership University NHS Foundation Trust

St Bernards MSU

West London Mental Health NHS Trust

Wrightington Hospital

Wrightington,Wigan and Leigh NHS Foundation Trust

Future Projects

Project

Trust

Luton & Dunstable Hospital

Luton & Dunstable University Hospital NHS Foudation Trust

Eastbourne District General Hospital

East Sussex Healthcare NHS Trust

James Cook University Hospital

South Tees NHS Foundation Trust

The Hellingly Centre

Sussex Partnership NHS Foudation Trust

Ipswich Hospital

The Ipswich Hospital NHS Trust

Rushden Hospital

Northamptonshire Healthcare NHS Foundation Trust

Robert Jones & Agnes Hunt Orthopaedic hospital

The Robert Jones and Agnes Hunt Orthopaedic Hospital NHS Foundation Trust

Christie Hospital

The Christie NHS Foundation Trust

Kettering General Hospital

Kettering General Hospital NHS Foundation Trust

Sheffield Childrens Hospital

Sheffield Children's NHS Foundation Trust

New Cross Hospital

Royal Wolverhampton Hospitals NHS Trust

Royal Shrewsbury Hospital

Shrewsbury and Telford Hospital NHS Trust

Darlington Memorial Hospital

County Durham and Darlington NHS Foundation Trust

Rotherham Hospital

The Rotherham NHS Foundation Trust

Croydon Hospital

Croydon Health Services NHS Trust

Addenbrookes Hospital

Cambridge University Hospitals NHS Foundation Trust

Basildon & Thurrock Hospital

Basildon and Thurrock University Hospitals NHS Foundation Trust

North Tyneside Hospital

Northumbria Healthcare NHS Foundation Trust.

Standard Component Savings 2014 Typical Market Value

P21+ Projects

£ 1,122,958.42

Typical Market Value

P21+ Projects

£

89,140.00

P21+ Value

£803,606.32

P21+ Value

£68,230.76

Cost Saving

£319,352.10

Cost Saving

£20,909.24

Key Contacts

Armitage Shanks Contact: Liam Ansell [email protected] Mobile: 07702 010932

Pipe Center Contact: Wayne Calland-Hewitt [email protected] Tel: 01926 705463

Thankyou

• Any Questions?

Radiant Panels • • • •

Pipe Centre and Sabiana Pulsar Ceiling Panels Fixed price to end 2016 Up to 28% savings

Patient Hoists Simon Saulis Arjo Huntleigh

www.procure21plus.nhs.uk

Ceiling Mounted Hoists • • • • • •

Arjo Huntleigh Benefits study with Loughborough University Fixed installation costs Lifetime training Fixed price to end 2016 Up to 25% savings

New South Glasgow Hospital

Projects and Partners NHS

Private Sector

Partners

• New South Glasgow Hospital. 350 Maxi Sky systems,finished ahead of schedule • Birmingham Super Hospital • University College Hospital London • St Bartholomew’s • Newcastle RVI

• • • • •

• • • • • • • • •

BUPA Four Seasons Barchester Care Base Anchor

Skanska Brookfield Multiplex Laing O’Rourke Kier Willmott DIxon Interserve Balfour Beatty HPS Galliford Try IHP Vinci

Ceiling Track Systems (Embedded) Component parts Track, cassette, installation kit, spreader bar slings (clip or loop)

Benefits of using ceiling track systems To prevent MSD’s (Musculo Skeletal Disorders) Discreet and available, Storage, Space Pushing and Pulling Works where mobile hoist can’t Single Carer Use, Time Saving

Example: 4 bed bay, room covering over 2 beds with 1 MS2

Example: 4 bed bay single track over each bed with 1 MS440

Highlights Access to showroom facilities Nationwide coverage sales & Installation engineers Full 3D Design and layout support Future proofing your establishment for patient transfers Cost savings for P21+ contracts

Any enquiries relating to the supply of ceiling track systems Simon Saulis National Project Manager

07860 701165 my mobile 01452 – 428381 Project Design Team Office

Paint Haydn Wilmshurst Akzo Nobel www.procure21plus.nhs.uk

Paint • • • • • •

Akzo Nobel Paints and PPG Industries National technical specification teams Free next day delivery Free can recycling Fixed price to end 2016 Up to 30% savings

Inspiring Sustainable Colour Haydn Wilmshurst 2015

World leader in sustainable coatings

AkzoNobel is a worldwide leader in sustainable coatings For the 3rd consecutive year we are number 1 in our Industry on the prestigious Dow Jones Sustainability Index

Recognised for sustainable innovation across all our businesses:

EvCote Water Barrier 3000 - World’s first recyclable & compostable cup

Intersleek 900 - Prevents organisms attaching to ships creating ~9% saving on fuel

Dulux Trade Quick Dry range – Water-based gloss system delivering a superb finish with a lower environmental impact P21+ Meet the Supplier March 2015

