Section 319 Biannual Report - APPENDIX - Illinois Environmental

October 30, 2017 | Author: Anonymous | Category: N/A
Share Embed


Short Description

, Woodford, Tazewell, and Marshall. Subgrantee: Peoria  Davis, Christine L. creeks in marshall county i ......

Description

State of Illinois Pat Quinn, Governor Illinois Environmental Protection Agency Lisa Bonnett, Director

______________________________________________________________________________________________________

State of Illinois Illinois Environmental Protection Agency Bureau of Water Watershed Management Section Nonpoint Source Unit

Section 319 Biannual Report - APPENDIX

FAA 3190902 – In-stream Restoration and Monitoring of Kickapoo Creek near Charleston, Illinois. This project restored 2,000 feet of bank and channel stability in combination with the establishment of deep pool habitats and riffles. Photos: Upper - conditions of banks before peak stone installation at BPV1 and BPV2: Lower Left - after installation; Lower Right - the single natural riffle in the restoration reach was undisturbed during construction.

Illinois Environmental Protection Agency

September 2014

 

TABLE OF CONTENTS Title

Page

FFY 1990 FEDERALLY FUNDED SECTION 319 PROJECTS Stormwater Management Assistance Program Wetland Protection Program Development Stream Corridor Initiative Construction Erosion Control Initiative Butterfield Creek Urban Nonpoint Source Management Plan Livestock Waste Regulation Pesticide Monitoring Survey Biological Data Management Regional Ground Water Protection Program and Needs Assessment

11 11 11 12 12 13 13 14 14 15

FFY 1991 FEDERALLY FUNDED SECTION 319 PROJECTS Butterfield Creek Detention Basin Retrofit Sealing of Abandoned Water Wells and Mine Holes Urban Site Drainage Training Course Construction Site Erosion Control Video Sequoit Creek Watershed Management Project (Phase 1) Sequoit Creek Watershed Management Project (Phase 2) Siloam Springs Riparian Protection Project Ground Water Ecotoxicity Assessment Ground Water Setback Zones Northeastern Illinois Community Assistance Project

15 15 16 16 17 17 18 18 19 19 19

FFY 1991 FEDERALLY FUNDED SECTION 319 GREAT LAKES SET ASIDE PROJECTS Waukegan River Bank Stabilization and Management Waukegan River Rock Riffle Restoration Project Nonpoint Source Pollution and Stream Ecology Exhibit Waukegan River Habitat Evaluation Project The Environment Exhibit

20 20 20 21 21 22

FFY 1992 FEDERALLY FUNDED SECTION 319 PROJECTS Assessment Procedures for Rural Ground Water Regional Ground Water Vulnerability Assessment Lake Pittsfield 314/319 Restoration Project National Monitoring Strategy Big Hollow Creek Watershed Management Project

22 22 22 23 23 24

FFY 1993 FEDERALLY FUNDED SECTION 319 PROJECTS Nature Preserves Ground Water Quality Protocol Paris Twin Lakes Restoration and Management Lake Taylorville Wetland Demonstration/Education National Monitoring Strategy on Lake Pittsfield Skokie River Restoration Project Constructed Wetlands and Sustainable Agriculture Areawide Animal Waste Team Nonpoint Source Control on Richland & Senachwine Creeks Charleston Side Channel Reservoir Shabbona Lake Shoreline and Watershed Protection Shallow Water Wetland Creation on Canyon Creek Chain-O-Lakes Fox River Shoreline and Bank Protection Palatine Streambank Stabilization Project

24 24 25 26 26 27 27 28 29 29 30 30 31 31

1

Title

Page

Paris Restoration/Protection 314/319 Project Nonpoint Source Pollution Concert/Celebration Chicagoland Environmental Network

32 32 33

FFY 1994 FEDERALLY FUNDED SECTION 319 PROJECTS Englewood Environmental Protection Lot Reclamation Skokie Lagoons Shoreline Stabilization Project Senachwine Creek Nonpoint Source Control Project Mauvaise Terre Creek Project Perry County Demonstration/Education Plots Macoupin County Public Water Supply Watershed Protection/Education Project City of Lockport Abandoned Well Sealing Project Southern Illinois No-Till Rental and Demonstration Project (Johnson County) Larkdale Lagoons Shoreline Stabilization Project Milne Creek Streambank Stabilization Project Grass Lake Nonpoint Source Pollution Control Project DeKalb County Streambank and No-Till Program Norton Creek Urban Stream Maintenance/Restoration Program Greenleaf Creek Streambank Stabilization Project Ninemile Creek Watershed Sinkhole Stabilization Project Ground Water Pollution Prevention Project National Monitoring Strategy on Lake Pittsfield Waukegan River National Monitoring Strategy Stream Restoration Manual National Monitoring Conference Nonpoint Source Pollution Awareness Through Advertisements GIS Technology Support for the Targeted Watershed Approach Southern Illinois No-Till Rental and Demonstration Project (Union County) NPS Information and Education Conference Joliet Arsenal Riparian Restoration Project Biotic Assessment of Watershed Management Practices Methodology Blue Creek Stream Restoration Project Macoupin County Public Water Supply Watershed Project The North Branch Chicago River Project – 2 Salt Creek Streambank Stabilization Project Nonpoint Source Pollution Book for Grades 3 through 5

33 33 34 34 35 36 36 36 37 37 38 38 39 39 40 41 41 42 42 43 43 43 44 44 45 45 46 46 47 47 48 49

FFY 1995 FEDERALLY FUNDED SECTION 319 PROJECTS Mackinaw River Project Lake Forest Wetland Demonstration Project Urban Erosion Control Project Chick Evans Golf Course Stream Protection Project Illinois Farm-A-Syst 60 Ways Farmers Can Protect Surface Water Phase 1 Implementation of the Flint Cr. Watershed Management Plan National Monitoring Strategy on Lake Pittsfield Waukegan River National Monitoring Strategy (Phase 2) Southwestern Illinois Karst Project Brookfield Zoo NPS Pollution Awareness Exhibit Shedd Aquarium NPS Pollution Awareness Exhibit (WaterWise) Lincoln Memorial Garden NPS Pollution Control Education Project Chicagoland Environmental Network Indian Lake Interpretation

49 49 50 51 51 52 52 53 53 54 54 55 56 56 57 57

2

Title

Page

Know Your Watershed Program Illinois River Watershed Display National Urban Water Quality Retrofit Conference

58 58 59

FFY 1996 FEDERALLY FUNDED SECTION 319 PROJECTS NPS Control in a Priority Ground Water Protection Planning Region North Branch Chicago River Watershed Project Indian Lake Wetlands Educational Interpretation Project Expansion of the Water Works Lab National Monitoring Strategy on Lake Pittsfield Waukegan River National Monitoring Strategy (Phase 3) Northeastern Illinois Community Assistance Office National NPS Pollution Information/Education Conference Proceedings Phase 2 Modeling on Lake Pittsfield Nonpoint Source Pollution Awareness Exhibit Evaluation for the Children’s Zoo Cache River Reforestation Project Tri-County Erosion, Sedimentation, and Stormwater Management Program North Fork Embarras Watershed Project Camp Creek Restoration and Watershed Management Milne Creek Phase 2 Project Klein Creek Project Chicagoland Environmental Network Southeast Illinois Oil Brine Damage Reclamation Project Determining the Effective Discharge of Illinois Streams Pittsfield National Monitoring Program

59 59 60 60 61 62 62 62 63 63 64 64 65 65 66 67 67 68 68 69 69 70

FFY 1997 FEDERALLY FUNDED SECTION 319 PROJECTS Honey Creek Watershed Project North Fork Vermilion River Project Upper Sangamon River Basin Water Quality Improvement Project Addison Creek Streambank Stabilization Project Streambank Stabilization of Springbrook No. 1 TAM Golf Course Streambank Stabilization Langendorf Pond Retrofit to Reduce Nonpoint Source Pollution National Monitoring Strategy on Lake Pittsfield Waukegan River National Monitoring Strategy (Phase 4) Des Plaines Streambank Restoration Project Alternative Pavement Deicing Materials Brochure Jefferson County Outdoor Educational Facility Glen Shoals Restoration Project Willoway Brook Streambank Stabilization Project Four Lakes Village Streambank Stabilization Project Stream Classification & Fish Sampling Protocols Initial Site Evaluation Procedure for Wetland Creation or Restoration Conservation Reserve Enhancement Program (CREP) Assistance

70 70 71 71 72 73 73 74 74 75 75 76 77 77 78 78 79 79 80

FFY 1998 FEDERALLY FUNDED SECTION 319 PROJECTS Cache River Watershed No Till Project Phase 2 Implementation of Flint Creek Watershed Management Plan Waukegan River Wetland Restoration Project Mitchell Park Ravine Watershed Project Ground Water Protection through Pollution Prevention

80 80 81 82 82 83

3

Title

Page

Reducing Herbicides with GPS Application Shelby Creek Restoration and Watershed Management Project Model Watershed for Water Quality Old Tavern Park Shoreline Stabilization Project Streambank Restoration on the West Branch, DuPage River Greater Eliza Watershed Project Mackinaw River Project (Phase 2) Waukegan River National Monitoring Program (Phase 5) Pittsfield National Monitoring Programs Chicagoland Environmental Network Northeastern Illinois Community Assistance Office Water Quality Enhancement Training Roosevelt Park Pond & Waukegan River Restoration Jacksonville Branch Restoration Project – Phase 1 Lake Pittsfield Shoreline Restoration Project Willoway Brook Streambank Stabilization Project – Phase 2 Lakeshore & Streambank Litter Collection Assistance Program

83 84 84 85 86 86 87 88 88 89 89 90 90 91 91 92 93

FFY 1999 FEDERALLY FUNDED SECTION 319 PROJECTS Palzo Surface Mine Project Indian Lake Festival (Dragonfly Marsh Opening) Explore! A Child’s Nature Conservation Reserve Enhancement Program (CREP) Assistance Chicagoland Environmental Network North Branch Chicago River Watershed Project – Phase 2 East Branch DuPage River WRAS Implementation – Phase 1 Macoupin Creek WRAS Development Little Vermilion River WRAS Development Total Maximum Daily Load & Implementation Plan Development Total Maximum Daily Load & Implementation Plan Development Conservation Reserve Enhancement Program (CREP) Assistance Conservation Reserve Enhancement Program (CREP) Assistance Watershed Management Coordination GIS Programming for BMP Location Mackinaw River Watershed Project – Woodford County Mackinaw River Watershed Project – Tazewell County Mackinaw River Watershed Project – NRCS Technical Support Village of Royal Lakes – Shad Lake Restoration Project Lincoln Memorial Garden NPS Control – Phase 2 Salt Creek Stabilization – Rolling Meadows Northwest Illinois Livestock Project

93 93 94 94 95 95 96 96 97 98 98 99 99 100 100 101 101 102 102 103 104 104 105

FFY 2000 FEDERALLY FUNDED SECTION 319 PROJECTS Pittsfield National Monitoring Program Waukegan River National Monitoring Program Northeastern Illinois Community Assistance Office Evaluation of Treated Swine Waste Application 2nd National NPS Pollution Control Information/Education Conference Farm Progress Show/Illinois State Fair 2000 Armitage Creek Project North Fork Embarras Watershed Project – Phase 2 Nutrient Management Plan Implementation Salt Creek Streambank Stabilization – Phase 2

105 105 106 106 107 107 108 108 109 109 110

4

Title

Page

North Fork Vermilion River Project – Phase 2 West Branch DuPage River Streambank Restoration – Phase 2 Senachwine Creek Watershed Project – Phase 2 Cache River Reforestation Project – Phase 2 Chicago Botanic Garden Lake WRAS Implementation Roof Greening Project Opening Salt Creek NPS Pollution Outreach & Education Total Maximum Daily Load Development Total Maximum Daily Load Development Old Salem Chautauqua Wetland Basin Project Total Maximum Daily Load Development Total Maximum Daily Load Development

111 111 112 113 113 114 115 115 116 116 116 117

FFY 2001 FEDERALLY FUNDED SECTION 319 PROJECTS Lake Branch WRAS (Nutrient Management Plan) Implementation Nonpoint Source Pollution Book – Phase 2 CREP & Watershed Management Education in Illinois Chicagoland Environmental Network Greater Eliza Watershed Project – Phase 2 Fox River WRAS Implementation Project Upper DesPlaines River WRAS Implementation Project Prentiss Creek Streambank Stabilization Project Salt Creek Streambank Stabilization – Phase 3 Rivers Rising Video Illinois Buffer Partnership Salt Creek TMDL Implementation Plan Execution – Phase 1 Total Maximum Daily Load Development Governor Bond Lake TMDL Implementation Plan Execution – Phase 1 Watershed Based Planning Assistance Fourth Ward Yard Nonpoint Source Pollution Control Demonstration Brewster Creek Monitoring Project Lake Paradise Wetland Restoration Project Brewster Creek Restoration Project Silver Creek Stabilization Ralph Welch Gully Stabilization

118 118 119 119 119 120 121 122 123 124 124 125 125 127 127 128 128 129 130 130 131 131

FFY 2002 FEDERALLY FUNDED SECTION 319 PROJECTS Priority Lake & Watershed Implementation Program North Fork Embarras Watershed Project – Phase 3 Nutrient Management Plan Implementation – Phase 2 Livestock Winter Feed Stations Demonstrations Green Roof System to Reduce Urban Runoff NPS Program Implementation Assistance Northern Illinois Community Assistance Office Conservation Reserve Enhancement Program (CREP) Assistance Lake Galena Watershed Project Morton Arboretum Parking Lot Runoff Control North Branch Chicago River Watershed Project Addison Creek Streambank Stabilization Otter Lake In-Lake Sediment Control Project East Branch DuPage River Tributary No. 6 Stream Restoration Vandalia Lake Water Quality Information & Education Ravinia Neighbors Association Sewer Stencil

132 132 133 133 134 135 136 136 137 137 138 139 139 140 141 141 142

5

Title

Page

Secret Agent Worm Website Rainfall Simulator/Crop Residue Demonstration Rig Rivers Rising Manure Management Workbook Tazewell County SWCD - Talbott Streambank Stabilization Long Lake Shoreline Stabilization Kickapoo Creek Monitoring Project Web-Based Illinois Manure Management Planner Total Maximum Daily Load Development

142 143 143 144 144 144 145 145 146

FFY 2003 FEDERALLY FUNDED SECTION 319 PROJECTS Lake Arlann Silt Abatement Project Evaluation of N Management Practices Conservation Practices Mapping and Assessment Watershed Planning in Northeastern Illinois Northeastern Illinois Stream Restoration Inventory Mitchell Park Ravine Watershed Project – Phase 2 Roof Greening Project Muddy Waters Pond Restoration Villa Park Urban BMP Demonstration Springbrook Creek Stream Meandering Governor Bond Lake Stormwater Basin No. 4 Fox Point North – Flint Creek Streambank Stabilization Lake Springfield Watershed BMP Implementation Addison Creek Riparian Restoration Hillsboro Lake Stormwater Wetland No. 1 Project Lake Vermilion Shoreline Stabilization Project North Fork Vermilion River Watershed Project Charleston SCR Sedimentation Basin Salt Creek Streambank Stabilization – Elk Grove Village Lyman Woods Streambank, Streambed, & Gully Stabilization Integrated Watershed Planning for Rayse Creek Stream Restoration Phase 2 – Trib. 6 to E. Br. DuPage R. RiverWorks Exhibit A Sustainable Community Based Approach to Reducing NPS Pollution Northeastern Illinois Stream Restoration Inventory Watershed Planning to Protect the Kishwaukee River Basin Hyacinth Place: Model Permeable Paver System Total Maximum Daily Load Development

146 146 147 147 148 148 149 150 151 152 152 153 154 154 155 156 156 157 157 158 158 159 160 160 161 161 162 162 163

FFY 2004 FEDERALLY FUNDED SECTION 319 PROJECTS Priority Lake & Watershed Implementation Program (PLWIP) Of Time and the River Green Roof Project on the McKessen Building, Rock Island Streambank Clean Up & Lakeshore Enhancement (SCALE) North Fork Embarras River Watershed Project – Phase 4 Protecting Water Quality in Urban Centers of Illinois Greater Eliza Watershed Project – Phase 3 Kaskaskia River Watershed Hypoxia Analysis Watershed Based Planning Homer Lake: Making it Clear.. One Household, One field at a Time Water Quality Strategic Research Initiative Watershed Based Plan Upgrades in Northeastern Illinois

163 163 164 165 165 166 166 167 167 168 169 170 170

6

Title

Page

Fox River Watershed Planning, Restoration, & Protection Upper DesPlaines River WRAS Implementation Conservation Reserve Enhancement Program (CREP) Assistance North Branch Watershed Project - Ongoing Implementation Phase NPS Program Implementation Assistance - Phase 2 Conservation Practices Mapping and Assessment Farm Progress Show Site BMP Project Regional Stormwater BMP Park Flint Creek Watershed Based Plan Watershed Capacity Building Waukegan River Restoration Project Total Maximum Daily Load Development

171 172 173 174 174 175 175 176 176 177 177 178

FFY 2005 FEDERALLY FUNDED SECTION 319 PROJECTS City of Chicago Best Management Practices Implementation Nonpoint Source Pollution Control Program Evaluation Lincoln Park Zoo South Pond Environmental Education Project Streambank Erosion Control in the Lake Galena Watershed Working with the Amish Manure Management Options for Swine Producers to Reduce NPS Pollution Bringing Wetlands to Life Through Restoration and Public Communication NRCS Urban Office Technical Assistance Patriot's Park Lake Phase 2 Implementation Springdale Restoration Project Stream Corridor Restoration Project - Phase 3 (Trib. 6) Poplar Creek Watershed Planning, Restoration, & Protection Armitage Creek Streambank Stabilization Watershed Based Plan Development for 303(d) Listed Waters Carlinville Lake Watershed Plan Governor Bond Lake Shoreline Stabilization No. 1 Jackson Creek Watershed Planning Technical Assistance for Green Infrastructure Projects Salt Creek Streambank Stabilization Kinkaid Lake TMDL Best Management Practices Implementation DuPage R. & Salt Cr. TMDL Implementation Project Monroe County Recharge Area Delineation Four Winds Way Creek Rehabilitation Green Roof Installation Project Total Maximum Daily Load Development

178 178 179 179 180 180 181 181 182 182 183 183 184 185 185 186 186 187 187 188 188 189 190 190 191 191

FFY 2006 FEDERALLY FUNDED SECTION 319 PROJECTS Otter Lake BMP Effectiveness Monitoring Project Waukegan River Water Quality Monitoring Animal Waste BMP Program Streambank Clean Up & Lakeshore Enhancement (SCALE) Watershed Protection, Restoration, and Education Metra Parking Lot Expansion BMPs North Branch Watershed Project-Implementation Phase 5 Permeable Lot Best Practices Project Adventures with Aqua Implementing BMPs in the Mossville Bluffs Watershed Updating the LaMoine River Watershed Management Plan Water Quality Testing at Countryside Lake Association

192 192 192 193 193 194 195 196 196 197 197 198 199

7

Title

Page

Watershed-Based Plan Development for Aux Sable Creek Kickapoo Creek National Monitoring Project Silver Creek Stabilization La Moine River Watershed Targeting for NPS Control Clinton Lake Watershed Social Indicator Effort Cermak/Blue Island BMP Demonstration Project La Moine River Outreach Program Total Maximum Daily Load Development

199 200 200 201 201 202 202 203

FFY 2007 FEDERALLY FUNDED SECTION 319 PROJECTS Low Impact Development Techniques in Madison County, Illinois Illinois LICA 2007 and 2008 Conservation Expos Conservation Reserve Enhancement Program (CREP) Assistance Protecting Water Quality in Urban Centers of Illinois-Phase 2 Libertyville Facility BMP Demonstration Project Fox River Stabilization Project DuPage River, Salt Creek TMDL Implementation Phase II North Branch Watershed Project - Implementation Phase 6 Otter Lake Shoreline Erosion Control LaMoine Livestock Exclusion Stabilization of White Pine Drainage Channel Kickapoo Creek Corridor Restoration Glacial Park Center Stormwater BMPs Clean Water: The Role of Trees and Vegetation Mid-Illinois River TMDL Education Geomorphic and In-channel Habitat Assessment of South Kickapoo Creek Mackinaw Riverbank Stabilization - Waibel Project Total Maximum Daily Load Development

203 203 204 204 205 205 206 207 207 208 209 209 210 210 211 212 212 213 213

FFY 2008 FEDERALLY FUNDED SECTION 319 PROJECTS Illinois Urban Manual Update & NPS Program Assistance Streambank Clean Up & Lakeshore Enhancement (SCALE) Resource Management Mapping Service South Pond Enhancement Demonstration & Education Project Watershed Capacity Building Fox River Watershed Restoration and Education Clinton Lake Watershed Clinton County Livestock Nutrient Management Project Bull Cr.-Bull's Brook & Indian Cr. Watershed-Based Plan Implementation BMP Implementation Addressing Highland Silver Lake TMDL BMP Implementation Addressing Kinkaid Lake Sedimentation & TMDL Barrington Area Community Outreach Program TMDL/Watershed Based Plan Adaptive Implementation Demonstration Project North Mill Creek Water Quality Study and Watershed Plan Embarras River Watershed Based Planning Clear Creek Watershed Plan Update Watershed Liaison Total Maximum Daily Load Development

213 213 214 214 215 216 216 217 218 218 219 220 220 221 221 222 222 223 223

FFY 2009 FEDERALLY FUNDED SECTION 319 PROJECTS North Fork Vermilion River Project - Phase 4 In-stream Restoration and Monitoring of Kickapoo Creek near Charleston, Illinois Silver Creek Stabilization

8

224 224 224 225

Title

Page

Joliet Junior College Lake Clean-up and Management Holiday Shores Lake Watershed Sediment and Nutrient Reduction Project Flint Creek Watershed Plan Implementation Projects Early Childhood Center Water Quality Improvement Project West Branch of the DuPage River Improvement Project Lake Sara Shoreline Protection Project Implementation of BMPs Addressing Cedar Lake Nippersink Watershed Assessment / Watershed Manager BMP Implementation in Fulton and McDonough Counties, Illinois Kickapoo Creek Corridor Restoration Phase 2 Roosevelt Park Stormwater BMPs and Education East Branch Kishwaukee River Watershed-Based Plan Total Maximum Daily Load Development

9

225 226 227 228 228 229 229 230 231 231 232 233 233

10

FFY 1990 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Stormwater Management Assistance Program Purpose: General stream maintenance was performed under this project. Beaver dams were removed from Klein Creek (ILGBK05). Debris removal, canopy thinning, and bank re-vegetation were performed on 0.98 miles of Sawmill Creek (ILGJ01) and 5.15 miles of Winfield Creek (ILGBK05). Biotechnical streambank stabilization (A-jacks, lunkers, willows, and rock weir) was performed on 500 feet of Glencrest Creek (ILGBL10). Project Location:

DuPage County

Subgrantee: DuPage County Department of Environmental Concerns DuPage Center, 421 North County Farm Road Wheaton, Illinois 60187 Project Reports and Other Informational Materials: "Final Report: DuPage County Stream Maintenance and Streambank Stabilization Demonstration Project." May 1993. DuPage County Department of Environmental Concerns. "DuPage County Stream Maintenance Program Report." Stormwater Management Committee.

July 1991.

DuPage County

BMP Implementation Summary: BMP Code 580

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 32,866 ft. 328 205 559

BMP Name Streambank/Shoreline Protection

90-3(319)SR

Title: Wetland Protection Program Development Purpose: Two parcels of land, totaling approximately 242 acres, were acquired for wetland protection in areas of the Cache River (ILIX04) basin. Project Location:

Johnson County

Subgrantee: Illinois Department of Conservation 524 South Second Street Springfield, Illinois 62707 BMP Implementation Summary: BMP Code 006

BMP Name Wetland Acquisition

Amount 242 ac.

90-9(319)SR

11

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) NA NA NA

Title: Stream Corridor Initiative Purpose: Environmentally sound biotechnical practices were implemented to arrest streambank erosion on a section of the Middle Fork of the Vermilion River (ILBPK07). Project Location:

Vermilion County

Subgrantee: Illinois Department of Conservation 524 South Second Street Springfield, Illinois 62701 Project Reports and Other Informational Materials: "Vegetative Restoration of Middle Fork Bank Erosion." December 1993. Illinois State Water Survey. "Middle Fork Streambank Restoration Project." December 1993 (videotape). Illinois State Water Survey. BMP Implementation Summary: Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.)

BMP Code

BMP Name

Amount

580

Streambank/Shoreline Protection

1,000 ft. 83

70

140

90-5(319)SR

Title: Construction Erosion Control Initiative Purpose: A multi-county implementation plan and ordinance was prepared which identified the inadequacies of existing regional soil erosion and sedimentation control programs, identified and evaluated experimental and innovative management alternatives and their applicability in the region, and recommended specific actions to reduce, eliminate, and regulate soil erosion. The project attempted to achieve agreement among local governments relating to the nature and scope of the implementation plan and ordinance. Project Location:

Counties of Peoria, Woodford, Tazewell, and Marshall

Subgrantee: Peoria County Department of Land Resources Peoria County Court House 324 Main Street Peoria, Illinois 61602

12

Project Reports and Other Informational Materials: "Implementation Plan for a Soil Erosion and Sedimentation Control Program for Marshall, Peoria, Tazewell, and Woodford Counties." June 1992. Environmental Science & Engineering, Inc. 90-1(319)SR

Title: Butterfield Creek Urban Nonpoint Source Management Plan Purpose: An assessment was prepared which defined the specific causes of nonpoint source impairment based on water quality and physical stream conditions. The significance of suspected nonpoint sources was identified and prioritized. A Preliminary Nonpoint Source Management Plan for Butterfield Creek (ILHBDB03) was prepared which recommended a control program addressing both structural and nonstructural measures to mitigate existing problems and minimize future impacts. Project Location:

Cook County

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: "Development of an Urban Nonpoint Source Management Plan for Butterfield Creek." October 1991. Northeastern Illinois Planning Commission. 90-2(319)SR

Title: Livestock Waste Regulation Purpose: Livestock operation owners and operators were educated and advised on regulatory restrictions, site design, land application practices, and utilization of management practices such as filter strips. Project Location:

Statewide

Subgrantee: Not Applicable Project Reports and Other Informational Materials: "Utilizing Livestock Waste Efficiently." June 1991. Illinois Environmental Protection Agency. "Understanding the Pollution Potential of Livestock Waste." June 1991. Illinois Environmental Protection Agency.

13

"Tax Certification Program for Livestock Waste Management Facilities." June 1991. Illinois Environmental Protection Agency. "Livestock Waste Management Program - General Slide Presentation." August 1991. Illinois Environmental Protection Agency. "Livestock Waste Management Program - Technical Slide Presentation." August 1991. Illinois Environmental Protection Agency. "Vegetative Filter Systems - Slide Presentation." Protection Agency.

August 1991.

Illinois Environmental

"A Systematic Approach to Best Management Practices for Illinois Livestock Waste-Handling Facilities." 1991. Illinois Environmental Protection Agency. 90-7(319)SR

Title: Pesticide Monitoring Survey Purpose: The United States Geological Survey (USGS), as part of the Toxic Substances Hydrology Program, in cooperation with the Illinois EPA installed automatic samplers for the collection of surface water samples in three watersheds in Illinois. The samples were used to determine the magnitude and duration of concentrations of triazine herbicides during the first runoff event following the application of herbicides in 1990. The three sites were selected to represent different areas of the state and different size drainage basins. The predominate land use in the selected sites is agricultural with a crop rotation of corn and soybeans. Project Location:

Counties of Iroquois, Piatt, and St. Clair

Subgrantee: U.S. Geological Survey 102 East Main Street Urbana, Illinois 61801 Project Reports and Other Informational Materials: "U.S. Geological Survey Toxic Substances Hydrology Program -- Proceedings of the Technical Meeting, Monterey, California, March 11-15, 1991." U.S. Geological Survey. 90-8(319)SR

Title: Biological Data Management Purpose: The Illinois EPA enhanced its watershed assessment capabilities, including improved data management, assessment of key nonpoint source pollution indicators, and greater utilization of biological indicators through the use of the Biological Data System (BIOS).

14

Project Location:

Statewide

Subgrantee: Not Applicable 90-4(319)SR

Title: Regional Ground Water Protection Program and Needs Assessment Purpose: Well site surveys were utilized to identify specific locations for maximum setback zones and initiate regulating procedures to restrict land use activities within those zones as a demonstration of the setback initiative as a ground water protection practice. Cost-share assistance was provided for demonstration purposes to a geographically select group of municipal water supply authorities to conduct needs assessments for long term protection of ground water. Project Location:

Counties of McHenry, Boone, Winnebago, Peoria, and Tazewell

Subgrantee: Not Applicable Project Reports and Other Informational Materials: "Illinois Groundwater Protection Program: Pilot Groundwater Protection Needs Assessment for Pekin Public Water Supply Facility Number 1795040." November 1992. Illinois Environmental Protection Agency. 90-6(319)RM

FFY 1991 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Butterfield Creek Detention Basin Retrofit Purpose: A stormwater detention basin was redesigned and retrofitted to provide water quality benefits to Butterfield Creek (ILHBDB03). Documentation was provided for the retrofit of the basin, the effectiveness of the basin, and the estimated cost and impact of a watershed wide retrofit program. Project Location:

Cook County

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Flossmoor Stormwater Detention Basin Retrofit: A Demonstration of Detention Basin Modifications to Improve Nonpoint Source Pollution Control.” August 1995. Northeastern Illinois Planning Commission.

15

“Stormwater Detention Basin Retrofitting: Techniques to Improve Stormwater Pollutant Removal and Runoff Rate Control.” 1995 (brochure). Northeastern Illinois Planning Commission. BMP Implementation Summary: BMP Code 800

BMP Name Urban Stormwater Wetland

Amount 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 68 278

91-1(319)SR

Title: Sealing of Abandoned Water Wells and Mine Holes Purpose: 180 abandoned mine holes and/or water wells in JoDaviess County were sealed in accordance with procedures and specifications developed by the Illinois Department of Public Health. In cooperation with the Cooperative Extension Service and County Health Department, demonstrations on the proper sealing of mine holes and water wells were conducted. Project Location:

JoDaviess County

Subgrantee: JoDaviess County Soil & Water Conservation District 227 North Main Street Elizabeth, Illinois 61028 BMP Implementation Summary: BMP Code 005

BMP Name Well Sealing

Amount 180 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) N/A ? ?

91-2(319)CD

Title: Urban Site Drainage Training Course Purpose: A three day training course was developed and presented which was designed to educate consulting engineers, landscape architects, contractors, permit reviewers and inspectors, and other governmental agency staff in the incorporation of nonpoint source control best management practices into urban drainage design. The course focused on minimizing the impacts of development on stream uses caused by decreased low flows, increased high flows, increased duration of high flows, and increased pollutant loadings. Project Location:

Statewide

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097

16

Project Reports and Other Informational Materials: "Urban Stormwater Best Management Practices for Northeastern Illinois - Course Notebook." April, 1993. Northeastern Illinois Planning Commission. 91-4(319)ME

Title: Construction Site Erosion Control Video Purpose: A videotape was prepared and produced describing the basic concepts and procedures for minimizing the effects of erosion through construction site planning and design, soil stabilization, sediment and runoff controls, and site inspection and maintenance. The videotape provides guidance on control practices and recommends more detailed references for designing and implementing specific controls. Project Location:

Statewide

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: "Erosion and Sediment Control - Procedures and Practices for Construction Sites.” 1993 (18 min. videotape). Northeastern Illinois Planning Commission. 91-6(319)ME

Title: Sequoit Creek Watershed Management Project (Phase 1) Purpose: Information was compiled for the preparation of a nonpoint source analysis of the Sequoit Creek watershed along with specific nonpoint source management plans to address identified problems. Technical assistance was provided to local governments in reviewing soil erosion and sedimentation control plans. Baseline monitoring water quality data for lakes in the Sequoit Creek watershed were collected and compiled. Project Location:

Lake County

Subgrantee: Lake County Soil & Water Conservation District 70 South U.S. Highway 45, Suite 205 Grayslake, Illinois 60030-2208 91-5(319)ME

17

Title: Sequoit Creek Watershed Management Project (Phase 2) Purpose: Building upon the information collected under Phase 1, a nonpoint source analysis of the Sequoit Creek watershed was prepared along with specific nonpoint source management plans to address identified problems. Project Location:

Lake County

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Sequoit Creek Watershed Management Project - Final Report.” January 1995. Northeastern Illinois Planning Commission. “Sequoit Creek Watershed Management Project - Watershed Inventory Reports.” January 1995. Northeastern Illinois Planning Commission. 91-5(319)ME

Title: Siloam Springs Riparian Protection Project Purpose: Vegetative grade controls were constructed in the Siloam Springs Lake (ILRDB) watershed which were designed to trap and treat pollutants in the water prior to its discharge to the lake as well as to enhance and protect recreation and wildlife resources of the watershed. Project Location:

Adams County

Subgrantee: Illinois State Water Survey c/o University of Illinois 506 South Wright Street Urbana, Illinois 61801 Project Reports and Other Informational Materials: “Watershed Restoration in Siloam Springs State Park.” November 4, 1994 (videotape). Illinois State Water Survey. “Preservation of Siloam Springs State Park by the Stabilization of Its Wooded Ravines.” December 1, 1994. Illinois State Water Survey. BMP Implementation Summary: BMP Code 410

BMP Name Grade Stabilization Structure

Amount 23 (no.)

18

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

91-3(319)GE

Title: Ground Water Ecotoxicity Assessment Purpose: This project supported the scientific development of a ground water ecotoxicity assessment and field sampling protocol. The development process targeted testing sites to evaluate nonpoint source contributions. Project Location:

Statewide

Subgrantee: Not Applicable 91-9(319)RM

Title: Ground Water Setback Zones Purpose: This project continued the Illinois EPA's efforts directed at identifying and regulating certain activities around community wells by proposing maximum setback zones. The Illinois EPA used available hydrogeologic information, monitoring, survey, and needs assessment data to propose maximum zones in priority areas where no local action has been taken. The process considered nonpoint source impacts and assessments. Additionally, the Illinois EPA evaluated wells utilizing alluvial aquifers that are 1,000 feet from public waters for the purpose of proposing maximum zones. Section 14.3(f) of the Illinois Groundwater Protection Act provides authority to establish maximum setback zones up to 2,500 feet from the wellhead. Maximum setback zones established in these settings prohibit new potential routes. New potential routes include drainage wells of all kinds. Three maximum setback zones were proposed. Project Location:

Statewide

Subgrantee: Not Applicable 91-7(319)RM

Title: Northeastern Illinois Community Assistance Project Purpose: Funding was provided to help establish the Northeastern Illinois Community Assistance Office to serve the six county northeastern Illinois area. This office provides nonpoint source pollution control related technical assistance to the soil and water conservation districts, planning commissions, county departments, townships and municipalities. In addition to direct technical assistance, the staff of this office are an expansion of the existing effort to develop the Urban Best Management Practices Standards and Specifications Field Office Technical Office Guide. The major focus of the office is on erosion/sediment control, water quality, and natural resource management.

19

Project Location:

Counties of Lake, McHenry, Kane, DuPage, Cook, and Will

Subgrantee: USDA Soil Conservation Service 1902 Fox Drive Champaign, Illinois 61820 94-27(319)ME

FFY 1991 FEDERALLY FUNDED SECTION 319 GREAT LAKES SET ASIDE PROJECTS Title: Waukegan River Bank Stabilization and Management Purpose: Vegetative (grasses, dogwoods, and willows) and structural (A-jacks and lunkers) streambank stabilization was performed on the Waukegan River (ILQCA01) at Washington Park and Powell Park. City and Park District personnel were trained in practice implementation. Nonpoint source regulations were also developed. Project Location:

Lake County

Subgrantee: Waukegan Park District 2000 Belvidere Street P.O. Box 708 Waukegan, Illinois 60079 Project Reports and Other Informational Materials: "Nonpoint Pollution Control in Urban Streams.” November 1992 (5.42 min. videotape). Illinois State Water Survey. "Nonpoint Source Control.” September 1993 (videotape). Illinois State Water Survey. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 780 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 64 55 109

91-9(319)SR

Title: Waukegan River Rock Riffle Restoration Project Purpose: Six stone weirs (riffles) were created on the Waukegan River (ILQCA01) in Washington Park which were designed to reduce channel incision (erosion of the streambed), enhance habitat, improve stream stability, and increase water aeration. Project Location:

Lake County

20

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 Project Reports and Other Informational Materials: “Pool and Riffle Restoration on the Waukegan River.” December 1996. Illinois State Water Survey. BMP Implementation Summary: BMP Code 584

BMP Name Stream Channel Stabilization

Amount 600 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 58 49 98

91-10(319)SR

Title: Nonpoint Source Pollution & Stream Ecology Exhibit Purpose: An exhibit was designed, constructed, and placed on display at the Shedd Aquarium in Chicago. The exhibit includes a divided aquarium with one half designed to resemble a healthy stream environment and the other half illustrating polluted stream conditions. Both halves were stocked with fish species of an appropriate pollutant tolerance level and native to Illinois. The qualities indicative of a healthy and degraded stream environment were identified and described. The exhibit also presents information concerning the nonpoint sources of pollution which threaten the quality of Illinois’ streams and the methods by which those threats may be minimized. The purpose of this project is to enhance the public’s understanding of the value and function of streams, nonpoint source pollution and its impact on water quality, and what can be done to protect Illinois’ water resources. Project Location:

Cook County

Subgrantee: John G. Shedd Aquarium 1200 South Lake Shore Drive Chicago, Illinois 60605 91-11(319)SR

Title: Waukegan River Habitat Evaluation Project Purpose: This project created a process to establish a quantifiable habitat index for the Waukegan River rehabilitation project and to enhance the Waukegan River National Monitoring Strategy. A habitat index was established for the Waukegan River related to existing and proposed water quality conditions. A report was prepared documenting utilization of the habitat index on a local and regional scale. Project Location:

Lake County

21

Subgrantee: Not Applicable 91-12(319)SR

Title: The Environment Exhibit Purpose: This Environment Exhibit was designed to present key concepts and principles of environmental science and technology and thereby help people examine, understand, and affect environmental issues. Information on nonpoint source pollution and related water quality issues was incorporated into the exhibit. The exhibit communicates the impacts of nonpoint source pollution, the importance of water quality protection, and what can be done to minimize nonpoint source pollution and protect water quality. Project Location:

Cook County

Subgrantee: Museum of Science and Industry 57th Street and Lake Shore Drive Chicago, Illinois 60637-2093 91-15(319)SR

FFY 1992 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Assessment Procedures for Rural Ground Water Purpose: A series of site assessment and information documents were prepared to assist farmers in identifying potential farmstead sources of ground water contamination and in prioritizing management and structural changes to minimize the risk of ground water pollution. The Illinois Department of Agriculture (IDOA) developed ground water protection materials tailored to Illinois' needs, conducted a pilot program utilizing these materials, printed and distributed copies of the materials to farmers wishing to participate, and held three regional training workshops for soil and water conservation district staff using the developed materials. Project Location:

Statewide

Subgrantee: Illinois Department of Agriculture State Fairgrounds, P.O. Box 19281 Springfield, Illinois 62794-9281 92-1(319)JC

Title: Regional Ground Water Vulnerability Assessment

22

Purpose: A program was established to identify those regions of the state that are vulnerable to agricultural chemical ground water contamination, and determine what management practices are the most effective for reducing the threat of contamination. The Illinois Department of Agriculture (IDOA) correlated geologic/hydrologic data with pesticide-soil interaction data and agricultural chemical use to identify those regions of Illinois with high potential for ground water contamination. IDOA also researched and reviewed ongoing management strategies and recommended management practices for reducing the threat of aquifer contamination. Project Location:

Statewide

Subgrantee: Illinois Department of Agriculture State Fairgrounds, P.O. Box 19281 Springfield, Illinois 62794-8281 Project Reports and Other Informational Materials: “Identification of Areas Vulnerable to Groundwater Contamination in Illinois, Recommended Management Practices.” July 1995. Illinois Department of Agriculture.

and

92-2(319)JC

Title: Lake Pittsfield 314/319 Restoration Project Purpose: This project demonstrated the cumulative effectiveness in reducing sediment transport to Lake Pittsfield (ILRDP) of a single sediment basin on the upper end of Lake Pittsfield and a series of small settling basins (ponds) located on minor tributaries prior to their discharge into Blue Creek. This project supplements the implementation of recommendations contained in the Phase I report funded under Section 314 and to be achieved through Phase II. Project Location:

Pike County

Subgrantee: Pike County Soil & Water Conservation District 1319 West Washington Street Pittsfield, Illinois 62363 BMP Implementation Summary: BMP Code 350 378

BMP Name Sediment Basin Pond

Amount 1 (no.) 29 (no.)

92-3(319)GE

Title: National Monitoring Strategy

23

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? ? ? ?

Purpose: This project demonstrated the effects of land management on Lake Pittsfield (ILRDP) sedimentation and water quality. Project Location:

Pike County

Subgrantee: Illinois State Water Survey c/o University of Illinois 109 Coble Hall, 801 S. Wright St. Champaign, Illinois 61820 Project Reports and Other Informational Materials: “Effects of Land Management on Lake Pittsfield Sedimentation and Water Quality.” September 1993. Illinois State Water Survey. 92-4(319)GE

Title: Big Hollow Creek Watershed Management Project Purpose: Both structural grade control and vegetative stabilization were implemented in the urban Big Hollow Creek watershed to control stream and bluff erosion. Project Location:

Peoria County

Subgrantee: Heartland Water Resources Council of Central Illinois Commerce Bank Building 416 Main Street, Suite 828 Peoria, Illinois 61602-1116 Project Reports and Other Informational Materials: “Big Hollow Creek Watershed Management Project.” (videotape) 1995. Heartland Water Resources Council of Central Illinois. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 1,200

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 127 108 216

92-5(319)ME

FFY 1993 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Nature Preserves Ground Water Quality Protocol Purpose: The primary objectives of this project were to design, develop, and demonstrate a methodology to determine potential threats to groundwater and the detection of

24

potential damage to Nature Preserves due to off-site activities from agricultural practices and urbanization. This was accomplished by determining where sites occur in relation to sensitive aquifers and developing geohydrologic information on those Nature Preserves which are estimated to contain unique habitats related to ground water discharge. On one site, a detailed geologic/hydrologic characterization was conducted. Project Location:

Statewide

Subgrantee: Illinois Nature Preserve Commission 524 South Second Street Springfield, Illinois 62701-1787 93-1(319)ST

Title: Paris Twin Lakes Restoration and Management Purpose: This project demonstrated a holistic approach to in-lake and watershed treatment to enhance the water quality and recreational uses of Paris Twin Lakes (ILRBL, ILRBX) through the coordination of the Section 314 Federal Clean Lakes Program and the Section 319 Nonpoint Source Management Program. This was accomplished utilizing 319 funds to implement 8 grassed waterways, 4,800 feet of terraces, 500 feet of waterway diversions, 1 rock chute, 2 concrete block chutes, rip rap streambank stabilization, 1 concrete crossing, 5.2 acres of buffer zones, and 1 sediment retention basin. Project Location:

Edgar County

Subgrantee: Edgar County Soil & Water Conservation District R.R. # 6, Post Office Box 89C Paris, Illinois 61944 Project Reports and Other Informational Materials: “Paris Twin Lakes Restoration and Management – Final Report.” November 1, 1998. Edgar County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 412 638 378 410 580 600 329

BMP Name Grassed Waterway Water & Sediment Control Basin Pond Grade Stabilization Structure Streambank/Shoreline Protection Terrace Conservation Tillage

Amount 13.9 ac. 1 (no.) 1 (no.) 3 (no.) 200 ft. 4,800 ft. 4,206 ac.

93-2(319)JC

25

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?

Title: Lake Taylorville Wetland Demonstration/Education Purpose: The city of Taylorville implemented a public education program highlighting Lake Taylorville (ILREC) and its water quality. Five sediment basins and five wetlands were designed, constructed, and vegetated to reduce sedimentation to the lake and to improve water quality through the additional nutrient uptake. Wetland training workshops were held concerning topics such as wetland construction, wetland vegetation, and/or wetland maintenance. News releases were also issued concerning project implementation. Project Location:

Christian County

Subgrantee: City of Taylorville Municipal Building 115 North Main Taylorville, Illinois 62568 Project Reports and Other Informational Materials: “Water Quality Improvement of Lake Taylorville through Construction of Sediment Basins and Wetland Sites.” August 1995. Christian County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 350

BMP Name Sediment Basin

Amount 10 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

93-3(319)CD

Title: National Monitoring Strategy on Lake Pittsfield Purpose: This project identified sources of sediment and the efficiency of sedimentation control practices on the tributary watershed of Lake Pittsfield. This project was initiated with Section 319 funding in FFY92. The project is a cooperative Section 314/319 effort for lake restoration and water quality improvement. Project Location:

Pike County

Subgrantee: Illinois State Water Survey 1320 S.W. Monarch Peoria, Illinois 61

26

Project Reports and Other Informational Materials: “Effects of Land management on Lake Pittsfield Sedimentation and Water Quality.” September 30, 1994. Illinois State Water Survey. 93-4(319)GE

Title: Skokie River Restoration Project Purpose: Through the implementation of bank stabilization and restoration techniques, this project mitigated nonpoint source pollution to the Skokie River (ILHCCD09) and downstream lagoons. The project also enhanced the aquatic habitat and uses of the Skokie River. Restoration measures applied include: prairie buffer plantings, created oxbow excavations, restored floodplain wetlands, bank stabilization through brush layering with willows and dogwoods, bank toe protection and redirected thalweg through use of biologs with prairie cord grass and emergent wetland plants, willow posts for protection of rip rap and outlet pipes and weir wall, in-stream habitat structure (riffles), and bank stabilization through 3 foot buffer along entire stream. A multi-faceted educational program was also implemented as part of the project. Project Location:

Cook County

Subgrantee: Chicago Botanic Gardens Post Office Box 400 Glencoe, Illinois 60022 Project Reports and Other Informational Materials: “Restoration of the Skokie River: Natural Techniques at Work.” 1996 (videotape). Chicago Botanic Garden. “Skokie River Restoration Project.” May 1996. Chicago Botanic Garden. BMP Implementation Summary: BMP Code 580 657

BMP Name Streambank/Shoreline Protection Wetland Restoration

Amount 9,550 ft. 1.1 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 263 223 446 ? ? ?

93-5(319)SR

Title: Constructed Wetlands & Sustainable Agriculture Purpose: This project constructed three small wetlands within the small watershed of a tributary of Richland Creek – South (ILOC04) to filter contaminants from surface water. The project was designed to determine the effects sustainable agricultural

27

practices have on reducing nitrate and pesticide levels in surface water and also established an education and information program. Project Location:

St. Clair County

Subgrantee: Illinois Department of Agriculture Division of Natural Resources State Fairgrounds, P.O. Box 19281 Springfield, Illinois 62794-8281 Project Reports and Other Informational Materials: “Wetlands – Natural Resource Wonders.” 1998. Illinois Department of Agriculture. “Constructed Wetlands and Sustainable Agriculture – Final report.” August 1, 1998. Illinois Department of Agriculture. BMP Implementation Summary: BMP Code 657

BMP Name Wetland Restoration

Amount 6.3 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

93-6(319)JC

Title: Areawide Animal Waste Team Purpose: Additional technical assistance was provided to livestock producers to reduce the backlog of requests. Operators were informed of best management practices (BMP) for animal waste management, and assisted in exploring and developing innovative technology to solve waste handling and runoff problems. Project Location:

15 counties within the Southwestern Illinois RC & D

Subgrantee: Southwestern Illinois Resource Conservation and Development 406 East Main Street Mascoutah, Illinois 62258 Project Reports and Other Informational Materials: “Improving Rural Water Quality – An Areawide Animal Waste Team – Final Report.” March 1996. Southwestern Illinois Resource Conservation and Development, Inc. 93-7(319)JC

28

Title: Nonpoint Source Control on Richland & Senachwine Creeks Purpose: To promote local control of nonpoint source pollution, a program of public education was conducted within the rural watersheds of Richland and Senachwine Creeks. The widespread implementation of biotechnical streambank stabilization projects was encouraged through 1) press releases in local news media, 2) construction of a mobile stream table which demonstrates erosion processes and its use at public events, 3) development of model operation and maintenance plans for potential streambank stabilization projects, and 4) outreach to local landowners. Project Location:

Counties of Woodford & Marshall

Subgrantee: Heartland Water Resources Council of Central Illinois Commerce Bank Building 416 Main Street, Suite 828 Peoria, Illinois 61602-1116 93-8(319)CD

Title: Charleston Side Channel Reservoir Purpose: This project involved the application of an innovative shoreline erosion control program including willow planting posts, a raft wave barrier test program, rip rap and gabions where needed, and selective lakeshore tree removal on Charleston Side Channel Reservoir (ILRBC). In addition, the city conducted an educational program through Eastern Illinois University and the Charleston High School. A watershed landowner survey was done, with the information being used to create an educational brochure. Project Location:

Coles County

Subgrantee: City of Charleston 520 Jackson Avenue Charleston, Illinois 61920 Project Reports and Other Informational Materials: “Charleston Side Channel Reservoir Section 319 Grant, Non-point Sources Pollution Control Final Report.” July 1996. City of Charleston. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 5,300 ft.

93-9(319)CD

29

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 219 186 372

Title: Shabbona Lake Shoreline & Watershed Protection Purpose: This project protected Lake Shabbona (ILVTU) from further sedimentation by constructing a wetland (sediment basin) in a portion of the lake's watershed. No-till practices were promoted and a no-till drill made available for rental by farmers in the watershed. Shoreline stabilization (4,000 feet) on the lake was also implemented. Project Location:

DeKalb County

Subgrantee: DeKalb County Soil & Water Conservation District 315 North Sixth Street Dekalb, Illinois 60115 BMP Implementation Summary: BMP Code 350 580

BMP Name Sediment Basin Streambank/Shoreline Protection

Amount 1 (no.) 4,000 ft

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 2,200 ? ? 264 224 449

93-10(319)CD

Title: Shallow Water Wetland Creation on Canyon Creek Purpose: Construction of an embankment across the Illinois Canyon Creek created a one acre shallow pool designed to reduce stream velocities, trap sediment, and develop a shallow water wetland. Efforts were made during planning and design to increase the water retention time to maximize water quality benefits. A field day was held for the public once the practice was installed. Project Location:

LaSalle County

Subgrantee: LaSalle County Soil & Water Conservation District Route 23 & Dayton Road Ottawa, Illinois 61350 Project Reports and Other Informational Materials: “Illinois Canyon Creek Project – An EPA 319 Non-Point Pollution Reduction Project – LaSalle County SWCD.” November 1995. LaSalle County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 350

BMP Name Sediment Basin

Amount 1 (no.)

93-11(319)JC

30

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

Title: Chain-O-Lakes Fox River Shoreline & Bank Protection Purpose: This project implemented bio-technical methods of shoreline and bank protection, giving significant emphasis to more natural or vegetative solutions and nonstructural management solutions. Three sites, totaling 461 feet of on-stream lake shoreline on the Fox River (ILDT22) were stabilized using A-Jacks, fiber roll, erosion control blankets, Fiberdam, and vegetation. Project Location:

McHenry County

Subgrantee: Chain-O-Lakes Fox River Waterway Management Agency 64 East Grand, P.O. Box 451 Fox Lake, Illinois 60020 Project Reports and Other Informational Materials: “Protecting Your Shore - Alternatives to Seawalls.” (Brochure) January 1995. Fox Waterway Agency. “Chain O’ Lakes Fox River Shoreline and Bank Protection Project – Final Report.” Fall 1995. Fox Waterway Agency. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 461 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 71 61 120

93-12(319)ME

Title: Palatine Streambank Stabilization Project Purpose: Approximately 285 linear feet of streambank were stabilized along Salt Creek (ILGL09) through a combination of A-Jacks structures and dormant cuttings of native willows and dogwoods. Project Location:

Cook County

Subgrantee: Village of Palatine Department of Public Works 148 West Illinois Street Palatine, Illinois 60067 Project Reports and Other Informational Materials: “Salt Creek Streambank Stabilization Project Final Report.” June 1994. Village of Palatine.

31

BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 285

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 42 36 72

93-13(319)SR

Title: Paris Restoration/Protection 314/319 Project Purpose: This project demonstrated a holistic approach to in-lake and watershed treatment to enhance the water quality and recreational uses of Paris Twin Lakes (ILRBL, ILRBX) through coordination of the Section 319 Nonpoint Source Management Program and the Section 314 Clean Lakes Program. Section 319 funds were utilized to implement practices such as shoreline stabilization and sediment retention basin construction. Project Location:

Edgar County

Subgrantee: City of Paris 123 South Central Avenue Paris, Illinois 61944 BMP Implementation Summary: BMP Code 350 580

BMP Name Sediment Basin Streambank/Shoreline Protection

Amount 1 (no.) 2,400 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? 80 67 134

93-14(314)JC

Title: Nonpoint Source Pollution Concert/Celebration Purpose: The John G. Shedd Aquarium, in cooperation with the Illinois EPA, developed a program for a Wetland Wonders and Pollution Prevention Festival held at the Shedd Aquarium on six consecutive days in May, 1996. The Festival accompanied the opening of the Shedd’s 1996 special exhibit, “Frogs: Wonders of the Wetlands.” The program was designed to enhance the public’s understanding of nonpoint source pollution and the importance of wetlands, lakes, and streams. The Festival included information and activities that explained the causes of NPS pollution, its impact on water quality, and what can be done to protect aquatic resources. The program included music, theater, storytelling, games, and similar events designed to educate as well as entertain. Project Location:

Cook County

32

Subgrantee: John G. Shedd Aquarium 1200 South Lake Shore Drive Chicago, Illinois 60605 93-16(319)SR

Title: Chicagoland Environmental Network Purpose: The Chicagoland Environmental Network facilitated the exchange of information and resources concerning nonpoint source pollution, water quality, and related environmental issues. The public was provided access to information and volunteer opportunities through a computer database of environmental organizations and agencies involved in habitat restoration, wetlands, prairies, watershed projects, urban gardening, revitalization programs, energy conservation, and recycling. Project Location:

Cook County

Subgrantee: Chicago Zoological Society 3300 South Golf Road Brookfield, Illinois 60513 93-17(319)SR

FFY 1994 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Englewood Environmental Protection Lot Reclamation Project Purpose: This project demonstrated the benefits of water quality education and land restoration in an urban environment by reclaiming eight inner-city lots, implementing a storm drain stenciling program, and disseminating nonpoint source education materials. The reclamation of these lots reduced the amount of pollutants entering the water system, while simultaneously aiding in the revitalization of the Englewood community. Local youth were employed to implement the reclamation and to design and develop community gardens on the formerly abandoned lots. Project Location:

Cook County

Subgrantee: University of Illinois - Cooperative Extension Service 549 Bevier Hall, 905 S. Goodwin Avenue Urbana, Illinois 61801 Project Reports and Other Informational Materials: “A Project with SOUL.” (11.25 min. videotape) University of Illinois – Cooperative Extension Service.

33

BMP Implementation Summary: BMP Code 562

BMP Name Recreation Area Improvement

Amount 1.6 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

94-1(319)SR

Title: Skokie Lagoons Shoreline Stabilization Project Purpose: This project implemented shoreline restoration aimed at vegetative stabilization along approximately 2.5 miles of shoreline. The restoration focused on areas where the most erosion has occurred because these are the most significant targets for addressing nonpoint source pollutants. Treatment of the shoreline extended beyond the water’s edge and into the floodplain for a distance of approximately 200 feet. Where feasible, the vegetative cover was extended into the water for further stabilization. Restoration measures used included coir fascines, gravel access points, coir mattresses, dead brush layers, sand and gravel stabilizer, live brush mattresses, rock toes, temporary wood stakes, and coir webbing. Project Location:

Cook County

Subgrantee: Forest Preserve District of Cook County 536 North Harlem Avenue River Forest, Illinois 60305 Project Reports and Other Informational Materials: “Skokie Lagoons Shoreline Stabilization Project – Final Report.” October 1, 1997. Forest Preserve District of Cook County. BMP Implementation Summary: BMP Code 580

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 10,660 ft. 294 250 499

BMP Name Streambank/Shoreline Protection

94-2(319)ST

Title: Senachwine Creek Nonpoint Source Control Project Purpose: This project improved water quality through the treatment of uplands and floodplains in the Senachwine Creek watershed, and through the implementation of a watershed educational/training program. Cost-share assistance was provided to watershed landowners to implement a variety of upland and floodplain best management practices (BMPs). Upland BMPs included 46,725 feet of terraces, 24.2 acres of waterways, 9 sediment basins, and three grade stabilization structures. Floodplain BMPs included eight ponds and six streambank stabilization projects which addressed 3,900 linear feet.

34

Project Location:

Peoria County

Subgrantee: Illinois River Soil Conservation Task Force 2412 West Nebraska Avenue Peoria, Illinois 61604 Project Reports and Other Informational Materials: “Senachwine Creek Nonpoint Source Control Project – Final Report.” December 1997. Illinois River Soil Conservation Task Force. BMP Implementation Summary: BMP Code 600 412 350 410 378 580

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 46,725 ft. 5,007 ? ? 24.2 ac. 1,689 ? ? 9 (no.) 1,882 ? ? 3 (no.) 265 ? ? 8 (no.) 1,564 ? ? 3,900 2,400 2,100 4,350

BMP Name Terrace Grassed Waterway Sediment Basin Grade Stabilization Structure Pond Streambank/Shoreline Stabilization

94-3(319)ME

Title: Mauvaise Terre Creek Project Purpose: The project informed and educated the public, specifically at-risk youth, about nonpoint source pollution, how it is impairing Mauvaise Terre Creek, and what can be done to prevent this pollution. The youth involved in this project removed debris from the creek that is affecting flow and water quality and document the stretches of the creek that are experiencing streambank erosion for future restoration. An environmental education curriculum was developed for the students and the students made presentations on the project. The youth also worked with the Illinois Rivers Project through Jacksonville High School to benefit from water quality education and to assist in providing data for the Illinois Rivers Project. Project Location:

Morgan County

Subgrantee: Youth Attention Center 527 South Main Street Jacksonville, Illinois 62650 BMP Implementation Summary: BMP Code 326

BMP Name Clearing & Snagging

Amount 400 ft.

94-4(319)CT

35

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 3 3 6

Title: Perry County Demonstration/Education Plots Purpose: This project provided information and technology transfer regarding conservation tillage methods and their effects on water quality. This was accomplished by developing field demonstration plots from which surface and ground water samples were analyzed to determine various best management practices’ effectiveness in reducing nonpoint source pollution to protect water quality in the Blacksop Creek (ILNEB01) watershed. Project Location:

Perry County

Subgrantee: Perry County Soil & Water Conservation Districts Post Office Box 146 Pinckneyville, Illinois 62274 94-5(319)ST

Title: Macoupin County Public Water Supply Watershed Protection/Education Project Purpose: This project addressed specific water quality issues, primarily siltation and atrazine as nonpoint source pollutants in public water supply lakes. This was done by building 18 water and sediment control basins and three wetlands in three different watersheds; establishing comparison plots of different types of vegetation in those basins; comparing the results; and using the summary of findings to educate the public about watershed management. Project Location:

Macoupin County

Subgrantee: Macoupin County Soil & Water Conservation District 300 Carlinville Plaza Carlinville, Illinois 62626 BMP Implementation Summary: BMP Code 638 657

BMP Name Water & Sediment Control Structure Wetland Restoration

Amount 18 (no.) 5.3 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 3,906 ? ? ? ? ?

94-6(319)JC

Title: City of Lockport Abandoned Well Sealing Project Purpose: Service at the city of Lockport’s public water supply well no. 3 was discontinued in 1970 due to lack of production and high sulfur content. However, the abandoned well was not properly sealed, making it a point where potential contamination could enter the aquifer. The city of Lockport had the well properly sealed.

36

Project Location:

Will County

Subgrantee: City of Lockport 222 East Ninth Street, Suite 4 Lockport, Illinois 60441-3497 BMP Implementation Summary: BMP Code 005

BMP Name Well Sealing

Amount 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

94-8(319)JC

Title: Southern Illinois No-Till Rental & Demonstration Project (Johnson Co.) Purpose: This project allowed the rental of no-till equipment to farmers in Johnson County at a reduced cost per acre charge. Because the economic conditions experienced in the agricultural communities in this part of the state, and the average farm size in the county being significantly less than the state average, many farmers need hands-on experience before they will be convinced to purchase the expensive equipment on their own. This project also demonstrated to the farmer ways of managing no-till so equal or better results compared to conventional tillage can be attained. Project Location:

Johnson County

Subgrantee: Johnson County Soil & Water Conservation District 209 North 4th Vienna, Illinois 62995 BMP Implementation Summary: BMP Code 329

BMP Name Conservation Tillage

Amount 2,784

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 23,633.9 ? ?

94-9(319)JC

Title: Larkdale Lagoons Shoreline Stabilization Project Purpose: Local government staff was trained in the placement of vegetative shoreline stabilization in the Larkdale Lagoons and a connecting ditch to improve water quality performance. Approximately 700 feet of lagoon shoreline and the 700 feet of connecting ditch were planted in wetland vegetation to reduce erosion and improve nutrient removal. The water quality performance of Larkdale Lagoons was enhanced by significantly reducing shoreline and channel erosion and by adding

37

wetland vegetation, which will substantially increase suspended and soluble pollutant removal. Project Location:

Lake County

Subgrantee: Village of Wauconda 101 North main Street Wauconda, Illinois 60084-0785 Project Reports and Other Informational Materials: “Shoreline Stabilization with Native Vegetation Training Course.” September 1995. Hey and Associates. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 1,400 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 9 8 16

94-10(319)ME

Title: Milne Creek Streambank Stabilization Project Purpose: This project stabilized 1,125 feet of streambanks along Milne Creek using bioengineering techniques (vegetation, coconut roll, and A-Jack structures). Project Location:

Will County

Subgrantee: City of Lockport 222 East Ninth Street, Suite 4 Lockport, Illinois 60441-3497 BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 1,125

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 99 84 169

94-11(319)JC

Title: Grass Lake Nonpoint Source Pollution Control Project Purpose: This project determined and implemented cost-effective programs to reduce nonpoint source pollution in northern Grass Lake (ILRTQ) due to boat traffic and other recreational uses. Both structural and non-structural methods were implemented and evaluated, including barrier methods to restrict the movement of resuspended sediment, creation of wind breaks, water use regulation (i.e., no-wake zones and no-motor areas), and redirection of traffic routes to deeper locations.

38

Education of boaters of the impact of their activities on resuspension of sediments and of proposed management methods was also an important part of this project. Project Location:

Counties of Lake and McHenry

Subgrantee: Chain-O-Lakes Fox River Waterway Management Agency 64 East Grand, Post Office Box 541 Fox Lake, Illinois 60020 94-12(319)SR

Title: DeKalb County Streambank and No-Till Program Purpose: This project protected Lake Holiday from sedimentation and other sources of nonpoint source pollution attributed to agricultural runoff. This was accompanied by increasing the number of acres in the watershed that are farmed by no-till. A no-till drill was supplied to farmers at a $4 per acre charge to encourage the practice and was used on 650 acres. Rip rap was installed to stabilize 300 feet of streambank on Samonauk Creek (ILDTB01). Project Location:

DeKalb County

Subgrantee: DeKalb County Soil & Water Conservation District 315 North Sixth Street Dekalb, Illinois 60115 Project Reports and Other Informational Materials: “Samonauk Creek 319 Grant - Final Report.” 1997. Dekalb County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 329 580

BMP Name Conservation Tillage Streambank/Shoreline Protection

Amount 650 ac. 300 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 5,500 ? ? 50 42 84

94-13(319)CD

Title: Norton Creek Urban Stream Maintenance/Restoration Program Purpose: Norton Creek became degraded due to changes in watershed hydrology, channel modifications, incursion of non-native woody vegetation, and lack of maintenance. Periodic failure of septic systems were reported due to debris blockages, which back up waters, further degrading water quality. To reduce debris related backups and streambank erosion, and to improve habitat and pollutant filtering mechanisms in Norton Creek, stream maintenance and restoration activities were implemented. These activities included the removal and disposal of nuisance vegetation adjacent

39

to the stream such as overhanging trees, limbs, and shrubs, as well as other debris. These techniques were applied to approximately 7,000 feet of stream. Project Location:

Kane County

Subgrantee: Village of Wayne 5N430 Railroad Street Post Office Box 532 Wayne, Illinois 60184 Project Reports and Other Informational Materials: “Final Report – Norton Creek Urban Stream Maintenance/Restoration Plan.” May 23, 1996. Christopher B. Burke Engineering, LTD. BMP Implementation Summary: BMP Code 326

BMP Name Clearing & Snagging

Amount 7,000 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

94-14(319)ME

Title: Greenleaf Creek Streambank Stabilization Project Purpose: This project demonstrated the ability to stabilize streambanks within an urbanized watershed by implementing an aggressive vegetation management program to remove undesirable non-native plant species on 1,100 feet of streambank, reintroduce native wetland/streamside species on 1,100 feet of streambank, and stabilization of 600 feet of streambank with A-Jacks. An educational opportunity to adjacent property owners was also provided. Project Location:

Lake County

Subgrantee: City of Park City 3420 Kehm Boulevard Park City, Illinois 60085 Project Reports and Other Informational Materials: “Greenleaf Creek Streambank Stabilization Project.” (videotape) 1996. RSK Consultants, Inc. “Greenleaf Creek Streambank Stabilization Project.” 1996. RSK Consultants, Inc. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 1,700 ft.