AkzoNobel UK: Leading the decorative category to a brighter, sustainable future AkzoNobel is the leader in the decorative paints category with highly trusted prestigious brands Distribution throughout the country via 192 Dulux Decorator Centres & and other leading stockists One of the first companies in the world to obtain Carbon Trust triple certification for reducing carbon, water and waste year-on-year Zero waste to landfill across all factories, offices & stores Positively coloured over 800,00 lives since 2007 through a national community investment programme Investing £100m in new plant in Ashington, NE England. 60% more energy efficient than current NE operations 75% reduction in VOC emissions Structure BREEAM “Excellent” 50% reduction in challenging waste-streams P21+ Meet the Supplier March 2015

Sustainable Specification: Industry leading Environmental Product Declarations (EPDs) Our pioneering Environmental Impact Anaylser (EIA) calculates the environmental impact of our product formulations helping us to deliver path-finding technologies The EIA calculates the amount of embodied carbon, water and waste associated with the production of each raw material including growing, filtering, processing, transportation and manufacturing.

In 2014 we went further delivering Environmental Product Declarations (EPDs) for the first time in the decorative category. This provides customers with externally certified information covering the environmental impact of our paints across their life cycle

P21+ Meet the Supplier March 2015

Sustainable Specification: 3rd Environmental Product Declarations (EPDs) EPDs covering: Core matts, Diamond range, Ecosure range, Weathershield range & Dry Wall Primer Sealer – enabling full systems & specs to have EPD accreditation

Standard Matts*

Diamond Range*

Weathershield *Includes Light & Space Finishes

Ecosure Range*

Dry Wall Primer Sealer P21+ Meet the Supplier March 2015

Pioneering Sustainable Paint Specification AkzoNobel can help you deliver the most sustainable paint specification via: 1. 2. 3. 4.

Path-finding lower embodied carbon products: Dulux Trade Ecosure range High quality trim products with lower VOC levels: Dulux Trade Quick Dry range Extra Durability: Dulux Trade Diamond High Performance & Dulux Trade Weathershield Positive Sustainability Solutions: Dulux Trade Light & Space and Dulux Trade Sterisheild

Tips for a sustainable specification 1. Specify extra durable products in high-traffic environments e.g. DT Diamond range 2. Select water-based products wherever possible e.g. DT QD Gloss system 3. Use specialist products to deliver positive sustainability benefits e.g. DT Light & Space 4. Utilise our environmental product declarations to measure the impact of your specification 5. Reduce waste & water use during application via our DDC Can Recycling & Clearwash units P21+ Meet the Supplier March 2015

Colour Authority: Help patient care, orientation, visual impairment all in beautiful inspiring colours • We want to deliver more than Equality Act Compliance • Impactful colour your helping patients • Expert colour guidance, design support

P21+ Meet the Supplier March 2015

Questions at this point?

P21+ Meet the Supplier March 2015

Lunch and Exhibition Return 14:00 www.procure21plus.nhs.uk

Lighting Karen Bramman Whitecroft Lighting

www.procure21plus.nhs.uk

Lighting – Primary, Community and Acute • • • • • • •

Whitecroft Lighting Product Selector CF/T5 or LED options 15 month LED payback 5 year warranty Fixed price to end 2016 Up to 27% (18% LED) savings

Lighting – Mental Health • • • • • •

Whitecroft Lighting Product Selector CF or LED options 5 year warranty Fixed price to end 2016 Up to 27% savings

WHITECROFT LIGHTING

Karen Bramman Healthcare Director Procure 21+

Whitecroft Lighting Whitecroft Today

Manufacturing UK based Lighting Manufacturer Established since 1945 1977 Current Manufacturing site -HQ Full in house R&D Annual Sales £72m 2014 550 Employees 880,000 luminaires pa 10,000m2 Manufacturing Facility London CC - Manchester – Glasgow £100,000 Healthcare Specific Stock

P21 Proposal

Top 25 Products

5 Year Warranty

Fixed Rate 2016

Saving 15 % – 24%

P21 + Proposal MHU

Minimise the Risk Meet HTM35 Robust Product – Anti Ligature IK10 Assess High – Medium – Low Risk What type of Patient? Non Institutional Atmosphere Tuneable offer for Improved Recovery – Mood Supervised – Non Supervised Product offer - Choice



Circulation - Corridor Lighting Create visual interest and a therapeutic environment Balanced Contrast – Even Illumination Allows good facial recognition as below to avoid outburst – Anger – Mistrust Improves well being of the patient - feel safe

Whitecroft Lighting Key Benefits

Manufacturing National Coverage Dedicated Design Support Compliance with Standards Demonstration Area - Mock Up suites In house R&D, Manufacture Preferential P21+ Rates 5 year Warranty Distribution and Delivery - Direct or Wholesaler Project Management Reduced Risk and Cost

Innovation The three drivers for Innovation Energy Efficiency Lumens / Watt

Cost Down £ / Lumen

Features Features and and Enhancement Enhancement

Innovation Mirage LED Light Engine Development

£/lumen

45w

32w

Light Engine and Driver package

29w 26w 23w

2009 Energy rating

45w

Early 2010 32w

Late 2010 29w

Early 2011 26w

Late 2012 23w

Mid 2014 21w

Innovation Careline Health Benefits – Encourages Well being 45w

Patient and Staff control environment 32w • Tuneable White allows seamless graduation Cool and Warm Light

29w 26w

• Compliant LG2 – BSEN12464 • Pre Commissioned

23w

Whitecroft Lighting BIM/Revit

Manufacturing Building Information Modelling Invested in Autodesk suite licences In house Revit Model Creation 3D Intelligent Data behind 3D model Models Editable for CObie and Spie Data Models Edited to be Project Specific Successfully completed 6 projects with BIM/Revit Lighting design All models on BIM Store

Whitecroft Lighting Project Track Record

Manufacturing 53 Projects in total 32 Complete Llandough MHU QE Gateshead ECC

Saving to Jan 14 QMC Neutrapedic Hospital £511.944 Telford and Shrewsbury Womens & Children Rampton Blocks C&D

Half a Million for The Walton Centre Project Arizona NHS North Staffs CCU

P21+ Order Value £1,095.385 Market Value £1,607.329

P21+ Account Personnel

Hard and Soft Flooring Colin Hinton Tarkett Flooring

www.procure21plus.nhs.uk

Hard Flooring • • • • •

Tarkett Flooring Vinyl and Linoleum products Capex and Opex focused options Fixed price to end 2015 Up to 37% savings

Soft Flooring • • • • •

Tarkett Flooring Tandus Carpet 25 year warranty Fixed price to end 2015 Up to 22% savings

TARKETT LIMITED P21+ STANDARD COMPONENT:

FLOORING COLIN HINTON 24th MARCH 2015

Global Leader in Innovative Solutions for Flooring Surfaces Net Sales*:

2.5 billion euros

1.3 million

square metres

of flooring

12,000 employees

sold each day

34

Production sites Sales in more than

Vinyl Linoleum

Safety Floors Carpet

Wallcoverings

100 countries

Proposal Highlights Featured Components 1.

Eclipse & Primo Premium Vinyl Flooring – best Capex savings

2.

Veneto XF2 Linoleum sheet flooring – excellent capex alternative to Vinyl

3.

iQ Granit & Optima Vinyl Flooring – best Opex savings, best LCC in class

4.

Tandus Powerbond – impervious sheet carpet – best solution Mental Health Bedroom

5.

Slip Resistant Vinyl Flooring – to meet requirements for both shod & barefoot traffic

6.

Wood Effect Vinyl sheet Flooring – ideal for Mental Health environments

7.

Acoustic Flooring – where reduction in impact sound transmission is desirable

Warranty 1.

All items carry a full 10 year warranty against defective material

Pricing 1.

All components benefit from fixed price from 1st January 2014 to 31st December 2015

156

Supplier Summary •

Tarkett Group started business in 1880



ISO 9001:2008



132 years manufacturing experience



ISO 14001 : 2004



Multi product portfolio:



OHSAS 18001:2007





BREEAM ‘A+’



140,000 Tonnes recycled pa



Cradle 2 Cradle Silver Award Wood &

Linoleum, Vinyl, Wood, Laminate, Rubber, Carpet, Indoor Sports, Surfaces, Exterior Sports Surfaces



Largest manufacturer of Resilient Flooring in the World

Linoleum •

Largest Flooring Manufacturer in Europe



5 Recycling Plants, 10 International Training Centres,

#1 POSITIONS Artificial Turf Worldwide

Vinyl Worldwide

Accessories North America

Vinyl & Wood CIS

Runnin g Tracks North America

157

Standard Component Features & Benefits 1.

Phthalate Free Technology – Optimal Indoor Air Quality

2.

Ultra low VOC – from between 10 and 100 times lower than regulations, people friendly spaces.

3.

Up to 53% of recycled material content in new vinyl flooring

4.

No Wax / No Polish Maintenance – Reduces, energy, water & chemical consumption in service. Lowest LCC in class

5.

Ranges colour co-ordinated for the ultimate interior design solution

6.

Unique high-performance wall-covering solution provides outstanding mechanical resistance.

7.

Safety floors which meet the slip resistant requirements for both barefoot and shod traffic, reduces number of products and joints

8.

Unique hybrid carpet solution combining the resilience of Vinyl flooring and the soft texture of carpet

158

New Products, Innovation & BIM iQ Granit •

Launch of new collection April 2015



Extensively researched with Architects, Specifiers and Healthcare Specialists to provide the optimal colour palette



Increased colour palette from 36 to 50 colours.

Our FloorInMotionTM Care technology •

New ‘smart-floor’ technology employs a unique system of sensors to monitor patient/resident foot-fall activity. Introduction UK Q3



Health & Safety applications



Patient Security



An easy-to-work-with interface developed with the users, providing real time incident alarms as well as resident’s statistical activity information

Building Information Modelling •

All Tarkett flooring options featured as a P21+ Standard Component is available in CoBie standard BIM format



BIM assets can be down loaded from the website or from bimstore.co.uk

159

Current/Previous Projects •

Telford Hospital 10,950m2 Completed 2014



Leighton Hospital Theatre Extension 5,600m2 Complete 2013



Northwick Park Hospital 4,400m2 Completed 2014



Kettering General Hospital OPU 2,400m2 Completed 2013



Nottingham City Hospital Theatres 2,400m2 Completed 2014



Rampton Hospital Blocks C&D 3,500m2 On-site 2015

UCLH London – New Cancer Unit

160

Spend/Savings to Date • Live enquiries

19

• Projects currently on site

3

• Projects completed

16

161

Key Contacts P21+ Account Manager – Mark Burton

Specification Consultant Midlands – Emma Bishop

1.