40

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 22 19 38

94-15(319)ME

Title: Ninemile Creek Watershed Sinkhole Stabilization Project Purpose: This project demonstrated and provided information/education to residents and landowners in the Ninemile Creek watershed as to cost-effective practices and methods to improve water quality. Ten (10) sinkholes were stabilized with appropriate land treatment practices applied to the surrounding land. Project Location:

Randolph County

Subgrantee: Randolph County Soil & Water Conservation District 313 West Belmont Sparta, Illinois 62286 BMP Implementation Summary: BMP Code 008

BMP Name Sinkhole Stabilization

Amount 10 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

94-17(319)ME

Title: Ground Water Pollution Prevention Project Purpose: This project included nonpoint source pollution prevention education for both the urban and rural communities including three field days and/or training workshops for landowners, well sealing contractors, public officials, Soil Conservation Service, Cooperative Extension Service, and soil and water conservation district (SWCD) personnel. The field days and workshops demonstrated the correct procedures to seal abandoned wells and promoted a variety of best management practices (BMPs) such as setback zones and pesticide and nutrient management practices to be implemented by landowners, business, and municipalities, etc. for the protection of ground water. County and municipal officials within Iroquois County were contacted concerning ground water protection and assistance was provided to those who plan to implement pollution prevention practices. Program information was also provided to surrounding SWCDs and other similar organizations. In addition to the educational portion, a cost-share program was administered so that a total of 58 abandoned wells were properly sealed. Project Location:

Iroquois County

Subgrantee: Iroquois County Soil & Water Conservation District 205 West Oak Street Watseka, Illinois 60970

41

BMP Implementation Summary: BMP Code 005

BMP Name Well Sealing

Amount 58 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

94-18(319)CD

Title: National Monitoring Strategy on Lake Pittsfield Purpose: This project will continue the identification of sources of sediment and the efficiency of sedimentation control practices on the tributary watershed of Lake Pittsfield. This project was previously funded under Section 319 in federal fiscal years 1992 and 1993. The project is a cooperative Section 319/314 effort for lake restoration and water quality improvement. Project Location:

Pike County

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 94-19(319)ST

Title: Waukegan River National Monitoring Strategy Purpose: This project utilized the national monitoring program to demonstrate the effectiveness of biotechnical stream stabilization techniques implemented on the Waukegan River. The urban fisheries and stream habitat were surveyed before implementation of biotechnical stream stabilization. Under the national monitoring program, stream fishery and instream habitat were surveyed to provide post implementation data. The monitoring strategy included macroinvertebrate sampling, physical habitat monitoring, and fisheries monitoring during the spring, summer, and fall cycles of the project period. All monitoring and associated data were entered into USEPA’s Nonpoint Source Management System (NPSMS) and STORET system. A color brochure was developed which described 1) the biotechnical stream stabilization techniques implemented on the Waukegan River, 2) the monitoring program, and 3) the physical and biological enhancements achieved on the Waukegan River. A report was prepared summarizing the monitoring data and the findings related to the effectiveness of implemented biotechnical stream stabilization techniques, including but not limited to improvements in habitat and bank stabilization. Project Location:

Lake County

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697

42

94-20(319)ST

Title: Stream Restoration Manual Purpose: A manual was developed which provides detailed instructions on the application of stream restoration techniques (both biotechnical and streambed controls) in a watershed context. The instructional manual is divided into three sections: 1) introduction to geomorphic assessments of watersheds and stream geometry, 2) application of biotechnical techniques within a watershed context, and 3) application of streambed grade controls to enhance stable pool and riffle habitat. The instructional manual is supplemented with video footage of the described application and geomorphic setting. Project Location:

Statewide

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 Project Reports and Other Informational Materials: “Field Manual of Urban Stream Restoration.” June 1997. Illinois State Water Survey 94-21(319)CT

Title: National Monitoring Conference Purpose: This project brought together a variety of entities involved in the assessment of water quality in the United States and Canada. The conference focused on those groups and individuals with an interest in national monitoring projects and those with the knowledge of water quality assessment in order to create a unified, organized effort to accomplish water quality improvement. The conference also highlighted the use of national monitoring criteria to provide comparable results and to improve the opportunity for water quality data comparisons between states. Project Location:

Statewide

94-22(319)CT

Title: Nonpoint Source Pollution Awareness Through Advertisements Purpose: This project heightened the awareness of urban nonpoint source pollution (specifically stormwater runoff) through pollution prevention advertisements (messages, graphics, and photographs) on billboards in Springfield, Illinois. The advertisements will addressed the different types of pollutants associated with

43

urban runoff and highlighted the concept of pollution prevention through watershed management. One billboard design was featured in Springfield from July through August, 1996. A second new design was used from September through October, 1996. Project Location:

Sangamon County

Subgrantee: Not Applicable 94-24(319)CT

Title: GIS Technology Support for the Targeted Watershed Approach Purpose: This project created the coverages and programs necessary for conducting the Targeted Watershed Approach (TWA) in a geographic information system (GIS) environment and trained Illinois EPA staff in GIS techniques and applications. The TWA is a method of prioritizing Illinois EPA’s Bureau of Water program activities within targeted watersheds where the greatest environmental benefit can be realized. The Support Technology for Environmental Water & Agricultural Resource Decisions (STEWARD) and Agricultural Nonpoint Source Pollution (AGNPS) model were applied on the Lake Pittsfield watershed to 1) identify recommended best management practices (BMPs) that should be applied; 2) quantify pollutants loads under conditions before and after implementation of Section 319 BMPs; 3) evaluate the effectiveness of applied BMPs; and 4) determine the functional value of the models for these purposes. Project Location:

Statewide

Subgrantee: Illinois State Water Survey 2204 Griffith Drive Champaign, Illinois 61820-7495 Project Reports and Other Informational Materials: “GIS Technology Support for the Targeted Watershed Approach.” June 1996. Illinois State Water Survey and Illinois Environmental Protection Agency. “Investigation of the STEWARD Expert System for the lake Pittsfield Watershed.” December 1998. Illinois State Water Survey. “Modeling the Lake Pittsfield Watershed Using the AGNPS-ARC/INFO Model.” December 1998. Illinois State Water Survey. 94-25(319)SR

Title: Southern Illinois No-Till Rental and Demonstration Project (Union Co.)

44

Purpose: This project allowed the rental of no-till equipment to farmers in Union County at a reduced cost per acre charge. Because the economic conditions experienced in the agricultural communities in this part of the state, and the average farm size in the county being significantly less than the state average, many farmers need hands-on experience before they will be convinced to purchase the expensive equipment on their own. This project also demonstrated to the farmer ways of managing no-till so equal or better results compared to conventional tillage can be attained. Project Location:

Union County

Subgrantee: Union County Soil & Water Conservation District R.R. #2, Box 305C Anna, Illinois 62906 BMP Implementation Summary: BMP Code 329

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 5,038.5 ac. 49,512.9 ? ?

BMP Name Conservation Tillage

94-26(319)JC

Title: NPS Information and Education Conference Purpose: The Illinois EPA held a conference during the fall of 1996 focused on the techniques utilized to inform and educate the public about nonpoint source pollution prevention. Federal, state, local, and volunteer groups discussed their efforts and students participating in environmental programs made presentations on their efforts. A site visit was made to the Brookfield Zoo and an optional trip to the Shedd Aquarium (two information/education projects funded in part by Section 319). Project Location:

Cook County

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 94-29(319)CT

Title: Joliet Arsenal Riparian Restoration Project Purpose: This project provided geographic information system data, maps, and model analysis for the creation and restoration of wetlands and protection of the wetland systems within the Joliet Arsenal.

45

Project Location:

Will County

Subgrantee: Illinois Department of Natural Resources 524 South Second Springfield, Illinois 62701-1787 94-30(319)ST

Title: Biotic Assessment of Watershed Management Practices Methodology Purpose: The Illinois EPA will assess and revise current Index of biotic Integrity (IBI) metrics, including incorporation of alternative measures of stream size. Revision of the effort metric shall be assessed, including modifications to account for low fish abundance. After revision of the effort metric, an IBI user manual will be developed. Recommendations and protocols regarding use of the IBI as a watershed assessment tool will also be developed. Finally, various regionalization schemes for fisheries communities will be verified and recommended. Project Location:

Statewide

Subgrantee: Center for Aquatic Ecology Illinois Natural History Survey 607 E. Peabody Drive Champaign, Illinois 61820 94-31(319)GG

Title: Blue Creek Stream Restoration Project Purpose: Blue Creek, a tributary of Lake Pittsfield (ILRDP), was experiencing streambed incision and mass wasting of oversteepened banks, producing for increased sediment yield. Along the stream channel, large ravines had eroded around concrete drop structures and were downcutting upstream through grassed waterways into row crop fields, further increasing sediment yield. To address these problems, the stream channel was stabilized with 12 low rock wiers, which were spaced as natural riffles along 1,500 feet of stream. Two of the weirs were constructed to serve as low water stream crossings for farm equipment. Eroding banks were stabilized with vegetation. In some weir locations, riprap was extended downstream to protect the streambed and bank on meander bends from the high energy flows generated on the weir backslope. Two ravine erosion sites were stabilized with riprap, soils, and grasses where runoff had eroded soils from concrete drop structures. Project Location:

Pike County

46

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 Project Reports and Other Informational Materials: “Blue Creek Restoration – Riffle/Weir Construction.” 1998. Illinois State Water Survey. BMP Implementation Summary: BMP Code 584

BMP Name Stream Channel Stabilization

Amount 1,500 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 99 84 168

94-32(319)ST

Title: Macoupin County Public Water Supply Watershed Project Purpose: This project addressed water quality problems, primarily siltation and atrazine, of two public water supply lakes. Thirteen (13) water and sediment control basins were constructed in the Otter Lake (ILRDF) watershed. Project Location:

Macoupin County

Subgrantee: Macoupin County Soil & Water Conservation District 300 Carlinville Plaza Carlinville, Illinois 62626 Project Reports and Other Informational Materials: “Macoupin County PWS Watershed Project – Final Report.” August 25, 1999. Macoupin County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 638

BMP Name Water & Sediment Control Basin

Amount 13 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 442 ? ?

94-34(319)JC

Title: The North Branch Chicago River Project – 2 Purpose: With funding under Section 319 in federal fiscal year 1996, the Friends of the Chicago River and its project partners developed a model urban watershed protection handbook that will assist urban resource managers and interested parties throughout the midwest in the protection, restoration, and maintenance of similar watersheds. The handbook was developed and field tested as part of the

47

development of an actual watershed strategy and implementation effort for the North Branch of the Chicago River (ILHCC08). With supplemental funding under the FFY94 Section 319 grant, the friends of the Chicago River implemented additional best management practices to demonstrate techniques for the protection and restoration of water quality in the North Branch of the Chicago River. Funding was also used to print additional copies of the model urban watershed protection handbook. Project Location:

Counties of Lake & Cook

Subgrantee: Friends of the Chicago River 407 S. Dearborn Street, Suite 1580 Chicago, Illinois 60605 Project Reports and Other Informational Materials: “Voices of the Watershed – A Guide to Urban Watershed Management Planning.” 1999. Friends of the Chicago River. “North Branch Chicago River Project – Final Report.” June 13, 2000 Friends of the Chicago River. 94-35(319)CD

Title: Salt Creek Streambank Stabilization Project Purpose: This project reduced erosion and nonpoint source pollution through the stabilization of eroding streambanks along an approximately 2,735 foot segment of Salt Creek (ILGL09) located in Wood Dale, Illinois. Bioengineering techniques (i.e., geogrid, lunkers, A-jacks, fiber rolls, minor stream regrading, vegetation) were used. An educational stand was also installed at the site to explain the streambank stabilization practices and the importance of nonpoint source pollution control. Project Location:

DuPage County

Subgrantee: City of Wood Dale 404 North Wood Dale Road Wood Dale, Illinois 60191 Project Reports and Other Informational Materials: “Salt Creek Streambank Stabilization Project – Final Report.” August 2000. City of Wood Dale. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 2,735 ft.

48

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 127 109 216

94-36(319)SR

Title: Nonpoint Source Pollution Book for Grades 3 through 5 Purpose: This project developed a “Magic School Bus” style book on nonpoint source pollution. The intended audience is youth in the 3 rd through 5th grades. A teachers guide was also developed. Project Location:

Statewide

Subgrantee: The University of Illinois 801 South Wright Street Champaign, Illinois 61820 Project Reports and Other Informational Materials: “Secret Agent Worms In … The Disappearing Earth.” December 2000. University of Illinois Extension. “Mission Possible – A Teacher’s Guide for the Disappearing Earth.” University of Illinois Extension.

December 2000.

94-37(319)BL

FFY 1995 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Mackinaw River Project Purpose: This project assisted rural land and water managers in Illinois’ Mackinaw River (ILDK13) eco-shed in protecting and restoring aquatic and riparian life. The project demonstrates the viability of cooperative efforts to implement land and water management practices that are ecologically, economically, and socially compatible. The project implemented a replicable process for examining, prioritizing, and correcting water quality impairments resulting from changes in land use and hydrology, and increased nonpoint source pollution. The project illustrated innovative solutions to economic and social constraints to the adoption of best management practices. The project established a process for involving and empowering key stakeholders in eco-shed management. Project Location:

Counties of Mason, Tazewell, Woodford, Ford, McLean, and Livingston

Subgrantee: The Nature Conservancy, Central Illinois Field Office 416 Main Street, Suite 1112 Peoria, Illinois 61602

49

Project Reports and Other Informational Materials: “Building Partnerships Over Land & Water – The Mackinaw River Project.” (videotape, 24 min.) 1998. The Nature Conservancy. “Ensuring Citizens Have a Voice … a Guide to Watershed Management Planning.” 1998. The Nature Conservancy. “Mackinaw River Watershed Management Plan.” June 1998. The Nature Conservancy. BMP Implementation Summary: BMP Code 657 350 580 556 410 612 614 512 510 644 666 314 870 472 342

BMP Name Wetland Restoration Sediment Basin Streambank/Shoreline Protection Planned Grazing System Grade Stabilization Structure Tree Planting Trough or Tank Pasture & Hayland Planting Pasture & Hayland Management Wildlife Wetland Habitat Management Woodland Improvement Brush Management Level Spreader Livestock Exclusion Critical Area Planting

Amount 59 ac. 5 (no.) 9,240 ft. 40 ac. 3 (no.) 12 ac. 1 (no.) 14 ac. 416 ac. 4 ac. 242 ac. 6 ac. 3 ac. 10 ac. 3 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? ? ? ? 203 172 346 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?

95-1(319)CD

Title: Lake Forest Wetland Demonstration Project Purpose: This project recreated a 25 acre wetland by restoring the natural hydrology and vegetative cover of the project site, primarily floodplain. Drainage tiles and minor water control structures were disabled to allow for the creation of a wetlands complex which intercepts runoff and benefits water quality. The project diverted stormwater runoff from the upstream sources into a wetlands system where it receives secondary biological treatment prior to discharge into the Middle Fork of the North Branch of the Chicago River (ILHCCC04). The project also involved the implementation of a public education program. Project Location:

Lake County

Subgrantee: Lake County Forest Preserve District 2000 Milwaukee Avenue Libertyville, Illinois 60048

50

Project Reports and Other Informational Materials: “Lake Forest Wetlands Demonstration Project.” Preserve District.

January 31, 1997.

Lake County Forest

BMP Implementation Summary: BMP Code 657

BMP Name Wetland Restoration

Amount 25 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

95-2(319)ME

Title: Urban Erosion Control Project Purpose: This project was implemented in an agricultural area undergoing phased urban development in the Lake Springfield watershed. The project demonstrated the effectiveness of nonpoint source pollution control practices implemented and maintained during the construction of utilities and houses. Control sites were used for comparison purposes. The effectiveness of pollution control techniques were documented through videotape and a computer simulation model of runoff from the project sites. Project results were used for preparing a draft construction erosion control ordinance in Sangamon County and for strengthening an existing city of Springfield Land Subdivision Ordinance. Project Location:

Sangamon County

Subgrantee: Sangamon County Soil & Water Conservation District 40 Adloff Lane, Suite 4 Springfield, Illinois 62703 Project Reports and Other Informational Materials: “Urban Development Erosion Control Demonstration Project for Lake Springfield Watershed – Final Report.” October 1997. Sangamon County Soil & Water Conservation District. 95-3(319)JC

Title: Chick Evans Golf Course Stream Protection Project Purpose: This project created a filter strip along the North Branch of the Chicago River (ILHCC08) in the Chick Evans Golf Course to reduce nonpoint source pollution such as sediment, fertilizers, and other chemicals through the establishment of land treatment measures that improved aesthetic conditions, enhanced environmental quality, and inhibit flood damage. A-jacks, lunkers, and vegetation were established along the river to stabilize 827 feet of streambanks and reduce the amount of sediment released into the water and filter runoff from the golf course.

51

Project Location:

Cook County

Subgrantee: Forest Preserve District of Cook County 536 North Harlem Avenue River Forest, Illinois 60305 Project Reports and Other Informational Materials: “Chick Evans Golf Course Stream Protection Project – Final Report.” September 1997. Forest Preserve District of Cook County. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Stabilization

Amount 827 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 34 29 58

95-4(319)SR

Title: Illinois Farm-A-Syst Purpose: This project was Phase 2 of the Farm-A-Syst program established by the Illinois Department of Agriculture. Phase 2 further developed and enhanced the efforts and developments of Phase 1 of this effort by providing additional training, the development of Illinois Farm-A-Syst Plus, the development of Illinois Home-A-Syst, and by providing the availability of water sampling. Phase 2 was the next step in the development of a Farm-A-Syst program which was comprehensive and provided universal statewide coverage. Project Location:

Statewide

Subgrantee: Illinois Department of Agriculture Division of Natural Resources State Fairgrounds, P.O. Box 19281 Springfield, Illinois 62794-9281 95-5(319)JC

Title: 60 Ways Farmers Can Protect Surface Water Purpose: A guidebook entitled 60 Ways Farmers Can Protect Surface Water was developed, published, and distributed. The book contains information on techniques to control soil erosion and livestock waste, methods for reducing chemical use, and application of best management practices that prevent surface water contamination. Project Location:

Statewide

52

Subgrantee: University of Illinois - Cooperative Extension Service 65 Mumford Hall, 1301 N. Gregory Drive Urbana, Illinois 61801 Project Reports and Other Informational Materials: “60 Ways Farmers Can Protect Surface Water.” Cooperative Extension Service.

August 1997.

University of Illinois -

95-7(319)CT

Title: Phase 1 Implementation of the Flint Creek Watershed Management Plan Purpose: This project initiated the implementation of a comprehensive nonpoint source pollution control strategy developed with Clean Water Act Section 104(b)(3) funding. Recommendations of the Flint Creek (ILDTZS01) watershed management plan were executed through the coordinated implementation of best management practices for urban runoff and stream and watershed management. The overall project included streambank (6,656 feet) and lake shoreline (250 feet) stabilization/restoration, the installation of sand filters, flow control structures, wetland restoration, public education, and implementation of the Lake County Watershed Development Ordinance in the Flint Creek watershed. Project Location:

Lake County

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Flint Creek Watershed Restoration Projects.” September 1997. Northeastern Illinois Planning Commission. BMP Implementation Summary: BMP Code 580 845 840 657

BMP Name Streambank/Shoreline Protection Infiltration Trench Grassed Lined Channel Wetland Restoration

Amount 6,906 2 (no.) 0.33 ac. 0.63 ac.

95-8(319)SR

Title: National Monitoring Strategy on Lake Pittsfield

53

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 128 108 217 ? ? ? ? 1 3 ? ? ?

Purpose: This project continued the identification of sources of sediment and the efficiency of sediment control practices on the tributary watershed of Lake Pittsfield. This project was previously funded under Section 319 in federal fiscal years 1992, 1993, and 1994. The project is a cooperative Section 319/314 effort for lake restoration and water quality improvement. Project Location:

Pike County

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 Project Reports and Other Informational Materials: “Effects of Land Management on Lake Pittsfield Sedimentation and Water Quality - National Watershed Monitoring Project.” November 15, 1996. Illinois State Water Survey. 95-9(319)ST

Title: Waukegan River National Monitoring Strategy (Phase 2) Purpose: This project continued the utilization of the national monitoring program initiated under Section 319 in federal fiscal year 1994 to demonstrate the effectiveness of biotechnical stream stabilization techniques implemented on the Waukegan River. Project Location:

Lake County

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 Project Reports and Other Informational Materials: “Waukegan River National Monitoring Program – Biological and Physical Monitoring of Waukegan River Restoration Efforts in Biotechnical Bank Protection and Pool/Riffle Creation.” May 1997. Illinois State Water Survey. 95-10(319)ST

Title: Southwestern Illinois Karst Project Purpose: This project was located within Illinois EPA’s Southern Illinois Ground Water Protection Region. The three counties involved have more than 220,800 acres of karst topography. The project educated residents in the karst areas about how their activities affect the quality of the ground water, what nonpoint source pollution is, and the best management practices needed to prevent it. In addition, technical

54

studies were conducted to produce up-to-date assessments on the ground water quality of the area, identify priority contaminants, and their pathways. Project Location:

Monroe County

Subgrantee: Monroe-Randolph Bi-County Health Department 901 Illinois Avenue, Suite A Waterloo, Illinois 62298 Project Reports and Other Informational Materials: Karst Land in Illinois.” (poster) 1997. Illinois State Geological Survey. “Southwestern Illinois Sinkhole Plain – Best Management Practices Manual.” Mississippi Karst Resource Planning Committee.

1997.

“Groundwater Quality & Contaminant Levels, Monroe County, Illinois.” 1997. Southern Illinois University. “Groundwater Tracing and Recharge Area Delineation Study for Two Karst Study Areas in Monroe County, Illinois.” January 29, 1998. Ozark Underground Laboratory. 95-11(319)CD

Title: Brookfield Zoo NPS Pollution Awareness Exhibit (Wetlands Conservation Exhibit) Purpose: A Wetlands Conservation Exhibit was designed and constructed to enhance the public’s understanding of the value and function of swamps, marshes, and other wetlands. The exhibit highlighted the importance of wetlands in improving water quality, supporting wildlife, and controlling floods. Impacts on water quality and wetlands, such as nonpoint source pollution, draining and filling, introduction of exotic species, and unsustainable use of natural resources are presented. The qualities indicative of a healthy wetland environment are displayed and described. The ways in which human activities impact wetland ecosystems, including nonpoint source pollution, are demonstrated in a variety of means throughout the exhibit. The actions zoo visitors can take to minimize negative impacts on wetlands are also displayed, such as minimizing the use of fertilizers and pesticides, helping to enforce existing wetland protection laws, keeping harmful materials out of storm sewers, and supporting wetlands protection and enhancement efforts. Project Location:

Cook County

Subgrantee: Chicago Zoological Society Brookfield Zoo 3300 Golf Road Brookfield, Illinois 60513

55

Project Reports and Other Informational Materials: “The Swamp: Wonders of Our Wetlands.” (video and narrated photo journal) March 1996. Chicago Zoological Society. 95-12(319)RM

Title: Shedd Aquarium NPS Pollution Awareness Exhibit (WaterWise) Purpose: The WaterWise exhibit was designed and constructed to explain the various forms of nonpoint source pollution, their impacts on the environment, methods for minimizing those impacts, and the importance of water quality protection. The information was presented in a fun and engaging manner to stimulate the public’s willingness to participate in the practical solutions to nonpoint source pollution highlighted by the exhibit. The exhibit was located in the John G. Shedd Aquarium’s main foyer during August 1995. Each Thursday evening in August 1995, the exhibit was part of a special “after hours” event. Illinois EPA employees and other volunteers staffed the exhibit, providing the public an opportunity to talk with water quality experts. After August, the exhibit was relocated to an alternate venue. WaterWise was coordinated with, and the funding used to enhance, the Nonpoint Source Pollution and Stream Ecology exhibit initiated with Federal fiscal year 1991 Section 319 funds. Project Location:

Cook County

Subgrantee: John G. Shedd Aquarium 1200 South Lake Shore Drive Chicago, Illinois 60605 95-13(319)SR

Title: Lincoln Memorial Garden NPS Pollution Control Education Project Purpose: Demonstrative best management practices (BMPs) for nonpoint source pollution control were implemented on Lincoln Memorial Garden property located within the Lake Springfield watershed. BMPs included upland watershed treatment, streambank stabilization, shoreline protection, critical area vegetative management (prairie grasses and forbes and trees), reforestation, and wetland restoration. The project also provided an excellent opportunity for “hand-on” application workshops for a variety of ages. In addition to the BMPs, a nonpoint source pollution control interpretive exhibit was located at the Nature Center on the Garden property and information/education materials were developed and distributed. Project Location:

Sangamon County

Subgrantee: Lincoln Memorial Garden 2301 East Lake Drive Springfield, Illinois 62707

56

Project Reports and Other Informational Materials: “Striving For Cleaner Water: A Self-Guided Trail Tour.” Brochure. 1999. Lincoln Memorial Garden. “Lincoln Memorial Garden Nonpoint Source Pollution Control Education Project – Final Report.” January 30, 1999. Lincoln Memorial Garden Nature Center. BMP Implementation Summary: BMP Code 657 356 410 584 580 393

BMP Name Wetland Restoration Dike Grade Stabilization Structure Stream Channel Stabilization Streambank/Shoreline Protection Filter Strip

Amount 3.0 ac. 100 ft. 3 (no.) 1,100 ft. 2,400 ft. ?

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? ? ? ? ? ? ? 72 61 124 170 144 291 ? ? ?

95-15(319)CD

Title: Chicagoland Environmental Network Purpose: The Chicagoland Environmental Network facilitated the exchange of information and resources concerning nonpoint source pollution, water quality, and other related environmental issues. The public was provided access to information and volunteer opportunities through a computer database of environmental organizations and agencies involved in habitat restoration, wetlands, prairies, watershed projects, urban gardening, revitalization programs, energy conservation, and recycling. The CEN also developed a long range plan identifying its 10 year mission and strategy, including future programs and functions, resource needs, goals and objectives, etc. Project Location:

Cook County

Subgrantee: Chicago Zoological Society 3300 South Golf Road Brookfield, Illinois 60513 95-16(319)SR

Title: Indian Lake Interpretation Purpose: Through a cooperative effort with the Chicago Zoological Society (Brookfield Zoo), the Illinois EPA created an interpretive program designed to educate visitors about the benefits of healthy lake ecosystems, the physical and biological characteristics of functioning lakes including the flora and fauna of such habitats in Illinois, the positive and negative impacts of people on lakes, and how visitors can help protect

57

lake water quality. This interpretive program is located around Indian Lake (ILWGZY) at the Brookfield Zoo. Project Location:

Cook County

Subgrantee: Chicago Zoological Society 3300 South Golf Road Brookfield, Illinois 60513 Project Reports and Other Informational Materials: “Salt Creek Wilderness, Indian Lake, Dragonfly Marsh – Final Report.” Brookfield Zoo.

August, 1999.

95-17(319)ST

Title: Know Your Watershed Program Purpose: The Illinois EPA assisted in the Conservation Technology Information Center’s efforts to host one statewide Watershed Partnership Workshop and three regional Watershed Facilitator Workshops in Illinois. The workshops were targeted to representatives from municipalities, state agencies, state level associations, commodity groups, private industry, non-governmental organizations, and other pertinent groups working with watershed management. The focus of the workshops was on what each organization can provide toward the management of watersheds in Illinois. Project Location:

Statewide

Subgrantee: Conservation Technology Information Center 1220 Potter Drive, Room 170 West Lafayette, Indiana 47906-1383 Project Reports and Other Informational Materials: “Bridge Builder – A Guide for Watershed Partnerships. Conservation Technology Information Center.

Facilitators Handbook.”

1998.

95-18(319)CD

Title: Illinois River Watershed Display Purpose: An Illinois River watershed display and brochure was designed to enhance the public’s awareness of the watershed, water quality of the watershed, nonpoint source pollution and its impact on the Illinois River watershed, efforts to improve water quality in the watershed, tips on how the public can prevent nonpoint source pollution in the watershed, and history of the Illinois River watershed. The display

58

will be placed on exhibition at various locations, including at the Clean Water Celebration in March 1999 at the Peoria Civic Center. Project Location:

Peoria County

Subgrantee: Powell Press Board of Managers 942 N. E. Glen Oak Peoria, Illinois 61603 Project Reports and Other Informational Materials: “Our River is a Reflection of Our Community.” Society.

(Brochure)

1999.

The Peoria Historical

95-19(319)SR

Title: National Urban Water Quality Retrofit Conference Purpose: Financial and technical assistance was provided by the Illinois EPA to help host the National Urban Water Quality Retrofit Conference. The conference highlighted innovative technologies and approaches for the improvement of water quality in urban areas. Project Location:

Cook County

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 95-20(319)SR

FFY 1996 FEDERALLY FUNDED SECTION 319 PROJECTS Title: NPS Control in a Priority Ground Water Protection Planning Region Purpose: The goal of this project was to reduce the leaching potential of certain pesticides within community water supplies (CWS) well recharge areas, given soil characteristics and implementation of selected agricultural best management practices (BMPs). The three CWSs chosen were Edwardsville, Roxana, and Troy all located in the Southern Groundwater Protection Planning Region. Landowners employed BMPs on 750 out of 1,000 acres within the recharge areas. Project Location:

Madison County

Subgrantee: Madison County Soil & Water Conservation District 7205 Marine Road, P.O. Box 482 Edwardsville, Illinois 62025

59

96-1(319)SR

Title: North Branch Chicago River Watershed Project Purpose: A model urban watershed protection handbook was developed to assist urban resource managers and interested parties throughout the Midwest in the protection, restoration, and maintenance of similar watersheds. The handbook was developed and field tested as part of the development of an actual watershed management plan and implementation effort for the North Branch of the Chicago River (ILHCC08). The project promoted partnerships that advocate and implement watershed planning and the implementation of best management practices. Project Location:

Cook County

Subgrantee: Friends of the Chicago River 407 S. Dearborn Street, Suite 1580 Chicago, Illinois 60605 Project Reports and Other Informational Materials: “Voices of the Watershed – A Guide to Urban Watershed Management Planning – Based on the Experiences of the North Branch Watershed Project.” 1999. Friends of the Chicago River. “North Branch Chicago River Project – Final Report.” Chicago River.

February 9, 2000.

Friends of the

BMP Implementation Summary: BMP Code 580 865 880 800

BMP Name Streambank/Shoreline Protection Land Grading Permanent Seeding Urban Stormwater Wetland

Amount 4,700 ft. 1.8 ac. 1.8 ac. 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 27.7 22 42 5.7 5 9 5.7 5 9 ? 11 45

96-2(319)CD

Title: Indian Lake Wetlands Educational Interpretation Project Purpose: The Illinois EPA expanded its nonpoint source pollution control information/education program through a cooperative effort with the Chicago Zoological Society (Brookfield Zoo). A wetland adjacent to the Zoo’s Indian Lake (ILWGZY) was designed to help visitors experience a functioning wetland system in northeastern Illinois. An educational interpretive program was developed for the wetland to highlight both the positive and negative impacts people can have on the environment, with an emphasis on helping visitors learn about ways they can help the environment. A boardwalk was constructed through the wetland for visitors to safely travel through the wetland without disrupting the natural functions. Visitors have the opportunity to perform hands-on tests to see how the wetland improves

60

water quality. Signage and interactive devices along the boardwalk help visitors understand the importance of clean water. A self-guided trail tells the wetland story without detracting from the surrounding natural scene. Project Location:

Cook County

Subgrantee: Chicago Zoological Society 3300 South Golf Road Brookfield, Illinois 60513 Project Reports and Other Informational Materials: “Salt Creek Wilderness, Indian Lake, Dragonfly Marsh – Final Report.” Brookfield Zoo.

August, 1999.

BMP Implementation Summary: BMP Code 657

BMP Name Wetland Restoration

Amount 1.5 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

96-3(319)ST

Title: Expansion of the Water Works Lab Purpose: A Water Lab exhibit was constructed at the Chicago Academy of Sciences’ new Nature Museum to present key concepts of water related sciences to help people examine, understand, and affect environmental issues. The Water Lab is a “handson/minds-on” exhibit and a working laboratory/classroom. A large model of the Chicago River provides explanations of how the river works, and what kinds of plants and animals live in this environment. The model explains the concept of watersheds and that what we do on the land impacts the quality of our water. The history of how the river has changed is described, as are the different types of uses and ecosystems of the river and Lake Michigan. Interactive devises teach visitors about urban nonpoint source pollution and how such pollution can be reduced. The loss, function, and benefits of wetlands are explained. The exhibit includes aquarium tanks stocked with aquatic animals, including species both exotic and native to the Chicago River. A separate stream table allows visitors to make their own river and learn first hand how water shapes the land while exploring issues related to erosion and stream hydrology. A water quality testing lab allows visitors to analyze random water samples and make water management decisions based on the test results. Visitors can test for pH, chloride, and dissolved oxygen. Interactive computer stations allow visitors to explore various software and databases concerning water quality and related environmental issues. Project Location:

Cook County

Subgrantee: Chicago Academy of Sciences 2060 North Clark Street Chicago, Illinois 60614

61

96-4(319)SR

Title: National Monitoring Strategy on Lake Pittsfield Purpose: This project continued the identification of sources of sediment and the efficiency of sediment control practices on the tributary watershed of Lake Pittsfield (ILRDP). This project was previously funded under Section 319 in federal fiscal years 1992, 1993, 1994, and 1995. The project was a cooperative Section 319/314 effort for lake restoration and water quality improvement. Project Location:

Pike County

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 96-5(319)ST

Title: Waukegan River National Monitoring Strategy (Phase 3) Purpose: This project continued the utilization of the national monitoring program initiated under Section 319 in Federal fiscal year 1994 to demonstrate the effectiveness of biotechnical stream stabilization techniques implemented on the Waukegan River. Project Location:

Lake County

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 96-6(319)ST

Title: Northeastern Illinois Community Assistance Office Purpose: This project provided training to Natural Resource Conservation Service regional staff on water quality regulations and technical issues. Furthermore, the project encouraged the provision of nonpoint source pollution control related technical assistance to appropriate local agencies and organizations in northeastern Illinois. The Natural Resources Conservation Service’s Northeastern Illinois Community Assistance Office was established to serve the six county northeastern Illinois area. This office provided technical assistance to soil and water conservation districts, planning commissions, county departments, townships and municipalities in northeastern Illinois. In addition to direct technical assistance, the staff of this office provided information/education and training assistance. The major focus of the office was on erosion/sediment control, water quality, and natural resource management.