Mobile:

07850 672524

1.

Mobile:

2.

Email: [email protected]

2.

Email: [email protected]

07909 257290

Specification Consultant South – Nikki Fletcher

Specification Consultant North – Richard Fletcher

1.

Mobile:

07974 303888

1.

Mobile:

2.

Email: [email protected]

2.

Email [email protected]

07920 701911

162

THANK YOU

Doors Cameron Hughes/ Philip Ross www.procure21plus.nhs.uk

Door Suppliers • 6 Suppliers – Arnold Laver; – David Smith; – Datim; – Leaderflush; – Lloyd Worrall – Safe Hinge (MH only)

Doors – Primary, Community and Acute • Specification led component • 14 standard door sets • 5 Suppliers – Arnold Laver; David Smith; Datim; Leaderflush; and Lloyd Worrall

• Up to 15 year guarantee • Fixed prices to end 2015 • Up to 32% savings

Doors – Mental Health • Specification led component • 6 standard door sets • 6 Suppliers – Arnold Laver; David Smith; Datim; Leaderflush; Lloyd Worrall; and Safe Hinge

• Fixed prices to end 2015 • Up to 32% savings

Welcome to DATIM

Framework Proposal

www.datim.co.uk

INTRODUCTION The Company Our Mission Providing architectural building products with innovation, and consideration for people and the environment

Established 1994 Turnover £6 Million Our team of 32 Employees are Dedicated to Providing Assistance with: Sales I Marketing I Estimating I Buying I Production I Accounts I Distribution I Product Development We Provide Fast and Efficient Next Day Deliveries of Ironmongery Stock Items We Produce Bespoke Doorsets & Doorkits with all Mortice Ironmongery items Factory Fitted

We double check all products for quality and accuracy at every stage of production & before they leave our factory. This helps to ensure your order arrives in perfect condition every time.

www.datim.co.uk

PROPOSAL . All Doorsets & Ironmongery we are proposing to supply to ProCure 21+ projects, are guaranteed for 15 Years from the date of supply. • ENCLUSA – PVC Encapsulated Doorsets in a range of colours & styles. 2 part split frame with concealed fixing. Frame design with integral architrave, unique for infection control.

• COMBI - Steel Powder Coated frames with Timber doors. 2 part split frame with integral architraves Can be incorporated with Safehinge sytem.

• CENTRO X – HPL / Venered Doorsets, with a timber frame. Can be fitted with PVC protection such as Kicklaplates / Mid-Rail Plate / Edge Protection.

• FIXED Prices for minimum of 12 month from date of Quotation.

• SAVINGS – Standardised Doorsets have given an average saving of 15% across all types

SUPPLIER SUMMARY Committed to Exceptional Customer Service from People Who Care About Your Business

Service Commitment Single Source Solution - a coordinated approach to Doorsets & Ironmongery, Screens, Windows & Balustrading Lean Manufacturing enables us to produce those last minute extras and specials so that your contract completes on time

Contract Stocking – call off your doors and ironmongery to suit your own programme

Free Doorpac Service - ironmongery for each door is individually and meticulously labelled and packed, saving you valuable time on site

Technical advice on all aspects of doors and hardware from sliding door gear to complex master key systems, DDA compliance from GAI trained technicians

www.datim.co.uk

SUPPLIER SUMMARY Service Commitment

Fast and efficient Next Day Delivery Service throughout the UK and Ireland for all stock products.

Free loan of high quality fully functional Sample Boards tailored to each individual project.

Ironmongery Door Scheduling Service – detailed and itemised specifications produced from floor plans.

Fast turnaround for Kick Plates due to our in-house facilities. We aim to despatch all orders placed before 12:00pm the same day.

Products are guaranteed compliant with all current Building Standards and legislation.

www.datim.co.uk

Our Attention to Detail Ensures Your Projects always Run Smoothly

STANDARD COMPONENTS FEATURES & BENEFITS Features - Benefits . Reduced number of Door Types – Reduced lead times & set-up costs (14no standard types) . Standard Door Leaf sizes – Regular sizes and volumes equals cost savings . Standard Ironmongery – Pre-scheduled Ironmongery sets . Uniform Structural openings – Saves using Bespoke doors . Standard range of laminates - Door size laminates & colours from UK stocks . Factory Morticed Ironmongery – Saves time & money on-site

COMPLETED PROJECTS: We have completed the following projects in the Healthcare Sector: Huddersfield Royal Infirmary Ardenleigh Mental Health – Birmingham Avon Whiltshire Mental Health Trust York Hospital Kettering Park Hospital Papworth Hospital Queen Elizabeth Hospital - Birmingham Nuffield Private Hospital – Birmingham & Cambridge Spire Healthcare (Various Projects)

PRODUCT IMAGES

www.datim.co.uk

KEY CONTACTS SALES Cameron Hughes Key Account Manager Tel 01246 572285 Email Team [email protected] Garry Hughes Key Account Manager DDI 01246 572284 Email [email protected] Darren Hughes Internal Sales Manager DDI 01246 572286 Email [email protected]

Experience & Quality you’ll receive expert advice from fully qualified, time served Team craftsmen, Whatever the project we take care of all the details so you don’t have to. We’ll also double check all products for quality and consistency before they reach you.

THANK YOU FOR YOUR TIME WE LOOK FORWARD TO WORKING WITH YOU

Philip Ross - Director

MENTAL HEALTH

Safehinge is the market leader in safe door systems thanks to our passion for finding new ways of doing things.

The team

• Experts in product design. Particular focus on doors and ironmongery.

Health services for teens

Education - where we started

Sexual and mental health

Westminster Children First, Issue 8, Autumn 2009

• Launched in 2009. Grown rapidly since, supplying around the world.

1

Mental Health - so far... Awards Best Product for Improving the Patient Experience - 2014 Product Innovation of the Year - 2014

Mental Health - so far... Awards Best Product for Improving the Patient Experience - 2014 Product Innovation of the Year - 2014

Supplied to

One team of experts • Suite of products - all best in class • Coordinated and tested by Safehinge • Standardised, yet flexible

• Anti-ligature and anti-barricade doorset • Fully fire compliant with concealed closer • Transom door closer for every scenario • Lifeline secure key for vision panels and removable stop - improved staff operation • Timber finish option to aid recovery

• Anti-ligature and anti-barricade doorset • Fully fire compliant with concealed closer • Transom door closer for every scenario • Lifeline secure key for vision panels and removable stop - improved staff operation • Timber finish option to aid recovery

• Available as a complete doorset from P21+ door manufacturers for mental health: - Arnold Laver - Datim - David Smiths St Ives - Leaderflush Shapland - Lloyd Worrall - Safehinge

ALUmax - hinge DOUBLE SWING

SECTION A-A SCALE 1 : 2

54

54

125 MIN

119 MIN

ANTI-BARRICADE

SECTION A-A SCALE 1 : 2

Refer to Symphony Manufacturing Guidelines for all dimensional information

Refer to Symphony Manufacturing Guidelines for all dimensional information

- Same hinge for all doors - simplified specification - Modular design for easy / low cost maintenance A

A

A

A

PART #: DESCRIPTION:

PART #: DESCRIPTION:

Safehinge Symphony doorset x-section + Movastop

MATERIAL: SURFACE FINISH:

SYMPHONY

PROJECT:

UNLESS OTHERWISE SPECIFIED: DIMENSIONS ARE IN MILLIMETERS TOLERANCES: LINEAR: 0.25 ANGULAR: 0.75

C 2012 SAFEHINGE LTD 3RD ANGLE PROJECTION

DEBUR AND BREAK ALL SHARP EDGES SCALE:1:20

REV: 00

SHEET 1 OF 1

DO NOT SCALE DRAWING

MATERIAL:

01412440085 PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF SAFEHINGE LTD. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF SAFEHINGE LTD IS PROHIBITED.

DRAWN BY: CHECKED BY:

JY

Safehinge doorset x

DATE: 29-07-13 DATE:

A4

SURFACE FINISH:

SYMPH

PROJECT:

UNLESS OTHERWISE SPECIFIED: DIMENSIONS ARE IN MILLIMETERS TOLERANCES: LINEAR: 0.25 ANGULAR: 0.75

DEBUR AND BREAK ALL SHARP EDG SCALE:1:20

SHEET 1 OF 1

DO N

ALUmax - hinge DOUBLE SWING

SECTION A-A SCALE 1 : 2

54

54

125 MIN

119 MIN

ANTI-BARRICADE

SECTION A-A SCALE 1 : 2

Refer to Symphony Manufacturing Guidelines for all dimensional information

Refer to Symphony Manufacturing Guidelines for all dimensional information

- Same hinge for all doors - simplified specification - Modular design for easy / low cost maintenance A

A

A

A

PART #: DESCRIPTION:

PART #: DESCRIPTION:

SUREclose - door closer

Safehinge Symphony doorset x-section + Movastop

MATERIAL: SURFACE FINISH:

SYMPHONY

PROJECT:

UNLESS OTHERWISE SPECIFIED: DIMENSIONS ARE IN MILLIMETERS TOLERANCES: LINEAR: 0.25 ANGULAR: 0.75

STANDARD (EN1-4)

C 2012 SAFEHINGE LTD 3RD ANGLE PROJECTION

DEBUR AND BREAK ALL SHARP EDGES SCALE:1:20

REV: 00

SHEET 1 OF 1

DO NOT SCALE DRAWING

EMAG HOLD OPEN (EN4/5)

MATERIAL:

01412440085 PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF SAFEHINGE LTD. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF SAFEHINGE LTD IS PROHIBITED.