62

Project Location:

Counties of Lake, McHenry, Kane, DuPage, Cook, and Will

Subgrantee: USDA Natural Resource Conservation Service 1902 Fox Drive Champaign, Illinois 61820 96-7(319)ME

Title: National NPS Pollution Information/Education Conference Proceedings Purpose: This project printed the presentations from the National NPS Pollution Information/Education Conference and distributed the proceedings to registered participants at the conference. Project Location:

Cook County

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “A National Conference - Nonpoint Source Pollution Information/Education Programs.” March 1997. Northeastern Illinois Planning Commission. 96-9(319)CT

Title: Phase 2 Modeling on Lake Pittsfield Purpose: This project provided additional funding to implement the modeling component of the GIS Technology Support for the Targeted Watershed Approach project funded under Section 319 in FFY94. The Support Technology for Environmental Water & Agricultural Resource Decisions (STEWARD) and Agricultural Nonpoint Source Pollution (AGNPS) model were applied on a sub-watershed of the Lake Pittsfield (ILRDP) watershed. The purpose of the modeling was to 1) identify recommended best management practices (BMPs) that should be applied; 2) quantify pollutant loads under conditions before and after implementation of Section 319 BMPs; 3) evaluate the effectiveness of applied BMPs; and 4) determine the functional value of the models for these purposes. Project Location:

Pike County

Subgrantee: Illinois State Water Survey 2204 Griffith Drive Champaign, Illinois 61820-7495

63

Project Reports and Other Informational Materials: “Investigation of the STEWARD Expert System for the Lake Pittsfield Watershed.” December 1998. Illinois State Water Survey. “Modeling of the Lake Pittsfield Watershed Using the AGNPS-ARC/INFO Model.” December 1998. Illinois State Water Survey. 96-11(319)SR

Title: Nonpoint Source Pollution Awareness Exhibit Purpose: A new exhibit was designed, constructed, and placed on display at the Shedd Aquarium to enhance the public’s understanding of the value and function of water resources, nonpoint source pollution and its impact on water quality, and what can be done to protect Illinois’ water resources. The exhibit includes an aquarium stocked with live fish and plant species native to Illinois as well as graphics, copy, and interactive materials that present information on nonpoint source pollution and methods for reducing nonpoint source pollution. A music video for the song “Environment is Everything” was developed to illustrate the causes and sources of nonpoint source pollution, its impact on water quality, and the need to protect water resources. The music video was routinely played at the Shedd Aquarium for viewing by the public. Project Location:

Cook County

Subgrantee: John G. Shedd Aquarium 1200 South Lake Shore Drive Chicago, Illinois 60605 Project Reports and Other Informational Materials: “Environment is Everything.” (music video, 4.5 min.) 1997. John G. Shedd Aquarium. 96-10(319)SR

Title: Evaluation for the Children’s Zoo Purpose: The purpose of this project was to evaluate Brookfield Zoo visitors’ awareness of the environmental impact of agriculture. The evaluation will affect planning f or the expansion and renovation of the Children’s Zoo. Project Location:

Cook County

Subgrantee: Chicago Zoological Society Brookfield Zoo 3300 Golf Road Brookfield, Illinois 60513

64

96-12(319)CT

Title: Cache River Reforestation Project Purpose: This project accelerated the conversion of environmentally sensitive croplands to forest through the planting of native hardwood species. The project was targeted toward fields designated as “prior converted cropland” or “farmed wetland” with an emphasis on plantings in riparian corridors which provide streambank stability and/or connect fragmented habitats. Technical assistance was also provided for the improvement of already existing timber stands along with an information/education program. Project Location:

Counties of Union, Johnson, Alexander, Pulaski, and Massac

Subgrantee: Shawnee Resource Conservation and Development Area R.R. 6, Box 255 1305 North Carbon Marion, Illinois 62959 Project Reports and Other Informational Materials: “Cache River Reforestation Project – Phase 1 – Final Report.” March 17, 2000. Shawnee Resource Conservation & Development Area, Inc. “Managing Your Forestland.” (25 min. Videotape) March 2000. Conservation & Development Area, Inc.

Shawnee Resource

BMP Implementation Summary: BMP Code 612

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 2,601.8 ac. 72,000 ? ?

BMP Name Tree Planting

96-13(319)JC

Title: Tri-County Erosion, Sedimentation, and Stormwater Management Program Purpose: This project initiated the execution of the multi-county soil erosion and sedimentation control program implementation plan and ordinance prepared with funding under a FFY90 Section 319 grant. Funding was used to finance staff to review local erosion and sedimentation control plans, perform inspections and other enforcement procedures, carry-out education and training functions, maintain control standards and technical guides, ensure intergovernmental cooperation, and evaluate program effectiveness. Project Location:

Counties of Peoria, Woodford, and Tazewell

Subgrantee: Tri-County Regional Planning Commission 100 North Main Street, Suite 301 East Peoria, Illinois 61611-2533

65

Project Reports and Other Informational Materials: “Tri-County Erosion, Sediment & Storm Water Management Program – First Annual Report.” 1997. Tri-County Regional Planning Commission. “Tri-County Erosion, Sediment & Storm Water Management Program – Second Annual Report.” 1998. Tri-County Regional Planning Commission. 96-14(319)ST

Title: North Fork Embarras Watershed Project Purpose: This project protected and improved the water quality of the North Fork Embarras River (ILBEF05) watershed by reducing nonpoint source pollutants. A comprehensive sediment and nutrient reduction project was implemented that included watershed protection, information, and education programs. Upland BMPs installed included 33 grassed waterways, 25 sediment and nutrient retention structures, 3 critical area seedings, 3 water and sediment control basins, 2 terrace systems, and 13 grade stabilization structures. Eight streambank stabilization projects were installed on 2,373 linear feet of streambank on the main channel and its tributaries. These included one bendway weir project (consisting of seven weirs), one willow post planting, and six longitudinal peakstone toe protection projects. Project Location:

Counties of Jasper, Crawford, Edgar, Coles, Cumberland, and Clark

Subgrantee: North Fork Conservancy District Post Office Box 7, 110 East Main Casey, Illinois 62420 Project Reports and Other Informational Materials: “North Fork Embarras Watershed Project.” March 2000. North Fork Conservancy District. BMP Implementation Summary: BMP Code

BMP Name

Amount

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.)

580 412 638 342 600 657 410 350

Streambank/Shoreline Protection Grassed Waterway Water & Sediment Control Basin Critical Area Planting Terrace Wetland Restoration Grade Stabilization Structure Sediment Basin

2,373 ft. 44.81 ac. 875 ft. 4.5 ac. 1,475 ft. 2.7 ac. 13 (no.) 25 (no.)

18,452 12,374 285 3,276 189.5 440 1,492.5 7,225

96-15(319)JC

66

? ? ? ? ? ? ? ?

? ? ? ? ? ? ? ?

Title: Camp Creek Restoration and Watershed Management Purpose: This project improved water quality through the implementation of conservation practices on upland cropland, hog lots, destabilized streambanks, and the provision of education to the watershed community. Water quality benefits were achieved through construction of 1,350 feet of terraces and diversions, 47 water and sediment control basins, 3.7 acres of grassed waterways, 11.9 acres of critical area seedings, and 450 feet of willow post plantings for the stabilization of streambanks along Camp Creek (ILDGI01). Project Location:

Brown County

Subgrantee: Brown County Soil and Water Conservation District R.R. #4 Mt. Sterling, Illinois 62353 Project Reports and Other Informational Materials: “Camp Creek Restoration and Watershed Management Project – Final Report.” December 21, 1998. Brown County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 580 412 638 600

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 450 ft. 490 ? ? 3.7 ac. 775 ? ? 26,335 ft. 8,586.5 ? ? 1,350 ft. 106.5 ? ?

BMP Name Streambank/Shoreline Protection Grassed Waterway Water & Sediment Control Basin Terrace

96-16(319)JC

Title: Milne Creek Phase 2 Project Purpose: The City of Lockport continued the streambank stabilization of Milne Creek initiated with funding under Section 319 in FFY94. An additional 1,240 linear feet of streambank was stabilized using bio-engineering techniques (coconut rolls and Ajacks). Also, public education materials were developed and presented to advance the need for better care of the water resources in the area. Project Location:

Will County

Subgrantee: City of Lockport 222 East 9th Street Lockport, Illinois 60441 Project Reports and Other Informational Materials: “Milne Creek Stream Bank Stabilization Project – Final Report.” Lockport.

67

July 27, 1999.

City of

BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 1,240 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 67 57 113

96-17(319)JC

Title: Klein Creek Project Purpose: This project stabilized 1,000 feet of eroding streambanks along Klein Creek (ILGBK05) using bioengineering techniques (lunkers, willow posts, vegetation, etc.) to reduce erosion and improve water quality. Local teachers were taught techniques for controlling nonpoint source pollution and stabilizing eroding streambanks. These teachers presented this knowledge to their grade school classes and students developed and implemented nonpoint source pollution control strategies to control streambank erosion. Project Location:

DuPage County

Subgrantee: Forest Preserve District of DuPage County Fullersburg Woods Educational Center 3609 Spring Road Oak Brook, Illinois 60521 Project Reports and Other Informational Materials: “Klein Creek Stabilization Program – Final Report.” February 6, 2000. Forest Preserve District of DuPage County. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 1,000 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 10 10 20

96-19(319)CD

Title: Chicagoland Environmental Network Purpose: The Chicagoland Environmental Network facilitated the exchange of information and resources concerning nonpoint source pollution, water quality, and other related environmental issues. The public was provided access to information and volunteer opportunities through a computer database of environmental organizations and agencies involved in habitat restoration, wetlands, prairies, watershed projects, urban gardening, revitalization programs, energy conservation, and recycling. Project Location:

Cook County

68

Subgrantee: Chicago Zoological Society 3300 South Golf Road Brookfield, Illinois 60513 96-20(319)SR

Title: Southeast Illinois Oil Brine Damage Reclamation Project Purpose: This project demonstrated four (4) different cost-effective methods (organic matter, mineral application, plant materials, and composite test) for the reclamation of oil brine damaged sites to reduce nonpoint source pollution in the Wabash River (ILB07) and Saline River (ILAT05) watersheds. It is estimated that there is a total of 7,120 oil brine damaged sites within the project area. Runoff from these sites carry sediment, salinity, chlorides, and petroleum wastes. Four job sheets and an information packet were developed which describe materials, rates, and management techniques for use by affected landowners. Project Location:

Counties of Gallatin, Hamilton, Saline, & White.

Subgrantee: Shawnee Resource Conservation & Development Area, Inc. Rural Route 6, Post Office Box 255 1305 North Carbon Marion, Illinois 62959 Project Reports and Other Informational Materials: “Southeast Illinois Brine Damage Task Force – Illinois EPA Section 319 – Oil Brine Remediation Project.” (brochure) 2000. Southeast Illinois Brine Damage Task Force. “Southeast Illinois Brine Damage Reclamation Project – Final Report.” March 7, 2000. Southeast Illinois Brine Damage Task Force. BMP Implementation Summary: BMP Code 544

BMP Name Amount Land Reconstruction, Currently Mined Land 20 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

96-21(319)ST

Title: Determining the Effective Discharges of Illinois Streams Purpose: This project determined the effective discharges of Illinois streams so that these values can be used in guiding stream restoration projects. Effective discharge is the discharge (or range of discharges) that is responsible for transporting the comparatively largest fraction of the sediment load for that stream.

69

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 Project Reports and Other Informational Materials: “Effective Discharge of Illinois Streams.” November 2002. Illinois State Water Survey. 96-22(319)ST

Title: Pittsfield National Monitoring Program Purpose: This project continued the identification of sources of sediment and the efficiency of sediment control practices on the tributary watershed of Lake Pittsfield (ILRDP). This project was previously funded under Section 319 in federal fiscal years 1992, 1993, 1994, 1995, 1996, 1997, and 1998. Project Location:

Pike County

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 Project Reports and Other Informational Materials: “Evaluation of Sediment Delivery to Lake Pittsfield after Best Management Practice Implementation - National Monitoring Project Annual Report.” September 2000. Illinois State Water Survey. 96-23(319)ST

FFY 1997 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Honey Creek Watershed Project Purpose: This project involved the construction of 25 large ponds, along with 6 riffles and stream barbs in tributary streams of Honey Creek (ILKCAG01) to provide increased dissolved oxygen while retaining silt, nutrients, and pesticides from immediately entering the stream. The project augmented conventional land and water treatment programs currently existing in the watershed through the construction of water holding basins in the extreme lower reaches of the side tributaries off the main stem of Honey Creek. Project Location:

Pike County

70

Subgrantee: Pike County Soil & Water Conservation District 1319 West Washington Street Pittsfield, Illinois 62363 BMP Implementation Summary: BMP Code 378 584

BMP Name Pond Stream Channel Stabilization

Amount 25 (no.) ?

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 14,880 5,041 10,080 ? ? ?

97-1(319)JC

Title: North Fork Vermilion River Project Purpose: Operators in the North Fork Vermilion River (ILBPG09) watershed were contacted to increase awareness and to help them adopt conservation measures. Best management practices (BMPs) were designed and constructed to reduce siltation and nutrient/pesticide transport. BMPs to be used in this project included 6,150 feet of terraces and 7.5 acres of waterways. Public meetings will be conducted to increase awareness to all citizens in the watershed. Project Location:

Vermilion County

Subgrantee: Vermilion County Soil & Water Conservation District 191 South Henning Road Danville, Illinois 61832 Project Reports and Other Informational Materials: “North Fork Vermilion River Project – Final Report.” February 28, 1999. Vermilion County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 600 412

BMP Name Terrace Grassed Waterway

Amount 6,150 ft. 7.5 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 989 ? ? 240 ? ?

97-2(319)JC

Title: Upper Sangamon River Basin Water Quality Improvement Project Purpose: This project reduced the amount of nonpoint source (NPS) pollution in the Upper Sangamon River (ILE28) basin and Lake Decatur (ILREA) by working in direct cooperation with the majority of the basin’s land use decision makers. The two target NPS pollutants were nutrients and sediment. Through subcontracts with local soil and water conservation districts one-on-one on-site technical and

71

educational assistance was provided to landowners throughout the watershed. Cost-share funds were used to implement agricultural best management practices including GIS/GPS w/fertilizer monitors and two wetlands. Project Location:

Macon County

Subgrantee: City of Decatur #1 Gary K. Anderson Plaza Decatur, Illinois 62523-1196 Project Reports and Other Informational Materials: “Upper Sangamon River Basin Water Quality Improvement Project – Final Report.” August 31, 1999. Macon County SWCD. BMP Implementation Summary: BMP Code 657 590

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 3.0 ac ? ? ? 40,183 ac. ? ? ?

BMP Name Wetland Restoration Nutrient Management

97-3(319)JC

Title: Addison Creek Streambank Stabilization Project Purpose: This project stabilized approximately 2,720 feet of eroding streambanks along Addison Creek (ILGLA01) in the city of Northlake. The project included the installation of 715 feet of rip rap and 700 feet of lunkers on the north bank and 455 feet of rip rap and 850 feet of lunkers on the south bank to reduce erosion and improve water quality. Project Location:

Cook County

Subgrantee: Addison Creek River Conservation District 55 East North Avenue Northlake, Illinois 60164 Project Reports and Other Informational Materials: “Addison Creek Streambank Stabilization Project – Final Report.” August 1999. Christopher B. Burke Engineering, LTD. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 2,720 ft.

97-4(319)JC

72

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 209 178 356

Title: Streambank Stabilization of Spring Brook No. 1 Purpose: This project stabilized eroding streambanks along 4,000 feet of Spring Brook No.1 (ILGBKA), a tributary to the West Branch of the DuPage River using bioengineering techniques (i.e., re-establishment of native riparian vegetation, brush mattress, vegetated geogrid with fiber roll, etc.) to reduce erosion and improve water quality. Project Location:

DuPage County

Subgrantee: DuPage County Department of Environmental Concerns 421 North County Farm Road Wheaton, Illinois 60187 Project Reports and Other Informational Materials: “Spring Brook No. 1 Streambank Stabilization Project – Final Report.” January 1999. DuPage County Department of Environmental Concerns. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 4,000 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 528 449 898

97-6(319)JC

Title: TAM Golf Course Streambank Stabilization Purpose: This project stabilized approximately 1,715 feet of eroding streambanks along the North Branch of the Chicago River (ILHCC08) using bioengineering techniques (Ajacks, Bar Root River Birch, Red Twig Dogwood, prairie and wetland plants) and the creation of a 1.5 acre wetland to reduce erosion and improve water quality. An educational stand was installed to describe the wetland and streambank stabilization practices. Project Location:

Cook County

Subgrantee: Niles Park District 7877 Milwaukee Avenue Niles, Illinois 60714 Project Reports and Other Informational Materials: “TAM Golf Course Stream Bank Stabilization Project – Final Report.” June 1999. Niles Park District.

73

BMP Implementation Summary: BMP Code 580 800

BMP Name Streambank/Shoreline Protection Urban Stormwater Wetland

Amount 1,715 ft. 1.5 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 132 112 224 ? ? ?

97-7(319)SR

Title: Langendorf Pond Retrofit to Reduce Nonpoint Source Pollution Purpose: This project involved stream restoration activities and modification of an existing 2.5 acre impoundment (Langendorf Pond) on Flint Creek (ILDTZS01) to reduce nonpoint source pollution and enhance aquatic habitat. The modifications included 1) dam removal to restore the pond to a 300 foot long meandering stream channel and a wetland area, 2) installation of biotechnical streambank stabilization techniques along 360 feet of Flint Creek, 3) removal of a petting zoo, 4) establishment of a buffer of native prairie vegetation around the riparian area, and 5) installation of a 360 foot long swale to filter parking lot runoff. An interpretive signage system and educational program was also implemented to educate the public about nonpoint source pollution and the ecological benefits of the project. Project Location:

Lake County

Subgrantee: Village of Barrington Department of Public Works 206 South Hough Street Barrington, Illinois 60010 Project Reports and Other Informational Materials: “Langendorf Pond Retrofit to Reduce Nonpoint Source Pollution – A Project to retrofit an Onstream Impoundment in the Flint Creek Watershed.” April 2000. Village of Barrington. BMP Implementation Summary: BMP Code 500 009 580 657 472 835

BMP Name Obstruction Removal Stream Channel Restoration Streambank/Shoreline Protection Wetland Restoration Livestock Exclusion Urban Filter Strip

Amount 1 (no.) 300 ft. 360 ft. 2.06 ac. 0.5 ac. 360 ft.

97-8(319)ST

Title: National Monitoring Strategy on Lake Pittsfield

74

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? 2 1 3 4 3 7 ? ? ? ? ? ? ? ? ?

Purpose: This project continued the identification of sources of sediment and the efficiency of sediment control practices on the tributary watershed of Lake Pittsfield (ILRDP). This project was previously funded under Section 319 in federal fiscal years 1992, 1993, 1994, 1995, and 1996. The project was a cooperative Section 319/314 effort for lake restoration and water quality improvement. Project Location:

Pike County

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 97-9(319)ST

Title: Waukegan River National Monitoring Strategy (Phase 4) Purpose: This project continued the utilization of the national monitoring program initiated under Section 319 in federal fiscal year 1994 to demonstrate the effectiveness of biotechnical stream stabilization techniques implemented on the Waukegan River (ILQ01). A videotape was also produced which documents the monitoring program and the conditions of the physical and biological enhancements achieved on the Waukegan River. Project Location:

Lake County

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 Project Reports and Other Informational Materials: “Biological and Physical Monitoring of Waukegan River Restoration Efforts in Biotechnical Bank Protection and Pool/Riffle Creation - National Watershed Monitoring Project Annual Report.” May 1999. Illinois State Water Survey. 97-10(319)ST

Title: Des Plaines Streambank Restoration Project Purpose: This project stabilized approximately 4,000 feet of eroding streambanks along the Des Plaines River (ILG30) using bioengineering techniques to reduce erosion and improve water quality. Approximately 2,600 feet of streambank were stabilized through selective brush removal, weed control, and planting of native vegetation. Live stakes (450 feet) and live fascines (350 feet) were also installed. The slope was reconstructed on a 600 foot length of streambank. Because of the high potential for erosion, the fine-grained sands were removed from this site during reconstruction. An organic clay cover was placed over the site and covered with

75

soil and an erosion control blanket. The area was seeded and live stakes and posts installed. However, the clay cover interfered with the flow of groundwater into and out of the bank. Hydrostatic pressure exceeded the material strength, causing the bank to fail and be washed away by the river. Since the failure, vegetation was re-established and the 600 foot site was stabilizing. A catch basin, storm sewer, and rip rap outlet was also installed at a point of discharge of surface runoff into the river that was experiencing severe erosion. The project included an education/information component in which college students and local community residents were taught techniques for controlling nonpoint source pollution and stabilizing eroding streambanks. A videotape of the project was developed along with educational seminars and news releases. Project Location:

Cook County

Subgrantee: Oakton Community College 1600 East Golf Road Des Plaines, Illinois 60016-1268 Project Reports and Other Informational Materials: “DesPlaines Streambank Restoration Project – Final Report.” October 31, 2000. Community College.

Oakton

“Banking on Our Future.” (13 min. videotape) October 31, 2000. Oakton Community College. BMP Implementation Summary: BMP Code 580 945

BMP Name Streambank/Shoreline Protection Subsurface Drain (Catch Basin)

Amount 4,000 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 95 80 160 ? ? ?

97-11(319)SR

Title: Alternative Pavement Deicing Materials Brochure Purpose: An educational/technical assistance brochure was developed on alternatives to and appropriate uses of pavement deicing materials. The brochure addressed adverse environmental effects, alternative deicing materials, alternatives to deicing (e.g., abrasives, plowing), application rates and conditions, costs of deicing, and environmental costs of deicing. The brochure was distributed to affected parties representing highway agencies, local governments, and owners of commercial land, and made available to members of the general public and interest groups. Project Location:

Statewide

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097

76

Project Reports and Other Informational Materials: “Pavement Deicing – Minimizing the Environmental Impacts.” Northeastern Illinois Planning Commission.

Brochure.

April 1998.

97-12(319)ME

Title: Jefferson County Outdoor Education Facility Purpose: This project educated the citizens of Jefferson County about nonpoint source (NPS) pollution and the use of best management practices (BMPs) to control it. An existing outdoor educational facility was enhanced by using BMPs to promote the control of NPS pollution. A “Neighbor to Neighbor” program was implemented to strengthen the network of landowners who practice water quality protection and to promote the use of BMPs by others. Selected BMPs (i.e., filter strips, terraces, grassed waterways, ponds, streambank stabilization, etc.) were implemented through the “Neighbor to Neighbor” program to reduce NPS pollution in the Casey Fork (ILNJ07) watershed. Also, NPS pollution was reduced through the application of landscape waste and compost materials on oil brine damaged sites. Project Location:

Jefferson County

Subgrantee: Jefferson County Soil & Water Conservation District 109 Shiloh Drive Mt. Vernon, Illinois 62864 Project Reports and Other Informational Materials: “Jefferson County Outdoor Educational Facility – Final Report.” May 2000. Jefferson County Soil & Water Conservation District. Outdoor Educational Facility Self Guided Tour & Education Manual – Primary & Middle Grades.” May 2000. Jefferson County Soil & Water Conservation District. Outdoor Educational Facility Self Guided Tour & Education Manual – High School & Adult.” May 2000. Jefferson County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 543

BMP Name Amount Land Reconstruction, Abandoned Mine Land 1.5 ac.

97-13(319)ST

Title: Glen Shoals Restoration Project

77

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

Purpose: The project included the stabilization of approximately 3,605 feet of eroding shoreline along Glen Shoals Lake (ILROL) using bioengineering techniques (Ajacks, willow posts, vegetation, etc.). Project Location:

Montgomery County

Subgrantee: Montgomery County Soil & Water Conservation District 1621 Vandalia Road Hillsboro, Illinois 62049 BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 3,605 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 195 166 332

97-14(319)ST

Title: Willoway Brook Streambank Stabilization Project Purpose: This project reduced erosion and nonpoint source pollution through the stabilization of approximately 1,280 feet of eroding streambanks along Willoway Brook, a tributary of the East Branch DuPage River (ILBGL10), located on the Morton Arboretum property. Bioengineering techniques (i.e., lunkers, A-jacks, geogrid, minor stream re-grading, vegetative stabilization, fiber rolls) were used. Rock riffles were also installed in five locations. An educational program was implemented to present visitors with information on topics including water pollution control, best management practice implementation, and land use impacts on water resources. Project Location:

DuPage County

Subgrantee: The Morton Arboretum 4100 Illinois Route 53 Lisle, Illinois 60532-1293 Project Reports and Other Informational Materials: “Willoway Brook Streambank Stabilization Project – Final Report.” December 2001. Earth Tech. BMP Implementation Summary: BMP Code 580 584

BMP Name Streambank/Shoreline Protection Stream Channel Stabilization

Amount 1,280 ft. 1,280 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 120 102 205 40 34 68

97-17(319)CD

Title: Four Lakes Village Streambank Stabilization Project

78

Purpose: This project stabilized 1,135 feet of eroding streambanks along a segment of the East Branch of the DuPage River (ILGBL10) using bioengineering techniques to reduce erosion and improve water quality. A combination of A-jacks and gabion baskets were used to stabilize the toe of the streambank where a majority of high velocity flows occur. Above the A-jacks and gabion baskets, the soil was backfilled, covered with an erosion control blanket and seeded with native vegetation. Project Location:

DuPage County

Subgrantee: The Conservation Foundation 10S 404 Knoch Knolls Road Naperville, Illinois 60565 Project Reports and Other Informational Materials: “Four Lakes Streambank Stabilization Project.” May 8, 2000. The Conservation Foundation. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 1,135 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 125 106 212

97-18(319)JC

Title: Stream Classification & Fish Sampling Protocols Purpose: This project developed a system to delineate segments of Illinois streams and classify each segment into one of several possible categories or types developed guidelines for effectively sampling fish communities in Illinois streams, using electrofishing gear. Project Location:

Statewide

Subgrantee: Illinois History Survey Center of Aquatic Ecology 607 E. Peabody Drive Champaign, Illinois 61820 97-20(319)GG

Title: Initial Site Evaluation (ISE) Procedure for Wetland Creation or Restoration Purpose: This project involved the development of an Initial Site Evaluation (ISE) Procedure that can be used to evaluate the suitability of a site for wetland creation or restoration. The Report describes a rapid, transferable, standardized, and costeffective procedure for evaluating a site’s hydrogeologic potential for supporting a healthy wetland system. The Report identifies the hydrogeologic features along 79

with the associated ranking or appraisal criteria and guidelines that should be used to assess a site’s potential for successful wetland creation or restoration. The report contains guidance that will assist other users of the procedure, although it is expected that each user will differ in experience and may not be able to perform all aspects of the procedure. Project Location:

Statewide

Subgrantee: Illinois State Geological Survey 615 East Peabody Drive Champaign, Illinois 61820 Project Reports and Other Informational Materials: “A Hydrogeologic Procedure for Evaluating Wetland Restoration and Creation Sites.” February 20, 2003. Illinois State Geological Survey. 97-21(319)ST

Title: Conservation Reserve Enhancement Program (CREP) Assistance Purpose: The Association of Illinois Soil & Water Conservation District (AISWCD) helped counties facilitate the enrollment process of the Conservation reserve Enhancement Program (CREP) by setting appointments with producers to discuss CREP and conduct field visits to determine program eligibility. The county SWCDs completed the Conservation Reserve Program - 2 form, type the Conservation Plan of Operations, obtain the necessary producer signatures on required documents, and complete all state CREP enrollment forms. The county SWCDs coordinated activities associated with land surveys, producer signatures on easements, and recording easements with the local abstract office. Field assistance was provided to the survey and design teams as well as construction assistance by evaluating the construction expenses and completing form AD-862. Project Location:

Counties of Bureau, Christian, Fulton, Knox, Marshall, Menard, Montgomery, Putnam, Sangamon, & Shelby

Subgrantee: Association of Illinois Soil & Water Conservation Districts 2520 Main Street Springfield, Illinois 62702 97-22(319)JC

FFY 1998 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Cache River Watershed No Till Project Purpose: This project was aimed at limited resource farmers operating small farms within the Cache River (ILIX04) watershed. The objective of increasing no till crop production

80

by these hard to reach operators by 4,000 acres annually was accomplished by placing a no till drill in the Johnson, Pulaski-Alexander, and Union soil and water conservation districts. Education and technical assistance was provided through a Conservation Tillage Specialist employed via contract with the Shawnee RC & D. Project Location:

Johnson, Pulaski-Alexander, and Union Counties

Subgrantee: Shawnee Resource Conservation & Development Area R.R. 6, Box 255, 1305 N. Carbon Marion, Illinois 62959 Project Reports and Other Informational Materials: “Cache River Watershed No Till Project – Final Report.” April 4, 2000. Shawnee Resource Conservation & Development Area. BMP Implementation Summary: BMP Code 329

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 4,435.1 ac. 55,382 ? ?

BMP Name Conservation Tillage

98-1(319)JC

Title: Phase 2 Implementation of Flint Creek Watershed Management Plan Purpose: The purpose of this project was to continue the implementation of the Flint Creek Watershed Management Plan and demonstrate measures to address the nonpoint source pollution impacts of urban runoff and streambank erosion. Seven riffles were installed and approximately 2,400 feet of Flint Creek (ILDTZS01) were stabilized through a residential section of Barrington. An existing dry bottom detention basin was retrofitted to create a wetland detention basin in Lake Zurich to capture urban runoff pollutants and attenuate flow rates to Flint Creek. Approximately 800 feet of Flint Creek were stabilized along a reach of stream adjacent to Citizens for Conservation property. Project Location:

Lake County

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Flint Creek Watershed Restoration Projects – Final Report .” April 2000. Northeastern Illinois Planning Commission.

81

BMP Implementation Summary: BMP Code

BMP Name

Amount

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.)

580 800

Streambank/Shoreline Protection Urban Stormwater Wetland

3,200 ft. 1 (no.)

108 ?

108 6

216 22

98-2(319)SR

Title: Waukegan River Wetland Restoration Project Purpose: This project restored a 1/2 acre wetland adjacent to the Waukegan River (ILQ01) in Washington Park to reestablish the natural function and reduce nonpoint source pollution impacts. The project also included the stabilization of 300 feet of eroding streambank on the Waukegan River using bioengineering techniques. An interpretive observation station was constructed overlooking the site to present information about the project and nonpoint source pollution. Project Location:

Lake County

Subgrantee: Waukegan Park District 2000 Belvidere Street Waukegan, Illinois 60085 Project Reports and Other Informational Materials: “Waukegan River Wetland Restoration – Final Report.” December 2000. Waukegan Park District. BMP Implementation Summary: BMP Code 657 580

BMP Name Wetland Restoration Streambank/Shoreline Protection

Amount 0.5 ac. 300 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? 2 32 32 64

98-3(319)ST

Title: Mitchell Park Ravine Watershed Project Purpose: The project focused on soil erosion control and water quality in an urban watershed tributary to the Mississippi River and determined to be high priority by the East Moline Stormwater Committee. Proven soil erosion and sediment control and stormwater management approaches planned in consultation with the NRCS were utilized. Practices included grade stabilization structures, streambank stabilization, stormwater detention basins, critical area treatment, and permanent vegetative cover. Project Location:

Rock Island County

82

Subgrantee: City of East Moline 912 16th Avenue East Moline, Illinois 61244 Project Reports and Other Informational Materials: “Mitchell Park Ravine Watershed Project – Final Report.” July 2001. Landmark Engineering Group, Inc. BMP Implementation Summary: BMP Code 410 350 910 840 580

BMP Name Grade Stabilization Sediment Basin Rock Outlet Protection Grassed Lined Channel Streambank/Shoreline Protection

Amount 2 (no.) 3 (no.) 1 (no.) ? ac. ? ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?

98-5(319)ST

Title: Ground Water Protection through Pollution Prevention Purpose: The purpose of this project was to impact water quality as it relates to ground water resources in rural areas in the most positive way by implementing viable prevention programs on the local level. The scope of this project was integrated with ongoing activities related to the Illinois Department of Agriculture’s (IDOA) Ground Water Protection Program, Illinois FarmAsyst support mechanisms, as well as other related water quality efforts. Project Location:

Statewide

Subgrantee: Illinois Department of Agriculture Post Office Box 19281 Springfield, Illinois 62794-9281 98-6(319)JC

Title: Reducing Herbicides with GPS Application Purpose: Global Positioning System (GPS) equipment was mounted on an ordinary field sprayer and used to apply herbicides to cropland at four (4) field demonstrations over a two year period. The project was conducted in the Little Cache River (ILADDB01) watershed. This was done to demonstrate how GPS can reduce the amount of herbicide and still get acceptable crop production results. Field days were held at the demonstration area and special edition newsletters were distributed to promote and highlight this project.

83

Project Location: Subgrantee:

Johnson County

Johnson County Soil & Water Conservation District 807 North 1st Street Vienna, Illinois 62995

Project Reports and Other Informational Materials: “Reducing Herbicides with GPS Applications – Final Report.” May 1, 2000. Johnson County Soil & Water Conservation District. 98-7(319)ST

Title: Shelby Creek Restoration and Watershed Management Project Purpose: This project improved the water quality of Shelby Creek and the LaMoine River (ILDG01) through the implementation of conservation practices on upland cropland and destabilized streambanks. Implementation of best management practices included 1,700 feet of terraces and diversions, 104 water and sediment control basins (19,095 feet), 1.5 acres of grassed waterways, and 225 feet of streambank stabilization with willow posts. The project also provided education to the watershed community through news releases, newsletters, and tours. Project Location:

Brown County

Subgrantee: Brown County Soil & water Conservation District Rural Route #4 Mt. Sterling, Illinois 62353 Project Reports and Other Informational Materials: “Shelby Creek Restoration & Watershed Management Project – Final Report.” July 7, 2000. Brown County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 600 638 412 580

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 1,700 ft. 108 ? ? 19,905 ft. 2,339 ? ? 1.5 ac. 247 ? ? 225 ft. 162 ? ?

BMP Name Terrace Water & Sediment Control Basin Grassed Waterway Streambank/Shoreline Protection

98-8(319)JC

Title: Model Watershed for Water Quality Purpose: This project provided a hands-on opportunity for the public to learn about watershed management by viewing best management practices (BMPs) in a defined

84

watershed. In addition to the BMPs, information on signs and handout materials are available that will foster educated decisions regarding individual actions that will help improve water quality. Complete with a flowing stream, a wetland and a lake, a new exhibit was constructed on the grounds of the Illinois State Fair in 2001. Visitors can stroll through a 13-station miniature "watershed". Approximately one acre in size, the watershed park is located not far inside the Fair's main gates, behind and below the Department of Agriculture headquarters. Its stream, wetland and lake are all designed to provide fun and relaxation along with information about different land uses and environments in Illinois. A mix of static, hands-on and electronic displays was offered. Illustrating such diverse topics as urban stormwater runoff, geology, mined land and beneficial bugs, Watershed Park offers fair visitors benches, drinking water and a water drop mascot named "Splash." Recognizing the Fair's historic role as an agriculture exposition, there were stations illustrating farm and home safety, Illinois soil types, soil conservation and pasture management. Additional information about Watershed Park can be found at the Department of Agriculture's website at http://www.agr.state.il.us/Environment/LandWater/watershedpark.html Project Location:

Sangamon County

Subgrantee: Illinois Department of Agriculture State Fairgrounds, P.O. Box 19281 Springfield, Illinois 62794-9281 Project Reports and Other Informational Materials: “Model Watershed for Water Quality – Final Report.” January 31, 2002. Illinois Department of Agriculture. “Watershed Park. Where all of us make a difference!” (brochure) August 2001. Department of Agriculture.

Illinois

98-9(319)CD

Title: Old Tavern Park Shoreline Stabilization Project Purpose: The purpose of this project was to stabilize 1,250 linear feet of shoreline and create approximately 9,000 square feet of buffer zone in and around the retention basin located within Old Tavern Park. Shoreline stabilization was accomplished by using bioengineering techniques and the buffer zone will consist of a “no mow” grass mix and a low growing wet prairie mix. The project was located in the East Branch of the DuPage River (ILGBL05). Project Location:

DuPage County

Subgrantee: Lisle Park District 1825 Short Street Lisle, Illinois 60532

85

Project Reports and Other Informational Materials: “Old Tavern Park Shoreline Stabilization Project – Final Report.” April 25, 2000. Lisle Park District. BMP Implementation Summary: BMP Code 580

BMP Name Streambank /Shoreline Protection

Amount 1,250

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 6 5 11

98-10(319)ST

Title: Streambank Restoration on the West Branch, DuPage River Purpose: This project stabilized eroding streambanks along two (2) sites on the West Branch, DuPage River (ILGBK05) (610 feet), along three (3) sites on the East Branch, DuPage River (ILGBL10) (1,315 feet), and along one (1) site on Keeneyville Ditch, a direct tributary to Mallard Lake (ILWGX) (1,140 feet). The Project utilized bioengineering techniques (A-jacks, lunkers, brush clearing, re-grading, and native vegetation) to stabilize the streambank and enhance water quality, improve riparian corridor and restore wildlife habitat. The proposal also included a significant educational component geared towards the general public, stream users, streamside landowners, municipalities, and local schools. Project Location:

DuPage County

Subgrantee: The Conservation Foundation 10 S 404 Knoch Knolls Road Naperville, Illinois 60565 Project Reports and Other Informational Materials: “Streambank Restoration on West Branch DuPage River - DuPage County, IL. – Final Report.” April 12, 2000. The Conservation Foundation. “Streanbank Stabilization: Soft Solutions Produce Hard Results.” (11 min. videotape) April 2000. The Conservation Foundation. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 3,065 ft.

98-11(319)CD

Title: Greater Eliza Watershed Project

86

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 81 70 137

Purpose: The purpose of this project was to protect and improve the water quality of the Eliza Creek (ILMWD01) watershed by reducing nonpoint source pollutants. The project provided cost-share assistance to watershed landowners to implement a variety of upland and floodplain best management practices (i.e., sediment basins, ponds, terraces, waterways, grade stabilization structures, water and sediment control basins, vegetative filter strips). An educational program was also implemented to educate the public about the importance of streambank stabilization and nonpoint source pollution. Project Location:

Mercer County

Subgrantee: Mercer County Soil & Water Conservation District th 308 Southeast 8 Avenue Aledo, Illinois 61231 Project Reports and Other Informational Materials: “Greater Eliza Watershed Project – Final Report.” August 1, 2001. Mercer County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 350 378 393 410 412 600 638

BMP Name Sediment Basin Pond Filter Strip Grade Stabilization Structure Grassed Waterway Terrace Water & Sediment Control Basin

Amount 1 (no.) 4 (no.) 1.5 ac. 4 (no.) 6.4 ac 7,550 ft. 4,835

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 2,159 ? ? 670.6 ? ? 73.5 ? ? 741.4 ? ? 777 ? ? 732.4 ? ? 2,315.6 ? ?

98-12(319)JC

Title: Mackinaw River Project (Phase 2) Purpose: This project continued to build widespread community and individual support for the adoption of best management practices consistent with the consensus derived statement of objectives and strategies of the Mackinaw River Watershed Management Plan. The project focuses on education/outreach and the placement of highly visible best management practices at locations throughout the watershed. The project implemented four wetland restoration projects (20 acres); two sediment retention basins (5 acres); two streambank stabilization projects (1,100 feet) using re-grading, willows, and native vegetation; and woodland management (1.5 acres). Project Location:

Mason, Tazewell, Woodford, McLean, & Ford Counties

Subgrantee: The Nature Conservancy 1201 South Main Street Eureka, Illinois 61530 87

Project Reports and Other Informational Materials: “Mackinaw River Project – Phase 2 – Final Report.” Conservancy.

September 30, 2001.

The Nature

BMP Implementation Summary: BMP Code 350 580 657 666

BMP Name Sediment Basin Streambank/Shoreline Protection Wetland Restoration Woodland Improvement

Amount 2 (no.) 1,100 ft. 20 ac. 1.5 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? 48 41 82 ? ? ? ? ? ?

98-13(319)CD

Title: Waukegan River National Monitoring Program (Phase 5) Purpose: This project continued the utilization of the national monitoring program initiated under Section 319 in federal fiscal year 1994 to demonstrate the effectiveness of biotechnical stream stabilization techniques implemented on the Waukegan River (ILQ01). A videotape was also produced which documents the monitoring program and the conditions of the physical and biological enhancements achieved on the Waukegan River. Project Location:

Lake County

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 Project Reports and Other Informational Materials: “Biological & Physical Monitoring of Waukegan River Restoration Efforts in Biotechnical Bank Protection & Pool/Riffle Creation – National Watershed Monitoring Project.” May 2000. Illinois State Water Survey. 98-14(319)ST

Title: Pittsfield National Monitoring Program Purpose: This project continued the identification of sources of sediment and the efficiency of sediment control practices on the tributary watershed of Lake Pittsfield (ILRDP). This project was previously funded under Section 319 in federal fiscal years 1992, 1993, 1994, 1995, 1996, and 1997. Project Location:

Pike County

88

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 Project Reports and Other Informational Materials: “Evaluation of Sediment Delivery to Lake Pittsfield after Best Management Practice Implementation – National Monitoring Project. September 1999. Illinois State Water Survey. 98-15(319)ST

Title: Chicagoland Environmental Network Purpose: The Chicagoland Environmental Network facilitated the exchange of information and resources concerning nonpoint source pollution, water quality, and other related environmental issues. The public was provided access to information and volunteer opportunities through a computer database of environmental organizations and agencies involved in habitat restoration, wetlands, prairies, watershed projects, urban gardening, revitalization programs, energy conservation, and recycling. Project Location:

Cook County

Subgrantee: Chicago Zoological Society 3300 South Golf Road Brookfield, Illinois 60513 98-16(319)BL

Title: Northeastern Illinois Community Assistance Office Purpose: This project provided training to Natural Resource Conservation Service regional staff on water quality regulations and technical issues. Furthermore, the project encouraged the provision of nonpoint source pollution control related technical assistance to appropriate local agencies and organizations in northeastern Illinois. The Natural Resources Conservation Service’s Northeastern Illinois Community Assistance Office was established to serve the six county northeastern Illinois area. This office provided technical assistance to soil and water conservation districts, planning commissions, county departments, townships and municipalities in northeastern Illinois. In addition to direct technical assistance, the staff of this office provided information/education and training assistance. The major focus of the office was on erosion/sediment control, water quality, and natural resource management. Project Location:

Counties of Lake, McHenry, Kane, DuPage, Cook, and Will

89

Subgrantee: USDA Natural Resource Conservation Service 603 East Diehl Road, Suite 131 Naperville, Illinois 60563-7808 98-17(319)SR

Title: Water Quality Enhancement Training Purpose: A USDA – Natural Resources Conservation Service (NRCS) detailed a soil conservationist to the Illinois EPA’s Bureau of Water to assist the Illinois EPA in implementing Illinois’ Nonpoint Source Management Program. This NRCS employee 1) facilitated the integration of NRCS programs such as EQIP with the Illinois EPA’s watershed management planning program; 2) provided technical support in the development of program cross-training modules for staff of the Illinois EPA, NRCS, soil and water conservation districts, and the Illinois Farm Bureau; 3) provided updates on activities associated with the NRCS Watershed Science Institute, Water Science and Technology Team, Wetland Science Institute, and other special groups of the NRCS having activities impacting water quality and watershed planning; 4) assisted in Illinois EPA efforts to further promote the state water quality focus group under the guidance of the Natural Resources Coordinating Council and Watershed Management Committee; 5) trained Illinois EPA, NRCS, SWCDs, and the Illinois Farm Bureau in the use of NRCS Resource Planning Guidebook and updates; 6) incorporated use of the NRCS’s nine steps of planning for watershed planning; etc. Project Location:

Statewide

Subgrantee: USDA – Natural Resources Conservation Service 1902 Fox Drive Champaign, Illinois 61820 98-18(319)SR

Title: Roosevelt Park Pond & Waukegan River Restoration Purpose: This project included the design and installation of an interpretive signage and pathway, streambank (rock boulders with vegetation) and wetland restoration techniques (modification and installation of two riffles, wetland planting, deepen the existing forebay area) on the South Branch of the Waukegan River (ILQ01) by the retrofit of the existing Roosevelt Park sediment basin. These stream and wetland restoration efforts helped to improve water quality, create wildlife habitat, and provide for environmental education opportunities. Project Location:

Lake County

Subgrantee: Waukegan Park District 2000 Belvidere Street Waukegan, Illinois 60085

90

Project Reports and Other Informational Materials: “Roosevelt Park Pond/Waukegan River Restoration Project.” December 2004. Waukegan Park District. BMP Implementation Summary: BMP Code 580 584 800 835 870

BMP Name Streambank/Shoreline Protection Stream Channel Stabilization Urban Stormwater Wetland Urban Filter Strip Level Spreaders

Amount 1,135 ft. 500 ft. 1 (no.) 1 ac. 2 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 24 21 41 ? ? ? ? 701 2,354 ? ? ? ? 18 124

98-19(319)ST

Title: Jacksonville Branch Restoration Project – Phase 1 Purpose: This project installed best management practices (BMPs) along 1,960 feet of bank on Jacksonville Branch, a tributary to Jacksonville Branch, and a side channel reservoir (Lower Lagoon) of Jacksonville Branch (ILELA11) located at Washington Park in Springfield, Illinois. The BMPs were designed to arrest streambank and shoreline erosion and reduce nonpoint source pollution while enhancing aquatic habitat and aesthetics. The project included an educational component to inform residents and local government representatives about the project and nonpoint source pollution through a public meeting and signs. Project Location:

Sangamon County

Subgrantee: Springfield Park District th 2500 South 11 Street Springfield, Illinois 62703 Project Reports and Other Informational Materials: “Washington Park Lower Lagoon Streambank Stabilization – Final Report.” October 2004. Springfield Park District. BMP Implementation Summary: BMP Code 580 910

BMP Name Streambank/Shoreline Protection Rock Outlet Protection

Amount 1,960 ft. 1 (no.)

98-20(319)ST

Title: Lake Pittsfield Shoreline Restoration Project

91

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 85 72 144 ? ? ?

Purpose: This project stabilized approximately 2,100 feet of eroding shoreline along Lake Pittsfield (ILRDP) and established, where possible, a buffer of native vegetation along this segment of shoreline to reduce erosion, filter runoff, and enhance aquatic habitat. Project Location:

Pike County

Subgrantee: City of Pittsfield 215 North Monroe Street Pittsfield, Illinois 62363 Project Reports and Other Informational Materials: “Lake Pittsfield Shoreline Restoration Project – Final Report.” Associates, Inc.

May 2004.

Benton &

BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 2,100 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 35 29 59

98-21(319)ST

Title: Willoway Brook Streambank Stabilization Project – Phase 2 Purpose: This project stabilized approximately 1,050 feet of eroding streambank along Willoway Brook located in the Morton Arboretum. The streambank was stabilized using bioengineering techniques to reduce erosion and improve water quality. Willoway Brook is a tributary of the East Branch DuPage River (ILGBL10). The project included reshaping the streambank, erosion control blankets, native forbs and woody plants, vegetated geogrids, and fifteen rock riffles. Project Location:

DuPage County

Subgrantee: The Morton Arboretum 4100 Illinois Route 53 Lisle, Illinois 60532-1293 Project Reports and Other Informational Materials: “Willoway Brook Streambank Stabilization Project – Phase 2.” November 2, 2004. Landscape Resources, Inc. BMP Implementation Summary: BMP Code 584

BMP Name Stream Channel Stabilization

Amount 1,050 ft.

92

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 59 50 101

98-22(319)CD

Title: Lakeshore & Streambank Litter Collection Assistance Program Purpose: This project provided financial assistance to selected applicants to conduct lakeshore and streambank clean-up events. Local organizations that have previously conducted a lakeshore or streambank clean-up event were eligible to participate. The local sponsor was given up to $2,000 to help conduct their cleanup event. The local sponsor could use the funds for event promotion, event equipment or disposal fees. Project Location:

Statewide

Subgrantee: Not Applicable Project Reports and Other Informational Materials: “Streambank Cleanup and Lakeshore Enhancement, SCALE 2003.” Environmental Protection Agency.

June 2004.

Illinois

“Pilot “Streambank Cleanup And Lakeshore Enhancement” Program, SCALE.” July 2005. Illinois Environmental Protection Agency. 98-23(319)CD

FFY 1999 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Palzo Surface Mine Project Purpose: This project addressed surface mine drainage entering Sugar Creek (ILATHG01) from the abandoned portion of the Palzo Mine site. Sugar Creek is a tributary to the Saline River. The Palzo Surface Mine site has severely impacted water quality by perennially draining water of unacceptably high pH, acidity, total iron, and total manganese into the creek. The Illinois Abandoned Mine Lands Reclamation Division designed, constructed and supervised the construction and implementation of structures and techniques to remediate both surface and groundwater nonpoint source drainage into receiving waters. The project reclaimed 60 acres by grading spoil ridges to encourage surface runoff and constructing a reduced-permeability cap to further reduce infiltration, thereby reducing acid groundwater volumes and acid mine seepage. Use of an alkaline material for construction of the cap also provided some treatment to any rainfall that did infiltrate the area. Project Location:

Williamson County

Subgrantee: IDNR – Abandoned Mine Lands Reclamation Division 1907 A Industrial Park Drive Marion, Illinois 62959

93

Project Reports and Other Informational Materials: “Palzo Surface Mine Reclamation Project.” October 28, 2003. Illinois Department of Natural Resources. 99-2/1(319)JC

Title: Indian Lake Festival (Dragonfly Marsh Opening) Purpose: In cooperation with the Illinois EPA, the Brookfield Zoo held a celebration on August 14, 1999 for the official opening of the Dragonfly marsh" exhibit, developed with Section 319 funds under fiscal years 1995 and 1996. The celebration was designed to 1) announce the opening of the Dragonfly Marsh" exhibit, 2) recognize the participants in the exhibit's creation, 3) explain the exhibit's purpose and the importance of nonpoint source pollution control and wetland protection, 4) encourage continued educational activities, and 5) promote cooperation among public and private groups for enhance environmental awareness programs. Attendance at the celebration was by invitation only for selected representatives of environmental organizations, educational institutions, businesses, and governmental agencies. Project Location:

Cook County

Subgrantee: Chicago Zoological Society Brookfield Zoo 3300 Golf Road Brookfield, Illinois 60513 Project Reports and Other Informational Materials: “Salt Creek Wilderness, Indian Lake, Dragonfly Marsh Opening – Final Report.” March 2000. Brookfield Zoo. 99-2(319)SK

Title: Explore! A Child’s Nature Purpose: The Brookfield Zoo designed the "Explore! A Child's Nature" exhibit to present key concepts and interactive experiences which will highlight man's relationships with animals and nature; examine the ecological, economic, and philosophical connections between people and nature. Information on nonpoint source pollution and related water quality issues was incorporated into the exhibit. The exhibit communicates the impacts of nonpoint source pollution, the importance of water quality protection, and what can be done to minimize nonpoint source pollution and protect water quality. Project Location:

Cook County

94

Subgrantee: Chicago Zoological Society Brookfield Zoo 3300 South Golf Road Brookfield, Illinois 60513 99-3(319)JW

Title: Conservation Reserve Enhancement Program (CREP) Assistance Purpose: The Cass County Soil & Water Conservation District SWCD) facilitated the enrollment process of the Conservation reserve Enhancement Program (CREP) by setting appointments with producers to discuss CREP and conduct field visits to determine program eligibility. The Cass County SWCD completed the Conservation Reserve Program - 2 form, type the Conservation Plan of Operations, obtain the necessary producer signatures on required documents, and complete all state CREP enrollment forms. The Cass County SWCD coordinated activities associated with land surveys, producer signatures on easements, and recording easements with the local abstract office. Field assistance was provided to the survey and design teams as well as construction assistance by evaluating the construction expenses and completing form AD-862. Project Location:

Counties of Cass & Schuyler

Subgrantee: Cass County SWCD 652 South Main Street Virginia, Illinois 62691 99-4(319)JC

Title: Chicagoland Environmental Network Purpose: The Chicagoland Environmental Network facilitated the exchange of information and resources concerning nonpoint source pollution, water quality, and other related environmental issues. The public was provided access to information and volunteer opportunities through a computer database of environmental organizations and agencies involved in habitat restoration, wetlands, prairies, watershed projects, urban gardening, revitalization programs, energy conservation, and recycling. Project Location:

Cook County

Subgrantee: Chicago Zoological Society 3300 South Golf Road Brookfield, Illinois 60513 99-5(319)BL

95

Title: North Branch Chicago River Watershed Project – Phase 2 Purpose: Project partners implemented a variety of BMPs within the watershed. The types of BMPs were identified in the North Branch Chicago River (ILHCC08) Watershed management plan. In addition, the project partners continued to implement an outreach program for adults and children focusing on nonpoint source pollution control and water quality. The applicant investigated and documented the need for changes to local administrative policy, procedure and regulations to meet the plan’s goals and objectives. Project Location:

Counties of Cook and Lake

Subgrantee: Friends of the Chicago River 407 S. Dearborn Street, Suite 1580 Chicago, Illinois 60605 Project Reports and Other Informational Materials: “North Branch Chicago River Project – Final Report.” December 15, 2003. Friends of the Chicago River. BMP Implementation Summary: BMP Code 010 580 581 584 657 800 835 840 910

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 4 (no.) ? ? 2 13,050 ft. 1,751 1,738 3,472 350 ft. ? 6 20 3,170 ft. 286 286 752 157 ac. ? 2 2 1 (no.) ? 3 8 1 ac. ? ? ? 1 ac. ? ? ? 1 (no.) ? ? ?

BMP Name Oil & Grit Separator Streambank /Shoreline Protection Ditch Stabilization Stream Channel Protection Wetland Restoration Urban Stormwater Wetland Urban Filter Strip Grassed Line Channel Rock Outlet Protection

99-6(319)CD

Title: East Branch DuPage River WRAS Implementation – Phase 1 Purpose: Best management practices (BMPs) were installed in the East Branch DuPage River (ILGBL10) watershed to reduce nonpoint source (NPS) pollution. An existing storm sewer was “day lighted” and the flow redirected through a constructed wetland (0.69 ac.) before discharging to the East Branch. Both banks of a concrete lined channel were removed along a 1,400-foot segment of the East Branch DuPage River and a more natural stream channel restored as another urban runoff BMP. An existing detention pond was converted into a 1.65-acre stormwater wetland for enhanced pollutant removal. NPS pollution was reduced on Lacy Creek through approximately 6,902 ft. of bioengineering streambank stabilization, a 25foot wide riparian buffer, and the retrofit of an in-stream pond to restore a 1.15-acre

96

wetland system. Bioengineering techniques were applied to stabilize approximately 2,845 ft. and 1,325 ft. of streambank on Willow Way Brook and St. Joseph's Cr., respectively, both direct tributaries of the East Branch. The project also included an education program. The East Branch DuPage River is a Category 1 watershed in the Unified Watershed Assessment. The TMDL and implementation plan for the East Branch DuPage River are complete. Project Location:

DuPage County

Subgrantee: The Conservation Foundation 10 S 404 Knoch Knolls Road Naperville, Illinois 60565 Project Reports and Other Informational Materials: “East Branch DuPage River Watershed Restoration Action Strategy Implementation – Final Report.” May 2003. The Conservation Foundation. BMP Implementation Summary: BMP Code 009 580 657 800 835 870

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 2,800 ft. ? ? ? 11,072 ft. 571 532 1,064 1.84 ac. ? 14 48 1 (no.) ? 337 1,158 1 ac. ? ? ? 1 (no.) ? ? ?

BMP Name Stream Channel Restoration Streambank /Shoreline Protection Wetland Restoration Urban Stormwater Wetland Urban Filter Strip Level Spreader

99-8(319)SR

Title: Macoupin Creek WRAS Development Purpose: The Illinois EPA assisted local stakeholders with the development of a Watershed Restoration Action Strategy (WRAS) for the Macoupin Creek (ILDA04) watershed, which is a Category 1 watershed identified in the Unified Watershed Assessment. The WRAS is consistent with the Illinois EPA’s draft “Guidance for Developing Watershed Implementation Plans.” The WRAS identifies all of the resources, identifies the sources and causes of pollution, and specifies the recommended best management practices for restoration and protection of the watershed. Project Location:

Macoupin County

Subgrantee: Macoupin County Soil & Water Conservation District 300 Carlinville Plaza Carlinville, Illinois 62626 Project Reports and Other Informational Materials: “Upper Macoupin Creek Watershed Restoration Action Strategy.” May 1, 2003. Macoupin County Soil & Water Conservation District.

97

99-9(319)GE

Title: Little Vermilion River WRAS Development Purpose: The Illinois EPA assisted local stakeholders with the development of a Watershed Restoration Action Strategy (WRAS) for the Little Vermilion River (ILDR01) watershed, which is a Category 1 watershed identified in the Unified Watershed Assessment. The WRAS is consistent with the Illinois EPA’s draft “Guidance for Developing Watershed Implementation Plans.” The WRAS identifies all of the resources, identifies the sources and causes of pollution, and specifies the recommended best management practices for restoration and protection of the watershed. Project Location:

LaSalle County

Subgrantee: LaSalle County Soil & Water Conservation District st 1691 North 31 Road Ottawa, Illinois 61350 Project Reports and Other Informational Materials: “A Watershed Restoration Action Strategy for the Little Vermilion River Watershed, LaSalle County, Illinois.” 2003. LaSalle County Soil & Water Conservation District. 99-10(319)GE

Title: Total Maximum Daily Load & Implementation Plan Development Purpose: This project developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within two (2) specific watersheds (East Fork, Kaskaskia (ILOK01); Rayse Creek (ILNK01)) on the 303(d) list through the computer modeling. The two watersheds were also Category 1 watersheds in the Unified Watershed Assessment. For each watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. Project Location:

Counties of Clinton, Marion, Fayette, and Jefferson

Subgrantee: Harza Engineering Company 233 South Wacker Drive Chicago, Illinois 60606-6392 Project Reports and Other Informational Materials: “Rayse Creek (ILNK01) TMDL and Implementation Plan.” September 2003. MWH. 98

“East Fork, Kaskaskia River (ILOK01) TMDL and Implementation Plan.” August 2003. MWH. 99-11(319)GE

Title: Total Maximum Daily Load & Implementation Plan Development Purpose: This project developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within two (2) specific watersheds, Salt Creek (ILGL09) and E. Br. DuPage River (ILGBL10), on the 303(d) list through computer modeling. The two watersheds were also Category 1 watersheds in the Unified Watershed Assessment. For each watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. Project Location:

Counties of Cook, DuPage, and Will

Subgrantee: CH2MHill 727 North First Street, Suite 400 St. Louis, Missouri 63102-2542 Project Reports and Other Informational Materials: 99-12(319)BY

Title: Conservation Reserve Enhancement Program (CREP) Assistance Purpose: The McDonough County Soil & Water Conservation District SWCD) facilitated the enrollment process of the Conservation reserve Enhancement Program (CREP) by setting appointments with producers to discuss CREP and conducting field visits to determine program eligibility. The McDonough County SWCD completed the Conservation Reserve Program - 2 form, type the Conservation Plan of Operations, obtained the necessary producer signatures on required documents, and completed all state CREP enrollment forms. The McDonough County SWCD coordinated activities associated with land surveys, producer signatures on easements, and recording easements with the local abstract office. Field assistance was provided to the survey and design teams as well as construction assistance by evaluating the construction expenses and completing form AD-862. Project Location:

Counties of McDonough and Hancock

Subgrantee: McDonough County SWCD 1607 West Jackson Street Macomb, Illinois 61455 99-13(319)JW

99

Title: Conservation Reserve Enhancement Program (CREP) Assistance Purpose: The Peoria County Soil & Water Conservation District SWCD) facilitated the enrollment process of the Conservation reserve Enhancement Program (CREP) by setting appointments with producers to discuss CREP and conducted field visits to determine program eligibility. The Peoria County SWCD completed the Conservation Reserve Program - 2 form, type the Conservation Plan of Operations, obtained the necessary producer signatures on required documents, and completed all state CREP enrollment forms. The Peoria County SWCD coordinated activities associated with land surveys, producer signatures on easements, and recording easements with the local abstract office. Field assistance was provided to the survey and design teams as well as construction assistance by evaluating the construction expenses and completing form AD-862. Project Location:

Counties of Peoria and Tazewell

Subgrantee: Peoria County SWCD 2412 West Nebraska Avenue Peoria, Illinois 61604 99-14(319)JW

Title: Watershed Management Coordination Purpose: The Northeastern Illinois Planning Commission (NIPC) provided coordination and technical assistance to entities (local governments, soil and water conservation districts, planning committees, businesses, volunteer organizations, etc.) undertaking comprehensive watershed management initiatives in northeastern Illinois. NIPC assisted these entities with the development of Watershed Restoration Action Strategies (WRASs) and Watershed Implementation Plans (WIPs), as defined by the Illinois EPA. Priority was given to those watersheds that contain nonpoint source pollution control projects funded by the Illinois EPA, and those within Clean Water Act 303(d) listed waters and/or the Unified Watershed Assessment and Watershed Restoration Priorities for Illinois as identified by the Illinois EPA. NIPC assisted these entities in the compilation and evaluation of resource inventory data, formulation of water quality objectives, selection and implementation of nonpoint source pollution control practices, dissemination of information/education materials for water quality protection, and evaluating program success. Project Location:

Counties of Lake, McHenry, Kane, Cook, DuPage, & Will

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 99-15(319)SR

100

Title: GIS Programming for BMP Location Purpose: The Illinois EPA developed a strategy to establish a geographic information system (GIS) interface with the Illinois EPA’s Projects 2000 database and perform specific queries of the Projects 2000 database. The Projects 2000 database contains the location and other information of best management practices (BMPs) implemented by the Illinois EPA with funding under Section 319 of the Clean Water Act. Programs were developed to allow Illinois EPA to query and map information contained in the Projects 2000 database. The maps identify the type and location of BMPs implemented in selected watersheds along with political subdivisions, surface waters, roads, railways, and other appropriate physical and institutional features. Project Location:

Statewide

Subgrantee: Not Applicable 99-16(319)CD

Title: Mackinaw River Watershed Project – Woodford County Purpose: This project supplemented Phase 1 and Phase 2 of the Mackinaw River W atershed Project. The project focused on the implementation of a cost-share program to assist landowners in the installation of sediment and stormwater retention and streambank stabilization best management practices (BMPs) in the Woodford County portion of the Mackinaw River (ILDK13) watershed. All work was implemented in accordance with the Mackinaw River Watershed Management Plan and the three subwatershed plans as approved by the Illinois EPA. BMPs implemented under this project included twelve ponds (15.2 ac.), one block chute, three grassed waterways (4.3 ac.), 1,175 feet of streambank stabilization, seven riffles to stabilize 635 feet of streambed, and two water and sediment control basins (1,100 ft.). Project Location:

Woodford County

Subgrantee: Woodford County Soil & Water Conservation District 937 West Center Street Eureka, Illinois 61530 Project Reports and Other Informational Materials: “Mackinaw River Project – Woodford County - Final Report.” December, 2003. Woodford County Soil & Water Conservation District.

101

BMP Implementation Summary: BMP Code 378 410 412 580 584 638

BMP Name Pond Grade Stabilization Structure Grassed Waterway Streambank/Shoreline Protection Stream Channel Stabilization Water & Sediment Control Basin

Amount 12 (no.) 1 (no.) 4.3 ac 1,175 ft. 635 ft. 1,100 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 404 96 194 14 14 28 105 105 210 419 119 237 ? ? ? 21 21 42

99-17(319)CD

Title: Mackinaw River Watershed Project – Tazewell County Purpose: This project supplemented Phase 1 and Phase 2 of the Mackinaw River (ILDK13) Watershed Project. The project was focused on the implementation of a cost-share program to assist landowners in the installation of streambank stabilization best management practices (BMPs) in the Tazewell County portion of the Mackinaw River watershed. All work to be implemented was in accordance with the Mackinaw River Watershed Management Plan and the three subwatershed plans as approved by the Illinois EPA. Project Location:

Tazewell County

Subgrantee: Tazewell County Soil & Water Conservation District 2934 Court Street Pekin, Illinois 61554 Project Reports and Other Informational Materials: “Final Report for Mackinaw River Project – Tazewell County.” July 2004. Tazewell County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 580 584

BMP Name Streambank/Shoreline Protection Stream Channel Stabilization

Amount 5,470 ft. 2,400 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 2,251 1,940 3,880 313 266 532

99-18(319)CD

Title: Mackinaw River Watershed Project – NRCS Technical Support Purpose: The Natural Resources Conservation Service provided technical assistance to the Woodford and Tazewell County Soil and Water Conservation Districts for the implementation of best management practices (BMPs) in the Mackinaw River (ILDK13) watershed. Technical assistance included survey, design, permitting and final construction checks. This project supplemented Phase 1 and Phase 2 of the

102

Mackinaw River Watershed Project. All work implemented was in accordance with the Mackinaw River Watershed Management Plan and the three subwatershed plans as approved by the Illinois EPA. Project Location:

Counties of Tazewell and Woodford

Subgrantee: USDA – NRCS 1902 Fox Drive Champaign, Illinois 61820 99-19(319)CD

Title: Village of Royal Lakes – Shad Lake Restoration Project Purpose: The Village of Royal Lakes continued work with the Natural Resources Conservation Service (NRCS) and the Illinois EPA to stabilize eroding lake shoreline and to install a water and sediment retention basin (wetland) upstream of Shad Lake. Shad Lake is located within the Illinois River watershed. This project was the second phase of a major watershed management effort. The first phase included working with landowners and operators in the watershed to install best management practices to reduce soil erosion and stormwater runoff. Phase two implemented lakeshore and in-lake best management practices. The basin/wetland will retain stormwater runoff and trap sediment from a 320-acre subwatershed. The third and final phase completed dredging of Shad Lake. The project site demonstrates a “total” lake restoration project, (planning, watershed implementation, lake implementation and finally dredging). In addition to the sediment basin implemented with Section 319 funding, the project also included 520 feet of shoreline stabilization (PLWIP) and construction of ten water and sediment control basins (CPP). Project Location:

Macoupin County

Subgrantee: Village of Royal Lakes 549 West Shipman Road Shipman, Illinois 62685 Project Reports and Other Informational Materials: “Village of Royal Lakes – Shad Lake Restoration Project – Final Report.” October 2002. Village of Royal Lakes. BMP Implementation Summary: BMP Code 350 580 638

BMP Name Sediment Basin Streambank/Shoreline Protection Water & Sediment Control Basin

Amount 1 (no.) 520 (ft.) 2,000 ft.

99-20(319)CD

103

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 244 25 144 265 265 530 58 ? ?

Title: Lincoln Memorial Garden NPS Control – Phase 2 Purpose: This project was a continuation of the Lincoln Memorial Garden NPS Pollution Control Project funded under the FFY 1995 Section 319 grant. Lincoln Memorial Garden is listed on the National Historic Register as a “historic landscape”. The project area, recently acquired by the Garden, is across the street from the original garden. The project site is located upstream of a number of in-stream best management practices applied during the original project, all of which are located upstream of Lake Springfield (ILREF). Lincoln Memorial Garden staff coordinated the retrofit of an existing water detention basin into a wetland. In addition, staff coordinated the removal of an accumulation of materials left by the previous landowner (deceased). Garden staff inventoried the materials removed, and identified the most interesting items found. The inventory and special items were used to promote the need to stop illegal dumping and littering. Project Location:

Sangamon County

Subgrantee: Lincoln Memorial Garden 2301 East Lake Drive Springfield, Illinois 62707 Project Reports and Other Informational Materials: “Lincoln Memorial Garden NPS Control – Phase 2 – Final Report.” January 30, 2004. Lincoln Memorial Garden. BMP Implementation Summary: BMP Code 657 562

BMP Name Wetland Restoration Recreational Area Improvement

Amount 0.7 (ac.) 6 (ac.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 6 ? ? ? ? ?