DRAWN BY: CHECKED BY:

JY

Safehinge doorset x

DATE: 29-07-13 DATE:

A4

FREESWING (EN4)

- Approved Doc M compliant and CE marked - Installation savings vs. floor springs

SURFACE FINISH:

SYMPH

PROJECT:

UNLESS OTHERWISE SPECIFIED: DIMENSIONS ARE IN MILLIMETERS TOLERANCES: LINEAR: 0.25 ANGULAR: 0.75

DEBUR AND BREAK ALL SHARP EDG SCALE:1:20

SHEET 1 OF 1

DO N

Repeatable doorsets

BEDROOM - FUNCTIONAL

CORRIDOR - WIDE

BEDROOM - ORGANIC

EN-SUITE (LOCKBACK)

CORRIDOR - DOUBLE

COMMUNAL

Product efficiencies Doorset  Name

A

Bedroom  -­‐   functional

B

Bedroom  -­‐   organic

C

En-­‐suite  180   lock  back

D

Corridor  -­‐   single  (wide)

E

Corridor  -­‐   double

F

FD60

FD30

FD

Communal  -­‐   single

G

Fire  Rating Door  Core

FD30

FD30

NFR

FD30

F30

Blankfort  60

Blankfort  60

Blankfort  30

Blankfort  60

Blankfort  60

Blankfort  60

Bla

Leaf  width

926mm

1126mm

926mm

1126mm

926mm

926mm

92

Thickness

54mm

54mm

54mm

54mm

54mm

54

Hinge

ALU60

ALU60

44mm Continuous  geared   hinge  with  anti-­‐ ligature  cap.

ALU60

ALU60

ALU60

AL

RTS87  -­‐  mechanical   transom  closer Vistamatic  w/   Lifeline,  soft  close  -­‐   anti-­‐lig  thumb  turn

RTS80FLB  -­‐ freeswing  transom   closer Vistamatic  w/   Lifeline,  soft  close  -­‐   no  thumb  turn

No  closer Vistamatic  w/   Lifeline,  soft  close  -­‐   no  thumb  turn

RTS80EMB  -­‐  electro-­‐ RTS87  -­‐  mechanical   magnetic  hold  open   transom  closer transom  closer

RTS80EMB  -­‐  electro-­‐ RTS87  -­‐  mechanical   magnetic  hold  open   transom  closer transom  closer

RT tra

Toughened,  no   privacy

Toughened,  no   privacy

RTS87  -­‐  mechanical   transom  closer No  closer Vistamatic  w/   Lifeline,  soft  close  -­‐   Toughened,  no   anti-­‐lig  thumb  turn privacy

To pr

Stainless  steel  bead Timber  bead

Timber  bead

Stainless  steel  bead

Stainless  steel  bead Timber  bead

Stainless  steel  bead Timber  bead

Stainless  steel  bead Timber  bead

Sta

Primera  729A

Primera  730A*

Primera  729A

Primera  729A

Primera  729A

Primera  729A

Primera  PR3S  '46'

Primera  PR3S  '46'

Primera  PR3S  '76'

Primera  PR3S  '96'

Closer Vision  Panel

No  closer Vistamatic  w/   Lifeline,  soft  close  -­‐   no  thumb  turn

VP  Bead Handle Lockset Removable   Stop

MOVAstop  with   parking  /  lifeline

MOVAstop  hinged   with  lifeline

MOVAstop  with   parking  /  lifeline

MOVAstop  hinged   with  lifeline  key

Door  frame

SWIFTdor  -­‐  rapid   install  frame

Hardwood  timber

SWIFTdor  -­‐  rapid   install  frame

Hardwood  timber

SWIFTdor  -­‐  rapid   install  frame

Hardwood  timber

Primera  730A*

Primera  730A*

Primera  730A*

Primera  PR3S  '96'

MOVAstop  with   parking  /  lifeline

MOVAstop  hinged   with  lifeline  key

SWIFTdor  -­‐  rapid   install  frame

Hardwood  timber

SWIFTdor  -­‐  rapid   install  frame

Hardwood  timber

MOVAstop  with   parking  /  lifeline

MOVAstop  hinged   with  lifeline  key

SWIFTdor  -­‐  rapid   install  frame

Hardwood  timber

- Volume savings of ~20% - Installation savings of ~6% - Eliminate snagging with onsite adjustment and improved training (£££)

SW ins

Non product efficiencies Specification savings - BIM model integration - design efficiencies Design and consulation savings - Online database of mechanical testing (eg. HBN and DD171) - Evidence based design - client design and consultation efficiencies (3 - 6 months)

Philip Ross [email protected] 07809 870690 0141 244 0085

MENTAL HEALTH

Break and Exhibition Return 15:30 www.procure21plus.nhs.uk

Mental Health Windows Kevin Gorman/Neil Guest Britplas

www.procure21plus.nhs.uk

Windows • Britplas • Safevent system for natural ventilation • 2 year warranty and 12 month inspection/service • Fixed price to October 2016 • Up to 19% savings

An introduction to Britplas group

How it Started

What we do

Bespoke product development

Design

Fabrication

Installation

Maintenance

Strong track record in creating innovative fenestration products to solve sector-specific problems

In-house team with full BIM capability

42,000 sq ft factory in the north west manufacturing to ISO standards

Own skilled fitters who work to the highest standards under our experienced installation managers

Service extends to full aftercare and maintenance to guarantee maximum lifespan for your windows and doors

Trading History 14,000 12,000

11,890

9,868

10,000

£’000

11,333

10,915

New build and refurb projects from £10k to £3 million (window/door package value)

8,000 6,558 6,000 4,000

Over 400 projects completed in the UK and overseas

3,602

High percentage of revenue comes from repeat business

2,000 2009

2010

2011

2012

Turnover 2009-2014

2013

2014

Quality products and first rate service

Client Base Working with and for many of the UK’s leading building contractors Timely and professional installations in line with MC programmes

Uncompromising customers who expect the best Positive relationships with many NHS Trusts, private healthcare providers and LEA’s countrywide

Product Portfolio

Windows

Glazed doors

Curtain walling

Security fencing

The Safevent® window for Mental Health – Features and Benefits

The Multi Award Winning Safevent • • • • • • • •

Anti-ligature (suicide prevention) Restrict the ability to pass contraband Allow the flow of fresh air Highly energy efficient and contributes towards building sustainability Maintenance contracts available Easy to clean Safe and Secure Tried and Tested with over 25,000 installed

Casement Windows, Doors and Curtain Walling Full range of window types Both uPVC and aluminium windows to address all specification requirements

Standard and remote Door Systems Entry systems to meet every conceivable requirement and access challenge

Bespoke Curtain Walling Systems that are mutually compatible allowing for window, door, façade and roof systems can be integrated seamlessly.

In House Design Aesthetically pleasing, functional and technical specification compliant.

Accreditations BS OHSAS 18001 (Occupational Health and Safety Management Systems) ISO 9001 (Quality Management Systems) ISO 14001 (Environmental Management Systems) SAFE CONTRACTOR (Approved Contractor Scheme) FAIR TRADES (Member since 2006) Constructionline (public and private sector procurement) TRUSTMARK (Government endorsed standards) C0 VEA Risk Control Certificate (Premises Risk Improvement Report) Environment Agency (Certified Upper Tier Carrier Dealer) RESET (Competence management systems) Consumer Protection Association Approved Craftsmen FENSA (registered company) RICS listed (the mark of professionalism worldwide)



Our accreditations and certifications reflect our commitment to quality and professionalism in all areas of our business



CHAS (Health and Safety assessment scheme)

Colin Duncan, Projects Director

Post Project Aftercare

Health and Safety: above and beyond

0

Bespoke training course designed and developed for working in live mental health environments. Gained IOSH accreditation

Reportable major injuries 2012-2014

75% ISO

Reduction in minor injuries 2011-2014

9001, 18001 & 14001 accreditations gained

All senior management have received IOSH training

0

Patient suicides involving Safevent windows

Code of conduct specially developed for live environments

Workforce culture & training •









All manufacturing employees receive training to NVQ Level 2 in Window Operations as standard During 2014 98% of site-based employees completed NVQ Level 3 in Fenestration Installation Refresher training for first aid, manual handling, asbestos awareness, IPAF and PASMA training completed for all site employees during 2014 during site stand down week Top 100 apprentice employer and previously shortlisted for National Apprenticeship of the Year Awards All employees take part in our ‘Annual Away Day’ where business strategy, vision & values are shared

Our 40,000 sq ft manufacturing facility

Client feedback



Britplas demonstrated an excellent track record in the mental health sector and were highly proactive in providing innovative and high quality solutions to the fenestration requirements of the Kingsley Green project. Mike Trigg, Senior Project Manager Geoffrey Osborne Ltd



Britplas have an excellent understanding of the requirements of medium secure environments, gained through extensive experience in the mental health sector. We have also found them to be particularly proactive in working closely with the Trust to develop a value for money solution that is tailored to meet the specific requirements of this project, and we are delighted to have them on board as our fenestration partner.” John Atkins West London Mental Health Trust

P21+ Repeatable Rooms Offering – Mental Health • Standard Safevent Window for •

• •

Mental Health Repeatable Room – 5% Saving (approx £100 per room) Safevent Window (Bay with seat) for Mental Health Repeatable Room – 5% Saving (approx £184 per room) Britplas Assist - 24 Hour Emergency Call Out 2 Year Extended Warranty for P21+ Projects

P21+ Offering Mental Health

Bedroom Window (Standard):

Single Bedroom Window Eurocell/Aluprof/Smarts

Spec-

Safevent Internal sliding sash 2 point flush locking

RRP

P21+ Price

£1,781

£1,692

UPVC Coloured (limited colour range)

£1,951 £2,166

Aluminium (any RAL colour)

RRP

1300mm W X 1500mm H - Manual sliding Safevent Window 1300mm W X 550mm H - Fixed light below Glazing - 10mm Toughened soft coat /Argon Spacer / 6.4mm Laminated Anti ligature handle Anti ligature mesh (2mm holes on 3mm centres - 40.3% open area) Glazing : 10mm T Inner / argon spacer / 6.4mm Laminated 2 69% Total Light Transmission/g factor 0.41/U Value 1.9 W/m K