99-21(319)CD

Title: Salt Creek Stabilization – Rolling Meadows Purpose: This project reduced erosion and nonpoint source pollution through the stabilization of 1,800 feet of eroding streambank along a 3,000-foot segment of Salt Creek (ILGL09) located in Rolling Meadows, Illinois. Bioengineering techniques (i.e., vegetated gabion baskets, re-grading and stone toe protection, and clearing and revegetation with native vegetation) were used. Salt Creek is a Category 1 watershed in the Unified Watershed Assessment. The TMDL and implementation plan for Salt Creek are complete. Project Location:

Cook County

104

Subgrantee: City of Rolling Meadows 3600 Kirchoff Road Rolling Meadows, Illinois 60008 Project Reports and Other Informational Materials: “Salt Creek Streambank Stabilization Project – Final Report.” January 2004. Christopher B. Burke Engineering, Ltd. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 1,800 (ft.) 297 252 504

99-22(319)SR

Title: Northwest Illinois Livestock Project Purpose: This project involved the implementation of best management practices (BMPs) for milk house waste that are appropriate for northwestern Illinois. The project explained the benefits and limitations for each BMP. Cost share and incentive payments were used to facilitate implementation of new or upgraded milk house waste handing facilities, based on water quality criteria. Project Location:

Counties of Carroll, Jo Daviess, Stephenson, and Whiteside

Subgrantee: Blackhawk Hills RC&D, Inc. 102 East Route 30, Suite 2 Rock Falls, Illinois 61071 Project Reports and Other Informational Materials: “Northwest Illinois Livestock Project.” March 2005. Blackhawk Hills RC&D, Inc. BMP Implementation Summary: BMP Code 313

BMP Name Waste Storage Structure

Amount 17 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

99-23(319)ST (JC)

FFY 2000 FEDERALLY FUNDED SECTION 319 PROJECTS

Title: Pittsfield National Monitoring Program

105

Purpose: This project completed the identification of sources of sediment and the efficiency of sediment control practices on the tributary watershed of Lake Pittsfield (ILRDP). This project was funded each year under Section 319 since 1992. Project Location:

Pike County

Project Reports and Other Informational Materials: 00-1(319)ST

Title: Waukegan River National Monitoring Program Purpose: This project completed the utilization of the national monitoring program initiated under Section 319 in federal fiscal year 1994 to demonstrate the effectiveness of biotechnical stream stabilization techniques implemented on the Waukegan River (ILQ01). A videotape was also produced, which documents the monitoring program and the conditions of the physical and biological enhancements achieved on the Waukegan River. Project Location:

Lake County

Subgrantee: Illinois State Water Survey Post Office Box 697 Peoria, Illinois 61652-0697 00-2(319)ST

Title: Northern Illinois Community Assistance Office Purpose: This project provided training to Natural Resource Conservation Service regional staff on water quality regulations and technical issues. Furthermore, the project encouraged the provision of nonpoint source pollution control related technical assistance to appropriate local agencies and organizations in northeastern Illinois. The Natural Resources Conservation Service’s Northeastern Illinois Community Assistance Office was established to serve the six county northeastern Illinois area. This office provided technical assistance to soil and water conservation districts, planning commissions, county departments, townships and municipalities in northeastern Illinois. In addition to direct technical assistance, the staff of this office provided information/education and training assistance. The major focus of the office was on erosion/sediment control, water quality, and natural resource management. Project Location:

Counties of Lake, McHenry, Kane, DuPage, Cook, and Will

Subgrantee: USDA Natural Resources Conservation Service 603 East Diehl Road, Suite 131 Naperville, Illinois 60563-1476

106

00-4(319)SR

Title: Evaluation of Treated Swine Waste Application Purpose: This project assessed a new method of treating swine waste called aerobic thermophilic treatment (AT Treatment) in terms of its ability to reduce nutrient and bacterial nonpoint source (NPS) pollution as compared to current practices in growing corn following swine waste application. Data was collected on NPS nutrient and bacterial pollution arising from the application of treated swine waste as a nutrient source for corn. Instead of sampling and analysis at a given pork producer’s operation and application to his corn fields where large numbers of environmental samples would be required for statistical confidence, this assessment used constructed replicate field plots where ground and surface water can be collected and sampled. A statistically designed study using 12 constructed field lysimeters with triplicate treatments of AT treated fertilizer, lagoon treated fertilizer with inorganic nitrogen fertilizer added to increase nitrogen value and an untreated control was used. The comparative study between the treatments assessed the levels of contamination of ammonia nitrogen, nitrate nitrogen, total nitrogen, ortho-phosphate-P, total phosphorus and fecal coliforms. Collected data was analyzed and disseminated to the public through an Internet web page and by presentations. Project Location:

Jackson County

Subgrantee: Southern Illinois University, Research Development & Administration Carbondale, Illinois 62901-4709 00-5(319)JC

Title: 2nd National NPS Pollution Control Information/Education Conference Purpose: The purpose of this project was to bring together a variety of entities involved in nonpoint source pollution control information and education programs in the United States. The conference focused on those groups and individuals with an interest in nonpoint source pollution control information and education projects and those with experience in information and education projects. The conference included sessions, displays, and field trips to share a variety of nonpoint source pollution control information and education programs that are currently being implemented or are under development. The conference was held May 14 – 17, 2001 in Chicago, Illinois. Project Location:

Cook County

Subgrantee: Chicago Botanic Garden 1000 Lake Cook Road Glencoe, Illinois 60022

107

Project Reports and Other Informational Materials: “2nd National Conference Nonpoint Source Pollution Information & Education Programs.” March 2002. Chicago Botanic Garden. 00-6(319)BL

Title: Farm Progress Show/Illinois State Fair 2000 Purpose: The purpose of this project was to create a nonpoint source pollution control/water quality display for the 2000 Farm Progress Show and Illinois State fair. The target audience was Illinois agricultural producers and their families. Illinois agriculture covers approximately 87 percent of the state. The Farm Progress Show is held in Illinois every three years. Attendance is estimated at 250,000 (rainy weather) to over 500,000 (sunshine). Eighty percent of the attendees are from within 100 miles of the show with the remaining 20 percent from everywhere else, including England, Australia, Canada, Mexico, etc. Project Location:

Sangamon County

Subgrantee: Not Applicable 00-7(319)CD

Title: Armitage Creek Project Purpose: Approximately 2,420 feet of Armitage Creek, a tributary of the East Branch DuPage River (ILGBL10), were stabilized utilizing bioengineering techniques (a-jacks, fiber roll, vegetation) to protect streambanks and enhance water quality. A drop structure was also constructed to receive flow from a roadside swale and eliminate scour. The project included an educational component to inform residents and property owners through newsletters, meetings, and workshops. Project Location:

DuPage County

Subgrantee: Village of Glendale Heights 300 Civic Center Plaza Glendale Heights, Illinois 60139 Project Reports and Other Informational Materials: “Armitage Creek Streambank Stabilization Project – Final Report.” October 23, 2003. Village of Glendale Heights.

108

BMP Implementation Summary: BMP Code 580

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 2,420 (ft.) 199 168 337

BMP Name Streambank/Shoreline Protection

00-8(319)SR

Title: North Fork Embarras Watershed Project – Phase 2 Purpose: This project protected and improved the water quality of the North Fork Embarras River (ILBEF05) watershed by reducing nonpoint source pollution through a continuation of the efforts initiated with Section 319 funding under federal fiscal year 1996. A comprehensive program of sediment and nutrient reduction was implemented that included watershed protection, information, and education efforts. Upland BMPs installed included 21 grassed waterways, 16 sediment basins, 1 water and sediment control basin, 1 pond, 2 terraces, and 5 grade stabilization structures. One streambank stabilization project using longitudinal peakstone toe protection was installed on 60 linear feet of streambank on the main channel. Project Location:

Counties of Jasper and Clark

Subgrantee: North Fork Conservancy District Post Office Box 7, 110 East Main Casey, Illinois 62420 Project Reports and Other Informational Materials: “North Fork Embarras Watershed Project – Final Report.” April 2002. North Fork Conservancy District. BMP Implementation Summary: BMP Code 350 378 410 412 580 600 638

BMP Name Sediment Basin Pond Grade Stabilization Structure Grassed Waterway Streambank/Shoreline Protection Terrace Water & Sediment Control Basin

Amount 16 (no.) 1 (no.) 5 (no.) 48.4 ac. 60 ft. ? 55 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 525 149 301.5 63 21 42 19 19 37 195 186 371 61 61 122 17 11 20.5 33 ? ?

00-9(319)JC

Title: Nutrient Management Plan Implementation Purpose: This project demonstrated to producers that Nutrient Management Plans should be an integral component to their farming operation. Producers were provided with an incentive payment to follow (not exceed) the nitrogen rate, timing, and application

109

guidelines established by the University of Illinois within watersheds identified as having nitrate impaired waters. The short-term goal was to increase the number of acres managed according to nutrient management plans in the selected watersheds. The long-term goal was to maintain the number of acres managed with nutrient management plans in these watersheds after the project ends and to be able to demonstrate to other producers in the State the value of nutrient management planning. Waterbodies protected included Lake Decatur (ILREA), Lake Bloomington (ILRDO), Paris Twin Lakes (ILRBX), Georgetown Lake (ILRBS), and Lake Vermilion (ILRBD). Project Location:

Counties of Edgar, Champaign, Macon, McLean, and Vermilion

Subgrantee: Association of Illinois Soil & Water Conservation Districts 2520 Main Street Springfield, Illinois 62702 Project Reports and Other Informational Materials: “Draft Watershed Plan for the Little Vermilion River. October 2004. Champaign County Soil and Water Conservation District. BMP Implementation Summary: BMP Code 590

BMP Name Nutrient Management

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 79,321 (ac.) ? 23,511 46,451

00-10(319)JC

Title: Salt Creek Streambank Stabilization – Phase 2 Purpose: This project reduced erosion and nonpoint source pollution through the stabilization of 1,975 feet of eroding streambank along a segment of Salt Creek (ILGL09) located in Wood Dale, Illinois. Bioengineering techniques (i.e., a-jacks, erosion control blankets, willow posts, fiber roll) were used. This was a continuation of a streambank stabilization effort on Salt Creek initiated in 1998 with FFY94 Section 319 funding. Salt Creek is a Category 1 watershed in the Unified Watershed Assessment and is currently under TMDL development. Project Location:

DuPage County

Subgrantee: City of Wood Dale 404 North Wood Dale Road Wood Dale, Illinois 60191 Project Reports and Other Informational Materials: “Salt Creek Stream Bank Stabilization Project – Phase 2 – Final Report.” February 11, 2002. City of Wood Dale.

110

BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 1,975 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 301 255 511

00-11(319)SR

Title: North Fork Vermilion River Project – Phase 2 Purpose: Operators in the area were contacted to increase awareness and to help them adopt conservation measures. Best management practices (BMPs) were designed and constructed to reduce siltation and nutrient/pesticide transport. BMPs used in this project included grassed waterways (6.07 ac.), grade stabilization structures (7), terraces (7,515 ft.), and tree planting (1.5 ac.). Public meetings and other educational programs, including a cover crop demonstration, were conducted to increase awareness to all citizens in the watershed. This was a continuation of an effort on the North Fork Vermilion River (ILBPG09) initiated with FFY97 Section 319 funding. The North Fork Vermilion River is a Category 1 watershed in the Unified Watershed Assessment. Project Location:

Vermilion County

Subgrantee: Vermilion County Soil & Water Conservation District 191 South Henning Road Danville, Illinois 61832 Project Reports and Other Informational Materials: “North Fork Vermilion River Project – Phase 2 – Final Report.” November 2002. Vermilion County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 410 412 600 612

BMP Name Grade Stabilization Structure Grassed Waterway Terrace Tree Planting

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 7 (no.) 9 9 18 6.07 (ac.) 86.5 86 171 7,515 (ft.) 480 482 964 1.5 (ac.) 3 6 12

00-12(319)JC

Title: West Branch DuPage River Streambank Restoration – Phase 2 Purpose: This project reduced erosion and nonpoint source pollution through the stabilization of eroding streambanks along 300 feet of the West Branch DuPage River (ILGBK05) using bendway weirs, biotechnical slope stabilization, and vegetation. This was a continuation of a streambank stabilization effort on the West Branch

111

DuPage River initiated with FFY98 Section 319 funding. The West Branch DuPage River is a Category 1 watershed in the Unified Watershed Assessment. The project also included an education component involving an urban best management practices workshops. Project Location:

DuPage County

Subgrantee: The Conservation Foundation 10 S 404 Knoch Knolls Road Naperville, Illinois 60565 Project Reports and Other Informational Materials: “West Branch DuPage River Streambank Restoration – Phase 2 – Final Report.” May 2002. The Conservation Foundation. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 300 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 81 81 162

00-13(319)SR

Title: Senachwine Creek Watershed Project – Phase 2 Purpose: This project improved water quality through the treatment of uplands and floodplains in the Senachwine Creek (ILDM01) watershed, and through the implementation of a watershed educational/training program. Cost-share assistance was provided to watershed landowners to implement a variety of upland and floodplain best management practices (BMPs). Upland BMPs included 54,507.5 feet of terraces, 13 acres of waterways, 36 water and sediment control basins, 1 grade stabilization structures, and one animal waste management system project. Floodplain BMPs included 12 ponds and 1 streambank stabilization project. This was a continuation of an effort initiated with FFY94 Section 319 funding. Senachwine Creek is a Category 1 watershed in the Unified Watershed Assessment. The project also included an educational component to increase public awareness concerning nonpoint source pollution control. Project Location:

Peoria County

Subgrantee: Illinois River Soil Conservation Task Force 2412 West Nebraska Avenue Peoria, Illinois 61604 Project Reports and Other Informational Materials: “Senachwine Creek Watershed Nonpoint Source Control Project Phase 2 – Final Report.” February 2003. Illinois River Soil Conservation Task Force.

112

BMP Implementation Summary: BMP Code 312 350 362 378 393 412 580 600 638 657

BMP Name Animal Waste Management System Sediment Basin Diversion Pond Filter Strip Grassed Waterway Streambank/Shoreline Stabilization Terrace Water & Sediment Control Structure Wetland Restoration

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 1 (no.) 45 45 90 9 (no.) 233 439 874 1 (no.) ? 51 534 12 (no.) 1,967 1,242 2,487 1 ac. 177 214 427 13 ac. 1,009 1,205 2,406 101 ft. ? ? ? 54,507 ft. 3,658.2 2,958 5,672 12,936 ft. 1,492.2 992 1,971 90 (ac.) ? ? ?

00-14(319)ST

Title: Cache River Reforestation Project – Phase 2 Purpose: This project converted environmentally sensitive croplands to forest through planting of native hardwood species. The project was targeted toward fields designated as “prior converted cropland” or “farmed wetland” with an emphasis on plantings in riparian corridors that provide streambank stability and/or connect fragmented habitats. Technical assistance was also provided for the improvement of already existing timber stands along with an information/education program. This was a continuation of an effort initiated with FFY96 Section 319 funding. The Cache River (ILIX01) is a Category 1 watershed in the Unified Watershed Assessment. Project Location:

Counties of Union, Johnson, Alexander, Pulaski, and Massac

Subgrantee: Shawnee Resource Conservation and Development Area R.R. 6, Box 255 1305 North Carbon Marion, Illinois 62959 Project Reports and Other Informational Materials: “Cache River Reforestation Project, Phase 2 – Final Report.” August 11, 2003. Shawnee Resource Conservation and Development Area. BMP Implementation Summary: BMP Code 612

BMP Name Tree Planting

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 1,525.3 ac. 9,522 10,286 20,577

00-15(319)JC

Title: Chicago Botanic Garden Lake WRAS Implementation

113

Purpose: This project installed best management practices along 5,783 linear feet of shoreline on the Chicago Botanic Garden Lagoon (ILRHJA) to arrest shoreline erosion and reduce nonpoint source pollution while protecting or enhancing habitat and aesthetic qualities. The installation of shoreline stabilization practices was consistent with the recommendations of the Chicago Botanic Garden’s “Aquatic Initiative – Lagoon Shoreline Restoration Master Plan” and “Clean Lakes Diagnostic/Feasibility Study,” which together served as a watershed restoration action strategy. Shoreline stabilization practices included sheet-pilings, stone walls, cobbles, fiber rolls, A-jacks, lunkers, native grasses and shrubs, erosion control blankets, live fascines, branch-packing, and vegetated geogrids. The project also included an education component including meetings, tours, and construction of a webpage about the project and the shoreline restoration techniques. Project Location:

Cook County

Subgrantee: Chicago Botanic Garden 1000 Lake Cook Road Glencoe, Illinois 60022 Project Reports and Other Informational Materials: “Chicago Botanic Garden Lakes Watershed Restoration Action Strategy Implementation – Final Report.” August 2006. Chicago Horticultural Society – Botanic Garden. http://www.cbgscience.org/shoreline/index.htm BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 5,783 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 56 56 111

00-16(319)AW

Title: Roof Greening Project Opening Purpose: The Peggy Notebaert Nature Museum created and exhibited a temporary display to announce and describe the Roof Greening Project to be implemented under Illinois Federal Fiscal Year 2003 Section 319 grant. The display describes, in a nontechnical manner, the proposed green roof system in terms of its design, construction, function, and benefits. The display also presents information on nonpoint source pollution from urban runoff, its impacts on the environment, and the importance of water quality protection. The Peggy Notebaert Museum also held a ceremony to 1) announce the Illinois EPA's partnership with the Peggy Notebaert Museum on the Roof Greening Project 2) recognize project participants, 3) explain the project’s purpose and the importance of nonpoint source pollution control, and 4) encourage cooperation among public and private groups for enhanced environmental awareness and protection programs.

114

Project Location:

Cook County

Subgrantee: The Peggy Notebaert Nature Museum 2430 Cannon Drive Chicago, Illinois 60614 00-17(319)BL

Title: Salt Creek Nonpoint Source Outreach & Education Purpose:

This project developed a traveling education fair to educate the public about nonpoint source (NPS) pollution and the importance of protecting water quality in the Salt Creek (ILGL09) watershed. These traveling education fairs took place in three targeted communities. A start up kit of materials and resources were compiled to provide assistance to other communities who would like to assemble and host their own education fair and creek clean up. The Salt Creek Watershed Network website located at www.saltcreekwatershed.org was updated to include easy-to use formatting, design enhancements, more basic and technical content on NPS pollution and water quality appropriate to both less informed and more skilled users, more links, more conservation action, a kid-friendly section, and easier feedback interface.

Project Location:

Cook County

Subgrantee: Salt Creek Watershed Network 8738 Washington Avenue Brookfield, Illinois 60513 00-18(319)BL

Title: Total Maximum Daily Load Development Purpose: The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within eight (8) watersheds on the 303(d) list through computer modeling. The eight (8) watersheds were also Category 1 watersheds in the Unified Watershed Assessment. Watersheds included Beaucoup Cr. (ILNC05), Casey Fork (ILNJ07), Bonnie Cr. (ILNCD01), Big Muddy R. (ILN12), Dutchman Cr. (ILADD01), Little Muddy R. (ILNE05), Little Wabash R. (ILC21), and Big Muddy R. (ILN11). For each watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. Project Location: Subgrantee: Camp, Dresser, & McKee

115

00-18(319)BY

Title: Total Maximum Daily Load Development Purpose: The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within the Fox River (ILCH01) watershed on the 303(d) list through computer modeling. The watershed was also a Category 1 watershed in the Unified Watershed Assessment. For the watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. Subgrantee: Tetra Tech EM, Inc. 200 East Randolph Drive Suite 400 Chicago, Illinois 60601 Project Reports and Other Informational Materials: 00-19(319)BY

Title: Old Salem Chautauqua Wetland Basin Project Purpose: This project created a 6.5 acre sediment basin with wetland plantings by restoring an existing breached pond that was originally build in 1926 directly adjacent to the Sangamon River (ILE24). Project Location:

Menard County

Subgrantee: Old Salem Chautauqua Homeowners Association P.O. Box 42 Petersburg, Illinois 62675 BMP Implementation Summary: BMP Code 350

BMP Name Sediment Basin

Amount 1 (no.)

00-19(319)CD

Title: Total Maximum Daily Load Development

116

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 19 1 1

Purpose: The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within the W. Br. DuPage R. (ILGBK05) watershed on the 303(d) list through computer modeling. The one (1) watershed was also a Category 1 watershed in the Unified Watershed Assessment. For the watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. Project Location: Subgrantee: CH2MHill 727 North First Street, Suite 400 St. Louis, Missouri 63102-2542 Project Reports and Other Informational Materials: 00-20(319)BY

Title: Total Maximum Daily Load Development Purpose: The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within the Charleston Side Channel Reservoir (ILRBC) watershed as identified on the 303(d) list through computer modeling. The watershed is also a Category 1 watershed in the Unified Watershed Assessment. Computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of an implementation plan for TMDL attainment. The TMDL was approved by USEPA on September 10, 2003 Project Location:

Coles County

Subgrantee: Tetra Tech, Inc. 10306 Eaton Place Suite 340 Fairfax, Virginia 22030 Project Reports and Other Informational Materials: “Charleston Side Channel Reservoir Total Maximum Daily Load Report.” August 2003. Tetra Tech Inc. 00-21(319)GE

117

FFY 2001 Federally Funded Section 319 Projects Title: Lake Branch WRAS (Nutrient Management Plan) Implementation Purpose: The Lake Branch was a Category 1 watershed in the Unified Watershed Assessment. This project began implementation of the Lake Branch WRAS (Sugar Cr./Lake Branch Watershed Pilot Project). The Lake Branch Watershed was a 303d listed water in a portion of the state which has comparatively high number of livestock operations. Sources identified in the Illinois Water Quality Report 1998 Update listed moderate to high for feedlots. Waste Utilization Plans were developed for livestock producers in the Lake Branch Watershed (ILOHA01) that were not presently required to have a Comprehensive Nutrient Management Plans (CNMPs) under the NPDES permit program. Additionally technical support was supplied to design upgraded waste handling facilities for operations in need of this service. Operations in need of upgrades were eligible for cost share for the upgrade. The overall goal of this project was to demonstrate to producers that Waste Utilization Plans should be an integral component to their livestock operation. The project also included cost-share assistance to watershed landowners through the Illinois Department of Natural Resources’ (IDNR) Conservation 2000 program to implement a variety of upland and floodplain best management practices (i.e., waterways, grade stabilization structures, vegetative filter strips). The upland and floodplain BMPs were funded through the State Conservation 2000 program administered by IDNR and used as match against Section 319 funding for Waste Utilization Plans and upgraded waste handling facilities. Project Location:

Clinton County

Subgrantee: Southwestern Illinois Resource Conservation & Development Area, Inc. 406 East Main Mascoutah, Illinois 62258 Project Reports and Other Informational Materials: “Lake Branch Watershed Restoration Action Strategy (WRAS) Implementation.” June 2005. Southwestern Illinois RC&D, Inc. BMP Implementation Summary: BMP Code 312 313 342 410 412 558 638

BMP Name Waste Management System Water Storage Structure Critical Area Planting Grade Stabilization Structure Grassed Waterway Roof Runoff Management Water & Sediment Control Basin

Amount 1 (no.) 7 (no.) 2 ac. 6 (no.) 6.1 ac. 1 (no.) 3,050 ft.

01-01(319)CD (JC)

118

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 1,002 6,807 ? 4,256 27,580 540 459 918 ? ? ? 711 191 383 ? 927 6,807 1,397.5 650 1,301

Title: Nonpoint Source Pollution Book – Phase 2 Purpose: This project developed a “Magic School Bus” style book on urban NPS pollution for 3rd through 5th grades. The Secret Agent Worm project is a comprehensive educational program that centers around the antics of two zany superspy worms— Napoleon Soil and Jane Blonde. In their first adventure, The Disappearing Earth, Napoleon and Jane tackled the priority-one nonpoint pollution problem of soil erosion. In this project, the Secret Agent Worms now turn their eyes to urban runoff. This adventure takes them deep beneath the streets in city storm sewers, where they are trying to track down the source that is contaminating a river. The Urban Runoff Teacher’s Packet includes a copy of the new book, Beneath the City of Ooze, along with Secret Agent Worm stickers, bookmarks, and a poster. Project Location:

Statewide

Subgrantee: The University of Illinois 801 South Wright Street Champaign, Illinois 61820 Project Reports and Other Informational Materials: “The Secret Agent Worms Return in … Beneath the City of Ooze.” 2003. University of Illinois. 01-02(319)BL

Title: CREP & Watershed Management Education in Illinois Purpose: This project established a partnership among Illinois EPA, Illinois Department of Natural Resources (IDNR), and University of Illinois to create two new jointly funded positions to address the information and education needs of various groups on CREP and watershed management. The primary audience was staff from agencies and organizations whose responsibilities cover conservation programs and watershed management. Both programs were used to assist individuals and basin/watershed groups in developing and implementing equitable, economically viable, resource-conserving strategies. Project Location:

Statewide

Subgrantee: The University of Illinois 801 South Wright Street Champaign, Illinois 61820 01-03(319)BL

Title: Chicagoland Environmental Network

119

Purpose: The Chicagoland Environmental Network facilitated the exchange of information and resources concerning nonpoint source pollution, water quality, and other related environmental issues. The public was provided access to information and volunteer opportunities through a computer database of environmental organizations and agencies involved in habitat restoration, wetlands, prairies, watershed projects, urban gardening, revitalization programs, energy conservation, and recycling. This project also included the construction of a Clean Water Display and rain gardens. Project Location:

Cook County

Subgrantee: Chicago Zoological Society 3300 South Golf Road Brookfield, Illinois 60513 01-04(319)BL

Title: Greater Eliza Watershed Project – Phase 2 Purpose: The purpose of this project was to protect and improve the water quality of the Greater Eliza (ILMWD01) Watershed by reducing nonpoint source pollutants. The project provided cost-share assistance to watershed landowners to implement a variety of upland and floodplain best management practices (i.e., sediment basins, ponds, grassed waterways, grade stabilization structures, water and sediment control basins). An educational program was developed to educate the public about the importance of streambank stabilization and nonpoint source pollution. This project was a continuation of an effort initiated with FFY 1998 Section 319 funding. Project Location:

Mercer County

Subgrantee: Mercer County Soil & Water Conservation District 308 Southeast 8th Avenue Aledo, Illinois 61231 Project Reports and Other Informational Materials: Greater Eliza Watershed Project Phase 2 – Final Report.” May 12, 2004. Mercer County Soil and Water Conservation District. BMP Implementation Summary: BMP Code 350 378 410 412 600 638

BMP Name Sediment Basin Pond Grade Stabilization Structure Grassed Waterway Terrace Water & Sediment Control Basin

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 3 (no.) 253 324 648 5 (no.) 1,228 962 1,924 3 (no.) 109 109 218 3.1 ac. 247 223 450 400 ft. 5 7 13 22,323 ft. 2,506 1,257 2,511

120

01-07(319)JC

Title: Fox River WRAS Implementation Project Purpose: The project included seven watershed restoration and protection projects as well as watershed-wide project coordination, technical assistance, and continued plan development. A “conservation engineer” was hired to provide technical assistance for best development and land management practices throughout the Nippersink Creek ( ILDTK04) watershed, a tributary of the Fox River. The project stabilized 415 feet of eroding streambank along Tyler Creek (ILDTZP02). Approximately 140 feet of eroding streambank along Otter Creek (ILDTF02), a tributary to Ferson Creek and the Fox River, were stabilized and structures were installed to protect the quality of an adjacent 40 acre wetland park (Otter Creek Bend Wetland). A dam located on Brewster Creek (ILDT38) at the Elgin YWCA’s Camp was removed to restore the impoundment to a meandering stream channel with a 4.9 acre wetland area and riparian buffer of native vegetation. A sediment monitoring program was implemented to demonstrate the effectiveness of the stream restoration and dam removal techniques. A biofiltration system was constructed in the center median of a parking lot in the West Main Street Park to drain and filter runoff to improve water quality by removing heavy metals and nutrients and reducing runoff volume. Stream restoration techniques (coir fiber rolls, A-jacks, lunkers, vegetated geogrids, deep rooted vegetation, and removal of non-native vegetation and undercut trees) were implemented along 5,790 feet of the Fox River and 6,060 feet of seven tributary streams. At Greater Raceway Woods, an existing outlet structure of an impoundment on an unnamed tributary of the Fox River (ILDT20) was modified and streambank and streambed stabilization was implemented along a 2,000 foot segment of the tributary. Project Location:

Counties of McHenry & Kane

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Implementation of the Fox River Watershed Management Plan – Phase 1 – Final Report.” October 2004. Northeastern Illinois Planning Commission. “Improving the Fox River Watershed.” Preserve District.

(videotape, 16 min.) 2005.

Kane County Forest

“Boone Creek Watershed Protection & Restoration Strategy – Executive Summary.” January 2004. Boone Creek Watershed Alliance. “Watershed Protection and Restoration Strategy for Boone Creek.” Northeastern Illinois Planning Commission.

121

May 23, 2003.

“Brewster Creek Dam Removal and Stream Restoration.” (videotape) 2004. Department of Environmental Management.

Kane County

“Preliminary Results of Dam Removal Analysis on Brewster Creek Near St. Charles, Illinois, 2003-2004.” October 2004. Kane County Department of Environmental Management. http://www.co.kane.il.us/kcstorm/raceway.htm http://www.co.kane.il.us/kcstorm/brewster/brewster.htm BMP Implementation Summary: BMP Code 580 657 845 910

BMP Name Streambank/Shoreline Protection Wetland Restoration Infiltration Trench Rock Outlet Protection

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 14,745 ft. 872 872 1,745 4.9 ac. ? ? ? 295 ft. 1.2 1 3 1 (no.) ? ? ?

01-08(319)SR

Title: Upper DesPlaines River WRAS Implementation Project Purpose: The DesPlaines River is a Category 1 watershed in the Unified Watershed Assessment. This project began implementation of the Watershed Restoration Action Strategy for the Upper DesPlaines River (ILG30). The project included four watershed restoration and protection projects as well as watershed-wide project coordination, technical assistance, and continued plan development. A 4.0-acre native riparian buffer was restored along Indian Creek (ILGU02), a tributary to the DesPlaines River, within the Reed-Turner Woodland Nature Preserve. Stabilization practices (coir fiber rolls, soil lifts, live staking, and a-jacks) were installed along 1,200 feet of streambank (600 feet of stream) of a tributary to Sylvan Lake (ILRGZF) in the Indian Creek sub-watershed along with the restoration of 0.33 acres of bottomland floodplain and 1.0 acre of savanna woodland. Watershed Implementation Plans were developed for the Indian Creek sub-watershed. Approximately 2.0 acres of sedge meadow were restored within a 47-acre Illinois State Nature preserve to increase stormwater storage capacity and biofiltration of runoff. Approximately 2,970 feet of eroding shoreline on East Pond were stabilized through the installation of aquatic plantings, seeding, erosion blankets, minor regrading, shrubs, retaining wall, and terracing to create littoral vegetative shelves. Project Location:

Lake County

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097

122

Project Reports and Other Informational Materials: “Indian Creek Watershed Implementation Plan.” May 21, 2003. Applied Ecological Services, Inc. “Upper Des Plaines Watershed Restoration Action Strategy Implementation - Final Report.” September 30, 2003. Northeastern Illinois Planning Commission. www.indiancreekwp.org BMP Implementation Summary: BMP Code 410 580 657 910

BMP Name Grade Stabilization Structure Streambank/Shoreline Protection Wetland Restoration Rock Outlet Structure

Amount 2 (no.) 4,170 ft. 7.3 ac. 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? 100 100 199 8 12 25 ? ? ?

01-09(319)JC

Title: Prentiss Creek Streambank Stabilization Project Purpose: Approximately 6,790 feet of eroding streambank along Prentiss Creek (ILGBLA), a tributary of the East Branch DuPage River, were stabilized utilizing bioengineering techniques (vegetated gabions, regarding, vegetation, and stone shelf). The installed practices were designed to protect streambanks and enhance water quality. The East Branch DuPage River is a Category 1 watershed in the Unified Watershed Assessment for which a TMDL and implementation plan have been completed. Project Location:

DuPage County

Subgrantee: Village of Woodridge One Plaza Drive Woodridge, Illinois 60517-4199 Project Reports and Other Informational Materials: “Prentiss Creek Streambank Stabilization Project Final Report.” July 2003. Christopher B. Burke Engineering West, Ltd. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 6,790 ft.

01-10(319)ST

123

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 256 256 512

Title: Salt Creek Streambank Stabilization – Phase 3 Purpose: This project reduced erosion and nonpoint source pollution through the stabilization of eroding streambanks along a segment of Salt Creek (approximately 1,111 feet) located in Wood Dale, Illinois. Bioengineering techniques (.e., a-jacks and vegetated geo-grids) were used. This was the third phase of a Salt Creek (ILGL03) streambank stabilization effort in the City of Wood Dale initiated in 1998 with FFY 1994 Section 319 funding and continued with FFY 2000 Section 319 funding. Salt Creek (ILGL09) is a Category 1 watershed in the Unified Watershed Assessment and is scheduled for TMDL development over the next two years. Project Location:

DuPage County

Subgrantee: City of Wood Dale 404 North Wood Dale Road Wood Dale, Illinois 60191 Project Reports and Other Informational Materials: “Salt Creek Stream Bank Stabilization Project – Phase 3 – Final Report.” January 2003. City of Wood Dale. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 1,111 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 134 113 226

01-11(319)SR

Title: Rivers Rising Video Purpose: The Illinois EPA and the John G. Shedd Aquarium developed a ½ hour video documentary on the relationships between humans and riparian ecosystems, specifically the Amazon and Mississippi Rivers. The Video examines how human land uses influence water quality as well as the volume and velocity of runoff. The video features Section 319 projects, and others, that have been implemented to mitigate adverse environmental impacts and improve water quality in the Mississippi River watershed. Project Location:

Cook County

Subgrantee: John G. Shedd Aquarium 1200 South Lake Shore Drive Chicago, Illinois 60605

124

Project Reports and Other Informational Materials: “Big Rivers Rising.” (28.5 minute video) December 2002. John G. Shedd Aquarium. 01-12(319)SR

Title: Illinois Buffer Partnership Purpose: Trees Forever and the Illinois Council on Best Management Practices (C-BMP) improved water quality by promoting riparian restoration in targeted watersheds (Blackberry Cr. (ILDTD02), Farm Cr. (ILDZZP03), & Kickapoo Cr. (ILEIE05)) within the Illinois River basin. This project promoted an integrated approach to managing riparian zones through the planting of trees, shrubs and grasses along streams; stabilizing streambanks; enhancing stream channels with natural materials; and employing constructed wetlands. The primary objectives of the project were to increase the number and quality of riparian management systems in the watersheds by: 1) coordinating training sessions for local professionals and consultants; 2) providing informational and promotional programs and activities on the importance of stream corridors and the need for riparian restoration; and 3) assisting with the establishment of demonstration projects on rural landowner properties through the coordination of riparian management design, funding, and installation assistance to landowners. Project Location:

Counties of Kane, Kendall, Tazewell, & Logan

Subgrantee: Trees Forever 770 7th Avenue Marion, Iowa 52302 Project Reports and Other Informational Materials: “Illinois Buffer Partnership – Final Report.” December 15, 2003. Trees Forever. BMP Implementation Summary: BMP Code 393 580 612 657

BMP Name Filter Strips Streambank/Shoreline Protection Tree Planting Wetland Restoration

Amount 9.3 ac. 3,300 ft. 255 ac. 35 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 228 378 748 12 11 22 816 1,030 2,055 ? 29 124

01-13(319)JC

Title: Salt Creek TMDL Implementation Plan Execution – Phase 1 Purpose:

The Illinois EPA began executing the nonpoint source pollution control recommendations of the Salt Creek Total Maximum Daily Load (TMDL) implementation plan prepared with funding under the FFY1999 Section 319

125

grant. The project stabilized 12,500 feet of eroding streambanks along Salt Creek (ILGL09) in Elk Grove Village. Also, streambank, wetland, and upper buffer restoration techniques were applied along the Middle Fork of Salt Creek located in the Village of Westchester to reduce erosion, enhance infiltration, reduce runoff volume and velocity, improve water quality, and enhance aquatic habitat. The project also stabilized 1,000 feet of eroding streambed and 750 feet of eroding streambank and establish a vegetative riparian buffer along Spring Brook Creek, a tributary of Salt Creek, located at the Spring Brook Nature Center in the Village of Itasca. A stormwater outfall discharging to Spring Brook Creek was repaired and stabilized with a small wetland established at the outfall to further control erosion and filter stormwater before discharge to the creek. Finally, a vegetated swale (bio-filter or bio-retention) and a manufactured treatment system (oil and grit separators) were constructed in Brookfield to receive and treat runoff from the municipal parking lot and the roof of the Village Hall before it discharges to Salt Creek. Project Location:

Counties of Cook & DuPage

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Salt Creek TMDL Implementation Plan Execution – Phase 1 – Final Report.” August 2005. Northeastern Illinois Planning Commission. “Salt Creek Watershed.” (map brochure) 2004. Salt Creek Watershed Network & Northeastern Illinois Planning Commission. “Salt Creek – A Resource Worth Preserving. Best Management Practices for Reducing NonPoint Source Pollution.” June, 2004. Salt Creek Watershed Network & Northeastern Illinois Planning Commission. “Salt Creek – A Resource Worth Preserving. Guide for Funding Watershed Improvements and Projects.” June, 2004. Salt Creek Watershed Network & Northeastern Illinois Planning Commission. http://www.savetheprairiesociety.org/WRPheadwater/index.html “Salt Creek Headwater Recovery Project…at Wolf Road Prairie.” (brochure) 2004 Save the Prairie Society.

126

BMP Implementation Summary: BMP Code 010 580 584 657 845 910

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 1 (no.) ? ? ? 16,850 ft. 481 449 899 1,000 ft. 28 23 47 35 (ac.) ? 22 55 240 ft. ? ? 4 1 (no.) ? ? ?

BMP Name Oil and Grit Seperator Streambank/Shoreline Protection Stream Channel Stabilization Wetland Restoration Infiltration Trench Rock Outlet Protection

01-14(319)SR

Title: Total Maximum Daily Load Development Purpose:

The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within selected watersheds on the 303(d) list through computer modeling. For each watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. Watersheds included ILDAG01 (Palmyra-Modesto, Hodges Cr., Otter, Hettick), ILOIL01 (Glen Shoals, Hillsboro Old), ILBPG09 (Vermilion, N. Fk. Vermilion R.), ILCA03 (Skillet Fk. Cr.), ILDA04 (Carlinville, Macoupin Cr. Briar Cr., Beaver Dam), ILBM02 (Paris Twin East & West, Sugar Cr.), ILDK17 (Evergreen, Mackinaw R. Six Mile Cr., Turkey Cr.), ILOKA01 (N. Fk. Kaskaskia R.), ILBEZX01 (Oakland, Walnut Point), ILODL02 Highland Silver), ILBPJ03 (Salt Fk. Vermilion R., Homer), ILD04 (Mauvaisse Terre R.), ILBO07 (Little Vermilion R.), ILC19 (Little Wabash R.).

Project Location:

Statewide

Subgrantee: Tetra Tech; Limno Tech; & Camp, Dresser, & McKee 01-15(319)BY

Title: Governor Bond Lake TMDL Implementation Plan Execution – Phase 1 Purpose:

The Illinois EPA began executing the nonpoint source pollution control recommendations of the Governor Bond Lake Total Maximum Daily Load (TMDL) implementation plan. Three rural stormwater wetlands were constructed on tributaries to Governor Bond Lake (ILROP) to improve water quality, remove suspended and soluble nonpoint source pollutants, enhance habitat and aesthetics, and improve water retention and other beneficial hydrologic functions.

Project Location:

Bond County

127

Project Reports and Other Informational Materials: “Governor Bond Lake TMDL Implementation Phase 1 Stormwater Wetland Basins #1, #2, (Kingsbury Branch) & #3 (Dry Branch) – Final Report.” December 1, 2005. Heartland Ecosystem Services, Inc. BMP Implementation Summary: BMP Code 657

BMP Name Wetland Restoration

Amount 24.54 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 5,975 1,200 1,280

01-16(319)ST

Title: Watershed Based Planning Assistance Purpose: This project updated the Illinois EPA’s draft “Guidance for Developing Watershed Implementation Plans in Illinois.” This (WIP) guidance was revised to be consistent with the USEPA watershed based plan guidance, total maximum daily load (TMDL) implementation plan requirements, and current watershed planning principles. Other revisions were made to improve the format, content, and presentation of information contained within the Illinois EPA guidance. One workshop was held in northeastern Illinois and one in central Illinois to provide technical assistance to entities interested in undertaking comprehensive watershed management initiatives in Illinois. At the workshops, information was provided to assist these entities with the development of “watershed based plans” and educate them about the updated guidance document. The workshops also addressed the various forms of nonpoint source pollution, their impacts on the environment, methods for reducing nonpoint source pollution, and the importance of water quality protection. Project Location:

Cook County

Subgrantee: Northeastern Illinois Planning Commission Suite 1800, 222 Riverside Plaza Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Guidance for Developing Watershed Action Plans in Illinois.” Metropolitan Agency for Planning.

June 2007.

Chicago

01-17(319)SR

Title: Fourth Ward Yard Nonpoint Source Pollution Control Demonstration Purpose: This project constructed a bioretention area, dry-well catch basin, and infiltration drain field to reduce and treat stormwater runoff before it is discharged to the South Branch Chicago River (ILHC01). The site will be used as a demonstration site for City of Chicago Department of Environment, Department of Transportation staff.

128

Project Location:

Cook County

Subgrantee: City of Chicago 30 N. LaSalle Chicago, Illinois 60602 Project Reports and Other Informational Materials: “Fourth Ward Project Final Report.” October 12, 2006. City of Chicago. BMP Implementation Summary: BMP Code 845 945

BMP Name Infiltration Trench Subsurface Drain

Amount 2 (no.) 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 0 7 ? 0 3

01-18(319)CD

Title: Brewster Creek Monitoring Project Purpose: This project continued the monitoring and assessment activities initiated under Financial Assistance Agreement Number 3190108 to demonstrate the effectiveness of the stream restoration and dam removal techniques implemented on Brewster Creek (ILDTZO01). Stream flow, sediment, geomorphic, and rainfall data were collected. Sediment delivery and hydraulic conveyance were monitored and evaluated so as to document water quality responses to the gradual dam removal technique. The monitoring program was designed to establish criteria on sediment delivery and hydraulic conveyance for the gradual removal of dams in northeastern Illinois. Furthermore, the project evaluated which field and laboratory methods will determine sediment compaction and stability when lake and sediment water levels are reduced by the gradual removal of the dam. The monitoring program included an assessment of sediment stability based upon existing data and newly gathered sediment data (i.e., sediment moisture and grain size). This aspect of the monitoring program was designed to evaluate the stability of the restored channel in Brewster Creek and the minimization of suspended sediment concentrations from the evolving stream channel when dams are gradually reduced. Project Location:

Kane County

Subgrantee: Kane County Department of Environmental Management 719 Batavia Avenue Geneva, Illinois 60134 Project Reports and Other Informational Materials: “Erosion Dynamics of a Stepwise Small Dam Removal, Brewster Creek Dam Near St. Charles, Illinois.” June 2007. Kane County Department of Environmental Management.

129

01-19(319)SR

Title: Lake Paradise Wetland Restoration Project Purpose: The project restored twelve (12) acres of wetlands adjacent to Lake Paradise (ILRCG) to reduce erosion and nonpoint source pollution, and improve water quality through the installation of environmentally sound practices while protecting or enhancing aquatic habitat and aesthetic qualities. This project implements recommendations of a Phase 1 Diagnostic /Feasibility Study that was completed for Lake Paradise. Project Location:

Coles County

Subgrantee: City of Mattoon 208 N. 19th Street Mattoon, Illinois 61938-2838 Project Reports and Other Informational Materials: “Lake Paradise Wetland Restoration Project – Final Report.” September 2007. GoodpasterJamison, Inc. BMP Implementation Summary: BMP Code 657

BMP Name Wetland Restoration

Amount 12 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 8 48

01-20(319)SR

Title: Brewster Creek Restoration Project Purpose: This project implemented stream restoration activities on Brewster Creek (ILDTZO01) located at the YWCA camp in Elgin, Illinois to reduce nonpoint source pollution and enhance aquatic habitat. The activities and modifications included 1) installation of a small control structure (i.e., stone riffle) to prevent excessive headcut of the channel, 2) installation of biotechnical streambank stabilization techniques along an eroding section of Brewster Creek, and 3) implementation of wetland restoration measures (clearing or herbicide application to remove nonnative or undesirable vegetation, controlled burns, re-vegetation with native wetland plugs and seed) along Brewster Creek. Project Location:

Kane County

Subgrantee: Kane County Department of Environmental Management 719 Batavia Avenue Geneva, Illinois 60134

130

Project Reports and Other Informational Materials: “Brewster Creek Restoration Project.” April 2007. Kane County Department of Environmental Management. 01-22(319)SR

Title: Silver Creek Stabilization Purpose: This project stabilized 975 feet of eroding streambanks along a segment of Silver Creek (ILGM01), a tributary of the DesPlaines River, located in Melrose Park, Illinois. Streambanks were stabilized using stone toe protection, slope re-grading, minor clearing of non-native vegetation, re-vegetation with native wetland plugs and seed, and riffles. Project Location:

Cook County

Subgrantee: Village of Melrose Park th 1000 N. 25 Avenue Melrose Park, Illinois 60160 Project Reports and Other Informational Materials: “Silver Creek Streambank Stabilization project, Phase 1, Tributary to the Des Plaines River – Section 319 Project Report.” July 2007. Living Waters Consultants, Inc. 01-23(319)SR

Title: Ralph Welch Gully Stabilization Purpose: This project stabilized a severely eroded gully located in the East Fork of the LaMoine River watershed. A 10 acre native prairie was restored at the Welch Educational Area located in McDonough County. Additionally, runoff controls were implemented on a small livestock operation in the watershed. Project Location:

McDonough County

Subgrantee: McDonough County SWCD 1607 West Jackson Street Macomb, Illinois 61455 Project Reports and Other Informational Materials: “Ralph Welch Gully Stabilization – Final Report.” September 2007. McDonough County Soil & Water Conservation District.

131

BMP Implementation Summary: BMP Code 313 410

BMP Name Waste Storage Structure Grade Stabilization Structure

Amount 1 (no.) 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 23 174 523 153 153 306

01-24(319)JC

FFY 2002 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Priority Lake & Watershed Implementation Program Purpose: Section 319 funding will be used to supplement the existing State funded (Conservation 2000) Priority Lake and Watershed Implementation Program (PLWIP). PLWIP is a reimbursement grant program designed to support lake protection, restoration, and enhancement activities at "priority" lakes where causes and sources of problems are apparent, project sites are highly accessible, project size is relatively small, and local entities are in a position to quickly implement needed treatments. Funding is provided for in-lake BMPs (i.e., shoreline stabilization, aerator/destratifier installation) and near-lake BMPs (i.e., dry dams, filter strips) that reduce nonpoint source pollution or mitigate their impacts. The first round of PLWIP projects will stabilize eroding shorelines of Glen Shoals Lake (1,000 feet at $35,000), Royal Lakes (895 feet at $44,000), Lake Carlinville (275 feet at $10,000), Kinkaid Lake (1,850 feet at $40,000), and Herrin Old Lake (200 feet at $16,000). Also, dredging ($40,000) will be done on Charlie Brown Lake and a sediment basin ($40,000) will be constructed for Veteran’s Park Lake. A second round of PLWIP projects will install a new dam and spillway at Marine Reservoir ($40,000), install rip rap at Governor Bond Lake ($27,450), dredge Drost Park Lake ($40,000), repair spillway and stabilize 300 feet of shoreline at Salem Reservoir ($40,000), and continue dredging Charley Brown Lake ($37,550). NPS Program: Hydrologic Modification & Agriculture Project Location:

Counties of Montgomery, Macoupin, Williamson, Clay, Jefferson, Madison, Bond, Marion, & McLean.

Waterbody Name (ID): Glen Shoals Lake (ILROL), Royal Lakes (ILUDZL), Lake Carlinville (ILRDG), Kinkaid Lake (ILRNC), Herrin Old Lake (ILRNZD), Charlie Brown Lake (ILRCV), Veteran’s Park Lake (ILSNC), Marine Reservoir, Governor Bond Lake, Drost Park Lake, Salem Reservoir

BMP Implementation Summary: BMP Code 350 580 007 014

BMP Name Sediment Basin Streambank/Shoreline Protection Dredging Spillway Restoration

Amount 1 (no.) 4,820 ft. 1 (no.) 1 (no.)

132

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? 163 138 275 ? ? ? ? ? ?

02-0(319)AW

Title: North Fork Embarras Watershed Project – Phase 3 Purpose: This project protected and improved the water quality of the North Fork Embarras River (ILBEF05) watershed by reducing nonpoint source pollution through a continuation of the efforts initiated with Section 319 funding under federal fiscal years 1996 and 2000. A comprehensive program of sediment and nutrient reduction was implemented that included watershed protection, information, and education efforts. Upland BMPs installed included 11 grassed waterways, 11 sediment basins, 19 water and sediment control basins, and 4 grade stabilization structures. Two streambank stabilization projects using longitudinal peak stone toe protection were installed on 250 linear feet of streambank on the main channel. Project Location:

Counties of Jasper and Clark

Subgrantee: North Fork Conservancy District Post Office Box 7, 110 East Main Casey, Illinois 62420 Project Reports and Other Informational Materials: “North Fork Embarras Watershed Project – Final Report.” Conservancy District.

September 2004.

North Fork

BMP Implementation Summary: BMP Code 350 378 410 412 580 638

BMP Name Sediment Basin Pond Grade Stabilization Structure Grassed Waterway Streambank/Shoreline Protection Water & Sediment Control Basin

Amount 6 (no.) 5 (no.) 4 (no.) 11.1 ac. 250 ft. 7,300 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 280 115 234 184 48 93 50.5 13.5 28 85 85 173 64 57 115 322 83 164

02-01(319)JC

Title: Nutrient Management Plan Implementation – Phase 2 Purpose: This project demonstrated to producers that Nutrient Management Plans should be an integral component to their farming operation. Producers were provided with an incentive payment to follow (not exceed) the nitrogen rate, timing, and application guidelines established by the University of Illinois within watersheds identified as having nitrate impaired waters. The short-term goal was to increase the number of acres managed according to nutrient management plans in the selected watersheds. The long-term goal was to maintain the number of acres managed with nutrient management plans in these watersheds after the project ends and to be able to demonstrate to other producers in the State the value of nutrient

133

management planning. This project was a continuation of the effort initiated with Section 319 funding under FFY 2000. Traditional soil erosion control practices were also implemented under this project. The project also used aerial GPS video mapping to assess stream channel conditions within selected TMDL watersheds. The assessment data was used for effective planning for the implementation of conservation practices within TMDL watersheds for water quality protection and improvement. Project Location:

Statewide

Subgrantee: Illinois Department of Agriculture State Fairgrounds, P.O. Box 19281 Springfield, Illinois 62794-9281 Project Period:

01/01/03 through 08/31/07

Project Reports and Other Informational Materials: “Nutrient Management Plan Implementation – Phase II – Final Report.” March 7, 2008. Illinois Department of Agriculture. BMP Implementation Summary: BMP Code 329 342 410 412 512 580 590 600 638

BMP Name Conservation Tillage Critical Area Planting Grade Stabilization Structure Grassed Waterway Pasture & Hayland Planting Streambank/Shoreline Protection Nutrient Management Terrace Water & Sediment Control Basin

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 295.7 (ac.) 521 677 1,353 0.75 (ac.) 80 79 156 8 (no.) 92.7 95 189 36.65 (ac.) 944.3 972.4 1,944.8 377.6 (ac.) 627.2 817 1,630 14,367 (ft.) 2,293 2,262 4,367 22,818 (ac.) 2,636 (ft.) 78.1 99 198 15,175 (ft.) 1,997.2 1,716 3,432

02-02(319)JC

Title: Livestock Winter Feed Stations Demonstrations Purpose: This project acted as a model for livestock operations throughout the state by creating “winter feed stations” that assist in the reduction of nonpoint source pollutants caused by the concentrated animal densities typically associated with winter feeding. The stations included downspouts and gutters, heavy use area protection, stacking areas, water storage/control structures, and water level drawdown/re-filling. One 30 head and two 60 head feed stations were constructed in different locations in the Sugar Creek (ILOH05) watershed and included manure storage. This practice reduced the number of locations that farmers have to occupy during wet a wet season to feed and manage their herd. The practice provided stabilized feeding areas to minimize erosion that in combination with the dry stacked waste also reduces the runoff and leaching of nutrients. The perimeter of the feed station was designed to accept this traffic through the use of geofabric and

134

gravel to handle the herd and reduce ground destruction and material loss. The design, construction, and benefits of the stations were documented in a final report and an educational booklet. Project Location:

Counties of Madison & Clinton

Subgrantee: Southwestern Illinois Resource Conservation & Development Area 406 East Main Mascoutah, Illinois 62258 Project Reports and Other Informational Materials: “Livestock Winter Feed Stations – A Feed and Waste Management Structure Designed to Improve Water Quality.” 2004. Southwestern Illinois Resource Conservation & Development Area. BMP Implementation Summary: BMP Code 570 600

BMP Name Runoff Management System Terrace

Amount 3 (no.) 900 Ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 74 534 28 28 56

02-03(319)CD

Title: Green Roof System to Reduce Urban Runoff Purpose: This project addressed urban runoff nonpoint source impacts to Salt Creek (ILGL09) and demonstrated innovative, infiltration based stormwater management approaches for highly impervious areas. A “green roof” system was designed and constructed on the Conservation Design Forum’s office building to reduce runoff and pollutant loading and serve as a prototypical green roof to educate local communities and businesses about this management practice. A green roof was constructed on each of the three separate roofs on the CDF building and incorporated distinctly different designs (i.e., different thickness, growing media size, vegetation. etc.). Measurement equipment was installed to quantify reductions in runoff volume. The project also included an educational component involving tours and brochures. Salt Creek is a Category 1 watershed in the Unified Watershed Assessment and a TMDL and implementation plan is near completion. Project Location:

DuPage County

Subgrantee: Conservation Design Forum 375 West First Street Elmhurst, Illinois 60126 Project Reports and Other Informational Materials: “A Green Roof Comparison Project: by Conservation Design Forum: Green Roof System to Reduce Urban Runoff – Final Report.” January 2005. Conservation Design Forum. 135

BMP Implementation Summary: BMP Code 011

BMP Name Green Roof System

Amount 0.16 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? 1

02-04(319)ST

Title: NPS Program Implementation Assistance Purpose: The Association of Illinois Soil and Water Conservation Districts (AISWCD) dedicated one full time staff equivalent to act as a liaison between the AISWCD and the Illinois EPA and assist the Illinois EPA in implementing Illinois’ Nonpoint Source Management Program. The liaison provided educational, informational and technical assistance to Soil and Water Conservation Districts (SWCDs), agricultural producers and other interested parties to help them better understand programs implemented under Sections 319(h), 305(b) and 303(d) of the Clean Water Act. The liaison encouraged SWCDs and producers to participate in watershed planning and nutrient management planning where appropriate. Three watershed planning processes were started (or continued) during the first year of this contract and four the second year. The liaison acted as a coordinating mechanism for the delivery of federal/state water quality related programs (i.e. EQIP, CPP, SSRP, CREP, 319 and ICLP). The liaison advertised programs, gave talks, met with landowners and acted as a tool to spread the word about how each of these programs can benefit water quality. The liaison acted as an overall facilitator for water quality coordination between SWCDs, Illinois EPA and other state/federal agencies. Project Location:

Statewide

Subgrantee: Association of Illinois Soil & Water Conservation Districts 2520 Main Street Springfield, Illinois 62702 Project Reports and Other Informational Materials: “Nonpoint Source Program Implementation Assistance Final Report.” April 2006. Association of Illinois Soil and Water Conservation Districts 02-05(319)CD

Title: Northern Illinois Community Assistance Office Purpose: This project provided training to Natural Resource Conservation Service regional staff on water quality regulations and technical issues. Furthermore, the project encouraged the provision of nonpoint source pollution control related technical assistance to appropriate local agencies and organizations in northeastern Illinois. The Natural Resources Conservation Service’s Northeastern Illinois Community Assistance Office was established to serve the six county northeastern Illinois area.

136

This office provided technical assistance to soil and water conservation districts, planning commissions, county departments, townships and municipalities in northeastern Illinois. In addition to direct technical assistance, the staff of this office provided information/education and training assistance. The major focus of the office was on erosion/sediment control, water quality, and natural resource management. Project Location:

Counties of Lake, McHenry, Kane, DuPage, Cook, and Will

Subgrantee: USDA Natural Resources Conservation Service 603 East Diehl Road, Suite 131 Naperville, Illinois 60563-1476 02-06(319)SR

Title: Conservation Reserve Enhancement Program (CREP) Assistance Purpose: The Association of Illinois Soil & Water Conservation District (AISWCD) subcontracted with eleven (11) SWCDs to hire staff to facilitate the enrollment process of the Conservation reserve Enhancement Program (CREP) by setting appointments with producers to discuss CREP and conduct field visits to determine program eligibility. The SWCDs completed the Conservation Reserve Program - 2 form, type the Conservation Plan of Operations, obtained the necessary producer signatures on required documents, and completed all state CREP enrollment forms. The SWCDs coordinated activities associated with land surveys, producer signatures on easements, and recording easements with the local abstract office. Field assistance was provided to the survey and design teams as well as construction assistance by evaluating the construction expenses and completing form AD-862. Project Location:

Counties of Cass, Schuyler, McDonough, Hancock, Peoria, Tazewell, Fulton, Knox, Bureau, Marshall, Putnam, Sangamon, Menard, Christian, Shelby, Montgomery, Grundy, LaSalle, Kankakee, Iroquois, Morgan, Scott, and Greene, & Macoupin

Subgrantee: Association of Illinois Soil & Water Conservation Districts 2520 Main Street Springfield, Illinois 62702 02-07(319)BL (JC)

Title: Lake Galena Watershed Project Purpose: This project reduced nonpoint source (NPS) pollution delivered to Lake Galena (ILRMM) through the installation of best management practices (BMPs) adjacent to the lake and within the watershed. BMPs were used to stabilize approximately 2,250 feet of eroding shoreline along Lake Galena and establish, where possible, a buffer of native vegetation along the shoreline to reduce erosion, filter runoff, and

137

enhance aquatic habitat. The project also involved the installation of approximately 1,140 feet of BMPs (i.e., rip-rap, jetties, minor stream regarding, fiber roll, vegetative stabilization) on Smallpox and Noname Creeks to stabilize eroded streambanks. Approximately 4,480 feet of BMPs (i.e., drainage way reshaping, grade stabilization, riprap, vegetative stabilization) were also installed to stabilize eroding drainage ditch banks. Project Location:

JoDaviess County

Subgrantee: Galena Territory Association 2000 Territory Drive Galena, Illinois 61036 Project Reports and Other Informational Materials: Lake Galena Watershed Project – Final Report.” April 2004. Galena Territory Association. BMP Implementation Summary: BMP Code 580 581

BMP Name Streambank/Shoreline Protection Ditch Stabilization

Amount 3,390 ft. 4,480 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 634 633 1,266 159 163 320

02-08(319)ST

Title: Morton Arboretum Parking Lot Runoff Control Purpose: The Morton Arboretum enlarged their main parking lot, which lies adjacent to and between Meadow Lake (ILWGA) and the East Branch of the DuPage River (ILGBL10). The Arboretum installed best management practices (BMPs), which will reduce the amount of nonpoint source pollution to both waterbodies. The parking lot included bioswales, pervious materials, a gravel drainage layer, and a level spreader. The Project also included interpretive signs (Arboretum estimates 750,000 visitors annually), and pre- and post-workshops designed for city managers, developers, engineers, watershed planners and managers. The TMDL and implementation plan for the East Branch DuPage River is complete. Project Location:

DuPage County

Subgrantee: The Morton Arboretum 4100 Illinois Route 53 Lisle, Illinois 60532-1293 Project Reports and Other Informational Materials: “The Morton Arboretum Main Parking Lot Runoff Control Project Final Report. January 2006. Christopher B. Burke Engineering West, Ltd.

138

BMP Implementation Summary: BMP Code 800 835 870 890 910

BMP Name Urban Stormwater Wetland Urban Filter Strip Level Spreader Porous Pavement Rock Outlet Protection

Amount 1 (no.) 1.0 ac. 1 (no.) 4.13 ac. 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 11 33 ? 3 10 ? 9 ? ? 13 130 ? ? ?

02-09(319)CD

Title: North Branch Chicago River Watershed Project Purpose: Project partners implemented a variety of best management practices (BMPs) within the watershed. The types of BMPs (green roof, streambank stabilization, wetland restoration, detention basin retrofit, stormwater wetlands, bioswales, porous pavement) were identified in the North Branch Chicago River (ILHCC08) Watershed Management Plan. In addition, the project partners continued to implement an outreach program for adults and children focusing on nonpoint source pollution control and water quality. The applicant investigated and documented the need for changes to local administrative policy, procedure and regulations to meet the plan’s goals and objectives. Project Location:

Counties of Cook and Lake

Project Reports and Other Informational Materials: “North Branch Watershed Project Implementation – Phase 3 Final Report.” July 15, 2007. Friends of the Chicago River. BMP Implementation Summary: BMP Code 010 011 580 657 666 800 835 890

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 1 (no.) ? 0 3 0.1 ac. ? ? ? 10,500 ft. 1089 1072 2144 4.88 ac. 43 48 120 37 ac. ? ? ? 4 (no.) ? 221 947 0.1 ac. ? 7 15 0.33 ac. ? 5 53

BMP Name Oil & Grit Seperator Green Roof Streambank/Shoreline Protection Wetland Restoration Woodland Improvement Urban Stormwater Wetland Urban Filter Strip Porous Pavement

02-10(319)CD

Title: Addison Creek Streambank Stabilization Purpose:

This project reduced erosion and nonpoint source pollution through the stabilization of approximately 3,750 feet of eroding streambanks along a 2,063 foot segment of Addison Creek (ILGLA02) located in Northlake, Illinois.

139

Bioengineering techniques (i.e., re-grading, A-jacks with vegetation, vegetation with Stabilator toe, rip rap, and vegetated gabion baskets) were used. Addison Creek is a tributary of Salt Creek. Salt Creek is a Category 1 watershed in the Unified Watershed Assessment and is included on Illinois 303d list. The TMDL and implementation plan for Salt Creek is nearly complete. Project Location:

Cook County

Subgrantee: Addison Creek Conservancy District P.O. Box 2381 Northlake, Illinois 60164 Project Reports and Other Informational Materials: “Addison Creek Streambank Stabilization Project – Final Report.” Christopher B. Burke Engineering, Ltd.

November 2004.

BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 3,750 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 298 252 504

02-11(319)SR

Title: Otter Lake In-Lake Sediment Control Project Purpose:

Section 319 funding was used to design and construct a low water sedimentation control structure in the north end of Otter Lake (ILRDF). This structure provided a controlled sediment basin, controlling sediment and associated pollutants entering from the West Fork of Otter Creek. The project also stabilized 5,000 feet of eroding shoreline through barge applied rip rap. Otter Lake is on Illinois’ Section 303(d) list. Although TMDL development has not yet been scheduled, a watershed-based plan (Phase 1 DiagnosticFeasibility Study) has been developed which identifies the pollutants causing water quality impairments and describes best management practices (BMPs) to be implemented to solve water quality problems.

Project Location:

Macoupin County

Subgrantee: Otter Lake Water Commission 6475 West Montgomery Road P.O. Box 468 Virden, Illinois 62690 Project Reports and Other Informational Materials: “Otter Lake In-Lake Sedimentation Control Project.” Commission.

140

June 1, 2007.

Otter Lake Water

BMP Implementation Summary: BMP Code 580 350

BMP Name Streambank/Shoreline Protection Sediment Basin

Amount 5,000 ft. 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 391 391 781 6,349 61 122

02-12(319)CD

Title: E. Br. DuPage R. Trib. No. 6 Stream Restoration Purpose:

Approximately 1,379 feet of eroding streambank along an unnamed stream, tributary number 6 of the East Branch DuPage River (ILGBL10), was stabilized by restoring a more natural floodplain terrace (removal of non-native and invasive shrubs and trees, selective bank excavation, re-vegetation with native herbaceous plant species) and bioengineering techniques (re-grading, vegetation, erosion control blanket, coir fiber roll, A-jacks, riffles). The installed practices were designed to protect streambanks and enhance water quality. The East Branch DuPage River is a Category 1 watershed in the Unified Watershed Assessment and is included on Illinois 303d list. The TMDL and implementation plan for the East Branch DuPage River are complete.

Project Location:

DuPage County

Subgrantee: Hobson Creek Community Council 23W420 Country Court Naperville, Illinois 60540 Project Reports and Other Informational Materials: “Hobson Creek Corridor Restoration Project, Phase 1 Tributary 6 to the East Branch DuPage River – Section 319 Project Report.” December 2004. Ted Gray & Associates, Inc. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 1,379 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 120 120 239

02-13(319)ST

Title: Vandalia Lake WQ Information & Education Purpose: A total of six watershed newsletters were developed and published over the course of the Agreement Period and mailed to all the farmers in the Vandalia Lake (ILROD) watershed, the Vandalia Lake residents, and the residents of the City of Vandalia, various local libraries, school libraries and the Illinois EPA. A Geographic Information System (GIS) study was conducted and GIS overlays developed of the

141

Watershed, depicting land use, soils (including location of all sodium soils), topography, and erosion potential. The Fayette County Soil & Water Conservation District planned, coordinated, and held a Lake Awareness day for all the fifth and sixth graders in the Vandalia School District. The event educated the youth on the importance of improving water quality and reducing non-point source pollution in the Watershed. A Nutrient Management Workshop (Workshop) was also organized and held for the landowners in the watershed. Project Location:

Fayette County

Subgrantee: Fayette County Soil & Water Conservation District 301 South Third Street Vandalia, Illinois 62471 02-14(319)BL

Title: Ravinia Neighbors Association Sewer Stencil Purpose: The Ravinia Neighbors Association coordinated a storm drain stencil project to educate the citizens of Highland Park, Illinois about urban nonpoint pollution and how to reduce urban nonpoint source pollution within this community. A stenciling event was held on the five Saturdays during the month of May in 2003 and 2004. A Storm Drain Data Card was created and filled out for all storm drains that were stenciled. The data cards included a description of the area that surrounds the storm drain to be stenciled and identified all the possible nonpoint source pollutants within six feet of each side of the storm drains. Project Location:

Lake County

Subgrantee: Ravinia Neighbors Association P.O. Box 804 Highland Park, Illinois 60035 02-15(319)BL

Title: Secret Agent Worm Website Purpose: This project developed and placed on-line (linked to Illinois EPA’s website) an interactive website based on the “Secret Agent Worms” book series to help children understand nonpoint source pollution, its causes, sources, and solutions. Project Location:

Statewide

Subgrantee: The University of Illinois 801 South Wright Street Champaign, Illinois 61820 02-16(319)BL

142

Title: Rainfall Simulator/Crop Residue Demonstration Purpose: The Embarras River Management Association purchased six Rainfall Simulator/Crop Residue Demonstration Units (Simulator) and trailers. The Simulators and trailers were supplied to six county Soil and Water Conservation Districts (SWCDs) that shared the Simulators’ use and ownership with six other SWCDs all in the Embarras River Watershed. These Simulators were used by the Natural Resource Conservation Service and Soil and Water Conservation District personnel at conservation education field days and tours to demonstrate the value of crop residues in reducing soil erosion and nutrient leaching. Project Location: Counties of Champaign, Vermillion, Douglas, Edgar, Coles, Cumberland, Clark, Jasper, Crawford, Richland, and Lawrence. Subgrantee: Embarras River Management Association P.O. Box 278 Toledo, Illinois 62468 Project Reports and Other Informational Materials: “Rainfall Simulator Unit Instruction Manual.” 2004. Embarras River Management Association. “Rainfall Simulator Presentations 2003 – 2004.” Association.

2004.

Embarras River Management

“Rainfall Simulator Units Project Final Report.” Management Association.

October 18, 2004.

Embarras River

02-17(319)BL

Title: Big Rivers Rising Purpose: The John G. Shedd Aquarium duplicated 700 copies of the videotape production “Big Rivers Rising” developed under Financial Assistance Agreement Number 3190112 between the Illinois EPA and the John G. Shedd Aquarium. The Recipient distributed these videotape copies in accordance with the Promotion and Distribution Plan (Plan) developed under Financial Assistance Agreement Number 3190112 between the Illinois EPA and the John G. Shedd Aquarium. Project Location:

Statewide

Subgrantee: John G. Shedd Aquarium 1200 South Lake Shore Drive Chicago, Illinois 60605 02-18(319)SR

143

Title: Manure Management Workbook Purpose: This project revised, edited and standardized existing Microsoft Word/Excel files into a workbook format, printed 1,000 copes of the workbook, and produced a CD version of the workbook. Three workshops were held to educate individuals on how to best use the Manure Management Workbook.