UPVC White

Saving

5%

1853

£98

5%

2057

£109

5%

P21+ Price

Safevent External siding sash 2 point flush locking

RRP

1300mm W X 1500mm H - External sliding Safevent Window 1300mm W X 550mm H - Fixed light below Glazing - 10mm Toughened soft coat /Argon Spacer / 6.4mm Laminated Anti ligature winder Anti ligature mesh (2mm holes on 3mm centres - 40.3% open area) Glazing : 10mm T Inner / argon spacer / 6.4mm Laminated 2 69% Total Light Transmission/g factor 0.41/U Value 1.9 W/m K P21+ Price

Saving

£45

5.00%

UPVC Coloured (limited colour range)

£998

£948

£50

5.00%

£1,586

£1,506

£80

5.00%

Single Bedroom Window Rapidvent

Spec -

£1,954

£1,856

£98

5%

UPVC Coloured (limited colour range)

£2,123

2016

£107

5%

£2,332

2215

£117

5%

Bedroom Window (Bay):

Spec -

RRP

Saving

% Saving

£1,055

£1,002

£53

5.00%

UPVC Coloured (limited colour range)

£1,124

£1,067

£57

5%

Aluminium (any RAL colour)

£1,460

£1,387

£73

5%

Multi Bedroom Windows Consultation Room

1300mm W X 1500mm H - External sliding Safevent Window 1300mm W X 550mm H - fixed light or insulated panel Glazing - 10mm Toughened soft coat /Argon Spacer / 6.4mm Laminated Glazing - 10mm Toughened soft coat /Argon Spacer / 6.4mm Laminated Anti ligature winder Bay seat detail within Iroko timber frame Glazing : 10mm T Inner / argon spacer / 6.4mm Laminated 2 69% Total Light Transmission/g factor 0.41/U Value 1.9 W/m K P21+ Price

P21+ Price

UPVC White

Image shown - Coloured PVC

Image shown - Aluminium

Safevent External siding sash 2 point flush locking

1240mm W x 2600mm H - 1 top hung vent with fixed top & bottom light Glazing - 6mm Toughened soft coat / Argon Spacer / 6.4mm Laminated Viso Mesh (4mm holes on 5mm centres - 58% open area ventilation)

% Saving

UPVC White

Aluminium (any RAL colour)

% Saving

£853

Image shown - Coloured PVC

Image shown - Coloured PVC

Spec-

Saving

£898

RRP

Bedroom Window :

1240mm W x 2600mm H - 1 top hung vent with fixed top & bottom light Glazing - 6mm Toughened soft coat / Argon Spacer / 6.4mm Laminated

UPVC White

Aluminium (any RAL colour)

% Saving £89

Spec -

Saving

% Saving

UPVC White

£3,304

£3,139

£165

5%

UPVC Coloured

£3,473

£3,299

£174

5%

Aluminium

£3,682

£3,498

£184

5% Image shown - Coloured PVC

Britplas will offer a discount of 5% on all window types that have been specified and drawn as part of the repeatable rooms project

You can always buy a “solution”

Britplas makes a difference…

Innovative Products with Therapeutic Value

In Summary Innovative Products

In-House design Ongoing Quality Control Experienced Deliver Team Unique Aftercare Reassuring Accreditations

Other Standard Components David Kershaw PSCP Programme Director

www.procure21plus.nhs.uk

Fire/Smoke Dampers • • • •

Advanced Air Fire/Smoke Damper with Adjustable Frame Fixed price to end 2016 Up to 40% savings

Radiant Panels • • • •

Pipe Centre and Sabiana Pulsar Ceiling Panels Fixed price to end 2016 Up to 28% savings

Final Q&A David Kershaw PSCP Programme Director

www.procure21plus.nhs.uk

Summary David Kershaw PSCP Programme Director

www.procure21plus.nhs.uk

Benefits – Potential Savings • Total potential saving: £30.24m, or c5.04%

(against typical market rates, and based on £600m total spend pa)

• • • • • • • • •

Flooring: £4.20m Doors: £3.84m Lighting: £2.52m Ceilings: £2.46m Bedhead Services: £1.98m Ceiling Hoists: £1.20m Sanitary Ware: £0.54m Radiant Panels: £0.48m Paint: £0.18m

• • • •

Partitions: £4.5m Pipework: £3.54m Chillers: £2.64m AHUs: £2.16m

This image cannot currently be display ed.

Accessing StandardShare www.procure21plus.nhs.uk/club/

Use of Standard Components • • • • •

Not mandatory HBN 00-08: Healthcare Estates and Facilities Client Charter Contract Works Information Guidance Note 19

Road to Savings

Benefit

20%+ Potential with: GCS 14.1% target Up to 5% target cost saving from Standard Components

Standardisation

Component development Component assemblies Repeatable Rooms Certainty of demand

Standard Component Catalogue • Available today • Updated as necessary • Repeatable Room Catalogue

Thoughts for today • Listen to what’s on offer • £1M saved in £4M of Orders • Why are you not benefiting from using Standard Components • Easy to access benefits, via StandardShare

Close Thank you! www.procure21plus.nhs.uk