Project Location: Statewide Subgrantee: Board of Trustee of University of Illinois 109 Coble Hall, 801 South Wright Street Champaign, Illinois 61820

Project Reports and Other Informational Materials: 02-19(319)BL

Title: Tazewell County SWCD - Talbott Streambank Stabilization Purpose: This project stabilized 650 feet of eroding streambanks on Horseshoe Creek, a tributary of the Mackinaw River, to reduce erosion in order to improve water quality and reduce nonpoint source pollution. Project Location:

Tazewell County

Subgrantee: Tazewell County Soil & Water Conservation District 2934 Court Street Pekin, Illinois 61554 Project Reports and Other Informational Materials: “Illinois EPA Section 319 Small Project Final Report – Tazewell County SWCD- Talbott Streambank Stabilization Project.” June 12, 2006. Tazewell County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 640 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 159 136 270

02-20(319)CD

Title: Long Lake Shoreline Stabilization Purpose:

The project stabilized 475 feet of severely eroding shoreline on a section of Long Lake (ILRTJ) located in Lake County, Illinois. The project arrested

144

shoreline erosion and reduced nonpoint source pollution through the installation of environmentally sound practices (i.e., excavation and re-grading, permanent turf reinforcement matting, rock toe protection, native vegetation planting) while protecting or enhancing habitat and aesthetic qualities. Three educational signs were also installed at the project site, which describe, in a non-technical manner, the shoreline stabilization in terms of its design, construction, function, cost, and benefits. Project Location:

Lake County

Subgrantee: Northeastern Illinois Planning Commission 233 South Wacker Drive, Suite 800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Long Lake Shoreline Stabilization Project.” February 2008. Chicago Metropolitan Agency for Planning. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 475 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 144 144 287

02-22(319)SR

Title: Kickapoo Creek Monitoring Project Purpose: This project provided support and coordination for the Kickapoo Creek Monitoring Project. Fecal Coliform bacteria sampling and analysis were conducted. Surface water monitoring of Kickapoo Creek were conducted along with the collection of stream flow data and fish and invertebrate sampling. Project Location:

McLean County

Subgrantee: City of Bloomington 109 East Olive Street Bloomington, Illinois 61701-5219 02-23(319)JC

Title: Web-Based Illinois Manure Management Planner Purpose: This project helped fund the creation of a web-based Illinois Manure Management Planner (IMMP). This IMMP will streamline the task of developing a manure management plan for the producer. Important features of the IMMP include

145

electronic transfer capability of required reports to agencies, recordkeeping, and email reminders of user-defined dates for inspections. Project Location:

Statewide

Subgrantee: The Board of Trustees of the University of Illinois 1901 South First Street, Suite A Champaign, Illinois 61820 02-24(319)JC

Title: Total Maximum Daily Load Development Purpose: The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within selected watersheds on the 303(d) list through computer modeling. For each watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. 02-(319)BY

FFY 2003 FEDERALLY FUNDED SECTION 319 PROJECTS

Title: Lake Arlann Silt Abatement Project Purpose: This project retrofitted an existing 25 year of sediment basin, stabilized 1,700 feet of eroding ravines by using check dams, rip rap, and vegetation. The project also included dredging 483,455 cubic yards of silt from the lake. The cost of dredging ($2,494,428) was paid entirely with local funding and used only as match under the project. Project Location:

Tazewell County

Subgrantee: Lake Arlann Drainage District 2009 Alameda Ct. Pekin, Illinois 61554 BMP Implementation Summary: BMP Code 007 350 580

BMP Name Dredging Sediment Basin Streambank/Shoreline Protection

Amount 1 (no.) 1 (no.) 1,700 ft.

03-01(319)BL (JC)

146

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? 40.6 119 774 122 122 245

Title: Evaluation of N Management Practices Purpose: A field scale experiment was established to evaluate the impact of best management practices (BMPs) on the potential for N loss from tile lines and the economic production of corn. A total of 54 tile lines (27 in each of 2 fields) were instrumented to allow for collection of tile flow volume and to allow for collection of flow regulated composite samples collected on a weekly bases for nitrate-N analysis. The selected fields were in a corn-soybean rotation, with one in corn each year and the other in soybean. A total of 9 treatments, in a randomized complete block design with 3 replications were applied when the field was in corn. The treatments consisted of 5 fall applications –0, 78, 157, and 235 lb N/acre as anhydrous ammonia, 157 lb N/acre as anhydrous ammonia with N-Serve, 3 spring pre-plant applications-78, 157, and 235 lb N/acre as anhydrous ammonia, and 1 side-dress treatment, 157 lb N/acre as anhydrous ammonia. Corn grain yield and total N uptake were collected from each individual treatment. Soil samples were collected from all 54 plots in 30 cm increments to a 120 cm depth in the fall after harvest and analyzed for nitrate-N. Soil samples were collected from each plot area to a depth of 30 cm for Illinois N Soil Test analysis. Data collected in this study was used to prepare educational materials, including power point presentations, fact sheets, and an article for the Illinois Corn and Soybean Classics publication. Project Location: Subgrantee: University of Illinois Urbana – Champaign 1102 S. Goodwin Avenue Urbana, Illinois 61801 Project Reports and Other Informational Materials: “Evaluation of N Management Practices on the Environmental Fate of N and Corn Yield.” May 12, 2006. University of Illinois. 03-02(319)ST (JC)

Title: Conservation Practices Mapping and Assessment Purpose: This project expanded the conservation mapping system of the Illinois Department of Natural Resources (IDNR) to include best management practices implemented with funding under Section 319 of the Clean Water Act. The previous system maps only CRP, CREP, WHIP, and EQIP. This project mapped conservation activities occurring within Prairie Rivers RC&D and estimated environmental impacts. The Recipient 1) reviewed and modified the Illinois Conservation Practices Tracking System (ICPTS) to allow the addition of 319 projects, BMPs, and related characteristics; 2) developed an on-line, interactive web tool that allows staff to identify locations of existing 319 projects, digitize their locations, enter relevant ID’s and other information; 3) entered 319 projects and conservation practices into the modified ICPTS using the on-line web tool and trained local staff in its use; and 4)

147

modified Illinois EPA’s existing sediment and load reduction estimation process to fit the data being entered into ICPTS. Project Location:

Counties of Bureau, LaSalle, Livingston, Marshall, Putnam, Peoria, Stark, Tazewell, and Woodford.

Subgrantee: Prairie Rivers RC&D 400 Edwards Street Henry, Illinois 61537 Project Reports and Other Informational Materials: “Conservation Practices Mapping and Assessment Project – Final Report.” August 15, 2005. Prairie Rivers Resource Conservation & Development. 03-03(319)CD

Title: Watershed Planning in Northeastern Illinois Purpose: The Northeastern Illinois Planning Commission (NIPC) provided coordination and technical assistance to entities (local governments, soil and water conservation districts, planning committees, businesses, volunteer organizations, etc.) undertaking comprehensive watershed management initiatives in northeastern Illinois. NIPC assisted these entities with the development of “watershed based plans” and Watershed Implementation Plans (WIPs), as defined by the Illinois EPA. Priority was given to those watersheds that contain nonpoint source pollution control projects funded by the Illinois EPA and those within Clean Water Act 303(d) listed waters as identified by the Illinois EPA. NIPC assisted these entities in the compilation and evaluation of resource inventory data, formulation of water quality objectives, selection and implementation of nonpoint source pollution control practices, dissemination of information/education materials for water quality protection, and evaluating program success. Project Location:

Counties of Cook, Lake, McHenry, DuPage, Will, and Kane

Subgrantee: Northeastern Illinois Planning Commission Suite 1800, 222 South Riverside Plaza Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Thorn Creek Watershed Based Plan.” Commission.

December 2005.

03-04(319)SR

Title: Northeastern Illinois Stream Restoration Inventory

148

Northeastern Illinois Planning

Purpose: The Northeastern Illinois Planning Commission (NIPC), in cooperation with Chicago Wilderness, created a set of recommended practices for stream restoration in northeastern Illinois and publicized these recommendations through training workshops for regulators, consultants, and municipalities, and through the production of an educational DVD about how to use stream restoration practices to enhance biodiversity in the region. The first phase involved conducting a survey of firms, agencies, and groups that have been involved in stream restoration in order to understand what techniques have been used, where they have been used, their applicability under different conditions, and their costs. The following restoration practices of interest included: streambank stabilization, riparian buffer restoration, in-stream restoration, channel re-meandering, and dam modification and removal. Project Location:

Counties of Cook, Lake, McHenry, DuPage, Will, and Kane

Subgrantee: Northeastern Illinois Planning Commission Suite 1800, 222 South Riverside Plaza Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Analysis of Northeastern Illinois Stream Restoration Projects.” (DVD) October 2004. U.S. Geologic Survey. “Stream Restoration Inventory Final Report.” Commission.

April 2005.

Northeastern Illinois Planning

03-05(319)SR

Title: Mitchell Park Ravine Watershed Project – Phase 2 Purpose: This project focused on soil erosion control and water quality in an urban watershed tributary to the Mississippi River (ILM03). Soil erosion control was improved in six areas within the Mitchell Park ravine watershed. Water quality improvements in these areas were determined to be a high priority by the East Moline Stormwater Committee. This project utilized proven soil erosion and sediment control and stormwater management techniques as planned in consultation with USDA-NRCS. Practices include culvert extensions, cover and re-vegetation, streambank regrading, installation of a drop structure, and placement of rip rap. This project was a continuation of a project initiated with funding under Illinois FFY 1998 Section 319 grant. Project Location:

Rock Island County

Subgrantee: City of East Moline 912 – 16th Avenue East Moline, Illinois 61244

149

Project Reports and Other Informational Materials: “Final Report for City of East Moline Mitchell Park Ravine Watershed Project.” September 2006. Landmark Engineering Group, Inc. BMP Implementation Summary: BMP Code 410 580 910

BMP Name Grade Stabilization Streambank/Shoreline Protection Rock Outlet Protection

Amount 1 (no.) 52 ft. 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 695 695 1,391 26 26 55 135 135 271

03-06(319)ST

Title: Roof Greening Project Purpose: This project addressed urban runoff nonpoint source impacts to Lincoln Park North Pond (ILQZK) and demonstrated innovative, infiltration based stormwater management approaches for highly impervious areas. Green roof systems were designed and constructed on The Peggy Notebaert Nature Museum’s roofs to reduce runoff and associated nonpoint source pollutants; improve water quality, habitat quality, and the quality of recreational opportunities; and provide educational opportunities. The project absorbed and filtered rainfall, thereby decreasing nonpoint source pollution to the North Pond while demonstrating how green roofs can be adapted to existing buildings and explaining their benefits to encourage widespread application in other areas. Interpretive signage and exhibit components were installed to educate visitors about nonpoint source pollution, its effect on water quality, and the environmental benefits and cost-effectiveness of rooftop gardens. A computer kiosk allows visitors to gather data about the green roofs, including temperature, wind, and rainfall. Visitors are able to compare data to conventional roofs. Visitors are able to create their own green roof using the computer and see results in efficiency, environmental impact, and aesthetics. Information on this computer can also be accessed over the Web. A 360-degree web camera was installed to allow visitors to take a virtual/remote tour of the green roof. The camera tour highlights the variety of plants, data collecting instruments, and environmental benefits. Interpretive labels including pictorial information reference roof views, explain the process of creating rooftop gardens, and illustrate environmental benefits, including nonpoint source pollution control. A software presentation was also developed to document the installation process and explain the technical aspects of installation, nonpoint source benefits, and other cost-benefit considerations. Project Location:

Cook County

Subgrantee: The Peggy Notebaert Nature Museum 2430 Cannon Drive Chicago, Illinois 60614

150

Project Reports and Other Informational Materials: http://www.naturemuseum.org/greenroof/index.html http://www.naturemuseum.org/greenroof/datastream.html http://www.naturemuseum.org/greenroof/build.html http://www.naturemuseum.org/greenroof/strata.html BMP Implementation Summary: BMP Code 011 342

BMP Name Green Roof System Critical Area Planting

Amount 0.34 ac. 0.21 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? 1 ? ? ?

03-08(319)SR

Title: Muddy Waters Pond Restoration Purpose: This project included 1,240 feet of shoreline stabilization along with wetland and upper prairie restoration around an in-stream detention basin on St. Joseph’s Creek, a tributary of the East Branch DuPage River. The Village of Westmont and the Westmont Park District restored and naturalized the pond at Muddy Waters Park. Native plants, natural materials and a man-made wetland zone stabilized the banks and improved water quality and aided in the reduction of eutrophic conditions that occur in the pond each summer. Public outreach and education activities were also implemented. East Branch DuPage River is included on Illinois 303d list. The TMDL and implementation plan for the East Branch DuPage River are nearly complete. Project Location:

DuPage County

Subgrantee: Village of Westmont 31 West Quincy Westmont, Illinois 60559 Project Reports and Other Informational Materials: “Final Report for Muddy Waters Pond Restoration Project.” June 2006. Conservation Design Forum BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 1,240 ft.

03-09(319)ST

151

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 86 86 173

Title: Villa Park Urban BMP Demonstration Purpose: This project reduced nonpoint source pollution from a new police station constructed on the site of an existing parking lot in downtown Villa Park, Illinois. A 3,410 square foot green roof system was constructed on top of the new police station. The project also included construction of a parking lot and plaza that uses a system of pervious pavement (8,057 square feet) and biofiltration swales and underground storage (7,176 square feet) to treat and infiltrate runoff from the site. Precipitation and runoff leaving the site was measured during the project period and a hydrologic model was constructed to estimate the long term runoff reduction from the site relative to more conventional stormwater systems. The project also included tours and a brochure. Salt Creek (ILGL09) was a Category 1 watershed in the Unified Watershed Assessment and is included on Illinois 303d list. The TMDL and implementation plan for Salt Creek is nearly complete. Project Location:

DuPage County

Subgrantee: Village of Villa Park 20 S. Ardmore Avenue Villa Park, Illinois 60181 Project Reports and Other Informational Materials: “Villa Park Police Station Urban BMP Demonstration Project – A Project to Demonstrate Integration of Green Roof, Permeable Paving, and Bioswale Urban Runoff Systems.” July 19, 2005. Village of Villa Park. BMP Implementation Summary: BMP Code 011 835 890

BMP Name Green Roof System Urban Filter Strip Porous Pavement

Amount 0.08 ac. 0.17 ac. 0.19 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? ? ? ? ? ? 2

03-10(319)SR

Title: Springbrook Creek Stream Meandering Purpose: This project recreated two miles of meandering stream channel combined with wetland and floodplain restoration along a segment of Springbrook Creek (ILGB11) located in the Springbrook Prairie Forest Preserve in DuPage County. The project created a meandering stream channel that is connected with the historic floodplain that will serve to absorb large volumes of water and dissipate energy in large storm events. The project reduced the erosive force of water in the stream, stabilized streambanks, and enhanced riparian habitat. Springbrook Creek is a tributary of the DuPage River.

152

Project Location:

DuPage County

Subgrantee: Forest Preserve District of DuPage County 3 S. 580 Naperville Road Wheaton, Illinois 60187-8761 Project Reports and Other Informational Materials: “Springbrook Creek Stream Meander Project – Final Report.” June 30, 2008. Forest Preserve District of DuPage County. BMP Implementation Summary: BMP Code 009

BMP Name Stream Channel Restoration

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 10,990 ft. 3,237 1,619 1,619

03-11(319)CD

Title: Governor Bond Lake Stormwater Basin No. 4 Purpose: This project continued executing the nonpoint source pollution control recommendations of the Governor Bond Lake Total Maximum Daily Load (TMDL) implementation plan. Under this project, a rural stormwater wetland was constructed on Dry Branch, a tributary to Governor Bond Lake (ILRDP), to improve water quality, remove suspended and soluble nonpoint source pollutants, enhance habitat and aesthetics, and improve water retention and other beneficial hydrologic functions. This basin also provides access near a paved road to facilitate visitation from members of the public, and was constructed and operated in such a manner as to allow for development of a public education program. In particular, this facility contains all the standard components seen in the other basins such as a forebay, control structure which mimics a natural hydroperiod in the forebay’s littoral zone, a receiving wetland/marsh with meanders and interspersed terrestrial and aquatic zones to remove nutrients and coincidently create high quality habitat. In addition, the paved road access was further enhanced by addition of a boardwalk and observation deck constructed to allow viewing of all pertinent features. Project Location:

Bond County

Subgrantee: City of Greenville 404 South 3rd Street Greenville, Illinois 62246 Project Reports and Other Informational Materials: “Governor Bond Lake TMDL Implementation Stormwater Wetland Basin #4 (Dray Branch) – Final Report.” December 1, 2005. Heartland Ecosystem Services, Inc.

153

BMP Implementation Summary: BMP Code 657

BMP Name Wetland Restoration

Amount 1.85 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 679 ? ?

03-12(319)ST

Title: Fox Point North – Flint Creek Streambank Stabilization Purpose: This project stabilized 2,600 feet of eroding streambanks along an 1,300 foot segment of Flint Creek (ILDTZS01), a tributary to Lake Louise & Fox River, through the clearing on non-native vegetation, minor re-grading, and installation of native plant communities, boulders, J-hooks, cross vanes, crib wall, and other bioengineering techniques. The Fox River is included on Illinois’ 303(d) list. The “Flint Creek Drainage Basin Needs Assessment Report” and “Flint Creek Watershed Action Plan” were completed in 1993 and 1994, respectively. Flint Creek is also part of the 1997 “Integrated Management Plan for the Fox River Watershed in Illinois.” Project Location:

Lake County

Subgrantee:

Village of Barrington 200 South Hough Street Barrington, Illinois 60010

Project Reports and Other Informational Materials: “Fox Point North Subdivision – Flint Creek Restoration Project.” March 11, 2005. Applied Ecological Services, Inc. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 2,600 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 124 124 250

03-13(319)SR

Title: Lake Springfield Watershed BMP Implementation Purpose:

By assisting USDA Natural Resources Conservation Service’s Conservation Reserve Program, this project resulted in the installation of 599.8 acres of new filter strips along feeder streams within the Lake Springfield (ILREF) watershed by providing an additional $200/ac. one-time incentive payment to landowners for the fifteen-year commitment.

Project Location:

Sangamon County

154

Subgrantee: Sangamon County Soil & Water Conservation District 40 Adloff Lane, Suite 7 Springfield, Illinois 62703-4441 Project Reports and Other Informational Materials: “Lake Springfield Watershed Best Management Practice Implementation Filter Strip Incentive Program – Final Report.” January 2007. Sangamon County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 393

BMP Name Filter Strip

Amount 599.8 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 5,375 7,577 14,934

03-15(319)CD

Title: Addison Creek Riparian Restoration Purpose:

This project restored 1.29 acres of riparian wetlands and stabilized eroding streambanks along an approximately 1,300-foot segment of Addison Creek (ILGA02) located in Northlake, Illinois. The design included re-grading streambanks and establishing a thirty (30) foot wide wetland (1.29 acres total) on each side of the 1,300 foot long stream segment. The wetland included emergent vegetation, scrub shrub interspersed plantings, and wet-mesic prairie. Bioengineering streambank stabilization practices were used (i.e., selective tree removal for increased light penetration; clearing invasive and controlling exotic plant species by cutting and herbiciding; planting native forbs, grasses, and sedges; re-grading; stone toe protection; riffles).

Project Location:

Cook County

Subgrantee: City of Northlake 55 East North Avenue Northlake, Illinois 60164 Project Reports and Other Informational Materials: “Addison Creek Riparian Restoration Project.” June 2006. Christopher B. Burke Engineering, Ltd. BMP Implementation Summary: BMP Code 580 657

BMP Name Streambank/Shoreline Protection Wetland Restoration

Amount 2,250 ft. 1.29 ac.

03-16(319)SR

155

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 124 124 249 75 75 149

Title: Hillsboro Lake Stormwater Wetland No. 1 Project Purpose:

This project involved the construction of a sediment basin and seven rock check dams along with the enhancement of a stormwater wetland on a ravine tributary to Hillsboro Lake (ILROT). The practices were designed to improve water quality, remove suspended and soluble nonpoint source pollutants, enhance habitat and aesthetics, and provide water retention and other beneficial hydrologic functions.

Project Location:

Montgomery County

Subgrantee: City of Hillsboro 447 South Main Street Hillsboro, Illinois 62049 Project Reports and Other Informational Materials: “Hillsboro Lake, City of Hillsboro, Illinois Stormwater Wetland Basin #1 (Southwest Ravine Tributary to Hillsboro Lake) Final Report.” July 14, 2005. Heartland Ecosystem Services, Inc. BMP Implementation Summary: BMP Code 350 410 800

BMP Name Sediment Basin Grade Stabilization Structure Urban Stormwater Wetland

Amount 1 (no.) 7 (no.) 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 162 160 319 ? ? ? ? ? ?

03-18(319)ST

Title: Lake Vermilion Shoreline Stabilization Project Purpose:

This project installed shoreline stabilization best management practices (i.e., riprap, geotextile fabric, vegetation) on 9,414 linear feet of eroded shoreline on Lake Vermilion (ILRBD) to reduce nonpoint source pollution and enhance aquatic habitat.

Project Location:

Vermilion County

Subgrantee: Consumers Illinois Water Company 1300 West Fairchild Street Danville, Illinois 61832 Project Reports and Other Informational Materials: “Phase 2 Implementation Project Lake Vermilion Shoreline Stabilization – Project Evaluation and Final Report.” June 2005. Cochran & Wilken, Inc.

156

BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 9,414 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 2,039.7 1,755.8 3,511.9

03-19(319)SR (JC)

Title: North Fork Vermilion River Watershed Project Purpose:

This project installed eight ponds and two water and sediment control basins in the Lake Vermilion watershed and implemented extensive information and education programs. A conservation tour of other best management practices (BMPs) was also held.

Project Location:

Vermilion County

Subgrantee: Vermilion County Soil & Water Conservation District 1905 – A US Route 150 Danville, Illinois 61832 Project Reports and Other Informational Materials: “North Fork Vermilion River Watershed Project – Phase III Final Report.” December 2007. Vermilion County Soil & Water Conservation District BMP Implementation Summary: BMP Code 378 638

BMP Name Pond Water & Sediment Control Basin

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 8 (no.) 889 417 832 14,375 ft. 241 86 172

03-20(319)CD

Title: Charleston SCR Sedimentation Basin Purpose:

This project involved the installation of 431 feet of shoreline stabilization and construction of an in-lake sedimentation control structure in the northwest cove of the Charleston Side-Channel Reservoir (ILRBC). The structure was designed to remove suspended and soluble nonpoint source pollutants, and enhance habitat and aesthetics. The TMDL and implementation plan for the Charleston Side-Channel Reservoir (ILRBC) is complete.

Project Location:

Coles County

157

Subgrantee: City of Charleston 520 Jackson Avenue Charleston, Illinois 61920 Project Reports and Other Informational Materials: “Charleston Side-Channel Reservoir Sediment Basin Project Final Report.” July 10, 2007. City of Charleston. BMP Implementation Summary: BMP Code 350 580

BMP Name Sediment Basin Streambank/Shoreline Protection

Amount 1 (no.) 431 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 899 563 1,125 27 27 55

03-21(319)CD

Title: Salt Creek Streambank Stabilization – Elk Grove Village Purpose:

This project reduced erosion and nonpoint source pollution through the stabilization of 4,497 feet of eroding streambanks along a segment of Salt Creek (ILGL09) located in Elk Grove Village, Illinois. Bioengineering techniques (i.e., A-jacks, selective tree removal, native vegetation planting, erosion control blankets) were used.

Project Location:

Cook County

Subgrantee: Village of Elk Grove Village 901 Wellington Avenue Elk Grove Village, Illinois 60007-3499 Project Reports and Other Informational Materials: “Salt Creek Streambank Stabilization – Elk Grove Village – Final Report.” July 2006. Village of Elk Grove Village.

BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 4,497 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 262 222 444

03-22(319)SR

Title: Lyman Woods Streambank, Streambed & Gully Stabilization Purpose:

This project installed best management practices (BMPs) to stabilize eroding streambanks, improve water quality, reduce nonpoint source pollution, and

158

enhance aquatic habitat along 2,804 feet of streambank on Lacey Creek (ILGBL10), a tributary of the East Branch of the DuPage River. Bioengineering techniques (i.e., cobble toe, artificial riffles, streambank re-sloping, cross vanes, A-jacks, fiber roll, and vegetative stabilization) were used. The East Branch DuPage River is a Category 1 watershed in the Unified Watershed Assessment and is included on Illinois 303d list. The TMDL and implementation plan for the East Branch DuPage River is complete. Project Location:

DuPage County

Subgrantee: Downers Grove Park District 2455 Warrenville Road Downers Grove, Illinois 60515 Project Reports and Other Informational Materials: “Lyman Woods Streambank Stabilization PSA 2, Phase 1 & 2 Tributary to the East Branch DuPage River – Section 319 Project Report.” December 2007. Living Waters Consultants, Inc. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 2,804 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 222 222 445

03-23(319)ST

Title: Integrated Watershed Planning for Rayse Creek Purpose:

The Recipient in conjunction with the Rayse Creek Watershed Planning Committee developed a comprehensive Watershed Management Plan (Plan) for the Rayse Creek (ILNK01) watershed. The Plan includes a water resource specific description of all existing or potential water quality problems, their impacts, and the data used to identify said problems. The assessment also includes a water resource specific description of high quality waters in watershed. The Plan was developed to improve water quality by controlling nonpoint source pollution. The Plan contains a problem statement, goals and objectives, determinations of the type and location of causes and sources of impairments, alternatives for watershed protection, and the establishment of priorities for watershed improvements. The Plan includes site-specific Best Management Practices (BMPs) implementation recommendations for nonpoint source pollution control. Potential BMPs were identified for prevention, remediation, restoration, and maintenance to achieve water quality and natural resource objectives. The TMDL and implementation plan for Rayse Creek are complete.

Project Location:

Jefferson County

159

Subgrantee: Southern Illinois University - Carbondale Department of Forestry Carbondale, Illinois 62901 Project Reports and Other Informational Materials: “Rayse Creek Watershed Management Plan.” Southern Illinois University Carbondale.

October 2006.

Department of Forestry,

03-24(319)ST

Title: Stream Restoration Phase 2 - Trib. 6 to E. Br. DuPage R. Purpose:

Approximately 731 feet of eroding streambank along an unnamed stream, tributary number 6 of the East Branch DuPage River (ILGBL10), were stabilized using bioengineering techniques (rip rap, A-jacks, rock riffles, re-grading, vegetated geogrid, fiber roll, vegetation) and a 1.13 acre riparian buffer was also established to improve water quality in the stream. The East Branch DuPage River is a Category 1 watershed in the Unified Watershed Assessment and is included on Illinois 303d list. The TMDL and implementation plan for the East Branch DuPage River is complete.

Project Location:

DuPage County

Subgrantee: Hobson Creek Community Council 23W420 Country Court Naperville, Illinois 60540 Project Reports and Other Informational Materials: “Hobson Creek Corridor Restoration Project, Phase 2. Tributary 6 to the East Branch DuPage River – Final Report.” November 2005. Ted Gray & Associates, Inc. BMP Implementation Summary: BMP Code 580 657

BMP Name Streambank/Shoreline Protection Wetland Restoration

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 731 ft. 53 53 106 1.13 (ac.) ? ? ?

03-25(319)ST

Title: RiverWorks Exhibit Purpose: This project will educate museum visitors about Illinois rivers and allow them to explore the many jobs that rivers take on, discover the ways in which humans try to make rivers work for us, experiment with different river projects, and find out about the many changes that have been made to the Chicago River.

160

Project Location:

Cook County

Subgrantee: The Peggy Notebaert Nature Museum 2430 Cannon Drive Chicago, Illinois 60614 03-26(319)BL

Title: A Sustainable Community Based Approach to Reducing NPS Pollution Purpose:

This project demonstrated the value of using green infrastructure in Addison Creek (ILGLA01) to address nonpoint source pollution. The project installed and monitored a 240 square foot rain garden of native plants and a 220 square foot rain garden of turf grass to demonstrate cost-effective, community based best management practices (BMPs) to reduce nonpoint source pollution in urban and urbanizing areas.

Project Location:

Cook County

Subgrantee: Center for Neighborhood Technology 2125 West North Avenue Chicago, Illinois 60647 Project Reports and Other Informational Materials: “A Sustainable Community-Based Approach to Reducing Non-Point Source Pollution.” January 2009. Center for Neighborhood Technology. BMP Implementation Summary: BMP Code 013

BMP Name Rain Garden

Amount 2 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ?

03-27(319)JC

Title: Northeastern Illinois Stream Restoration Inventory Purpose:

The U.S. Geological Survey conducted an inventory of stream restoration projects (i.e., streambank stabilization, riparian buffer restoration, in-stream restoration, channel re-meandering, and dam modification and removal) implemented in northeastern Illinois with funding under Section 319 of the Clean water Act. Information was collected from thirty-four restoration projects installed before the major flooding that occurred in the summer of 2007. Sites were selected to represent a sample of each restoration and stabilization practice in both urban and urbanizing watersheds, and under different geomorphic settings. The inventory included thorough photographic documentation, compilation and investigation of design plans, and an examination of flow records.

161

Project Location:

Statewide

Subgrantee: U.S. Geological Survey 1201 W. University Ave., Suite 100 Urbana, Illinois 61801 Project Reports and Other Informational Materials: “Illinois Stream Restoration and Stabilization Projects – An Inventory of Illinois Stream Best Management Practices.” September 2008. U.S. Geological Survey. 03-28(319)SR

Title: Watershed Planning to Protect the Kishwaukee River Basin Purpose: This project produced watershed-based plans in three subwatersheds of the Kishwaukee River Basin. The subwatersheds included the Upper Kishwaukee River (ILPQ13), Lawrence Creek (ILPQEC-A), and Beaver Creek (ILPQD07). These watershed-based plans addressed USEPA's 9 minimum elements of a watershed-based plan. This project also addressed the recommendations found in “Framework for a Basin-wide Planning and Protection Pilot” developed by the Basinwide Management Advisory Group, May 30, 2004. Project Location:

Counties of McHenry and Boone

Subgrantee: Chicago Metropolitan Agency for Planning 233 South Wacker Drive, Suite 800 Chicago, Illinois 60606 Project Reports and Other Informational Materials: “Upper Kishwaukee River Watershed Plan – Technical Report.” November 2008. Chicago Metropolitan Agency for Planning. “Lawrence Creek Watershed Plan – Technical Report.” Metropolitan Agency for Planning. “Beaver Creek Watershed Action Plan – Technical Report.” Metropolitan Agency for Planning.

September 2008. September 2008.

Chicago

Chicago

03-29(319)JC

Title: Hyacinth Place: Model Permeable Paver System Purpose:

This project constructed a permeable pavement parking lot to reduce nonpoint source pollution to Lake Michigan from the 500 Hyacinth Place development in Highland Park, Illinois. The new permeable parking lot (7,392 square feet) and

162

underground storage was designed to filter runoff so as to remove suspended sediment, heavy metals, oil and grease, nutrients, and other suspended and soluble nonpoint source pollutants as well as reduce runoff volume and velocity while providing other beneficial hydrologic functions. The permeable pavement was designed so as to retain smaller rain events within the voids of the porous paving drainage layer and evaporated over time. Project Location:

Lake County

Subgrantee: Hyacinth Place LLC 666 Dundee Road, Suite 1102 Northbrook, Illinois 60062 Project Reports and Other Informational Materials: “500 Hyacinth Place, Highland Park, Illinois: A Model for Sustainable Affordable Development – Final Report. August 28, 2008. Brinshore Development LLC. BMP Implementation Summary: BMP Code 890

BMP Name Porous Pavement

Amount 0.17 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 0 2

03-30(319)SR

Title: Total Maximum Daily Load Development Purpose: The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within selected watersheds on the 303(d) list through computer modeling. For each watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. 03-(319)BY

FFY04 FEDERALLY FUNDED SECTION 319 PROJECTS

Title: Priority Lake & Watershed Implementation Program Purpose: Section 319 funding was used to supplement the existing State funded (Conservation 2000) Priority Lake and Watershed Implementation Program (PLWIP). PLWIP is a reimbursement grant program designed to support lake protection, restoration, and enhancement activities at "priority" lakes where causes and sources of problems are apparent, project sites are highly accessible, project size is relatively small, and local entities are in a position to quickly implement needed treatments. Funding is provided for in-lake BMPs (i.e., shoreline

163

stabilization, aerator/destratifier installation) and near-lake BMPs (i.e., dry dams, filter strips) that reduce nonpoint source pollution or mitigate their impacts. The first round of PLWIP projects stabilized eroding shorelines of Cedar Lake (200 ft.), Highland Old City Lake (500 ft.), Pana Lake (1,100 ft.), and Walton Park Lake (1,000 ft.). Also, stabilization utilizing an aggregate breakwater to create an intermediate wetland on Kinkaid Lake and planting 20,000 aquatic plant seedlings at Paradise Lake. The second round of PLWIP projects stabilized eroding shorelines of McLeansboro City Reservoir (200 ft.), Greenfield Lake (1,000 ft.), and Walton Park Lake (1,000 ft.). And 25,000 cubic yards of sediment were removed from Lake Charlie Brown. NPS Program: Hydrologic Modification & Agriculture Project Location:

Counties of Jackson, Madison, Shelby, Montgomery, Coles, Clay, Hamilton, & Greene

BMP Implementation Summary: BMP Code 580 657 007

BMP Name Streambank/Shoreline Protection Wetland Restoration Dredging

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 6,200 (ft.) 109 95 185 0.2 (ac.) ? ? ? 1 (no.) ? ? ?

04-01(319)AW

Title: Of Time and the River Purpose: This educational project combined archaeology, ethnohistory, several biological sciences, geology, and economics to survey the 12,000-year history of human use of the Illinois River. A web-based exhibit was developed to 1) educate the public about the 12,000 year history of the Illinois River, 2) increase public awareness of nonpoint source pollution and associated problems and how these have adversely impacted the Illinois River through time, 3) highlight what has been done to resolve these problems, and 4) discuss what still needs to be done. The historical background provides a context for understanding changes that have occurred through time due to human activities in and around the river, specifically how nonpoint source pollution began and developed, the consequences of nonpoint source pollution for aquatic populations and those who rely on aquatic resources, and how the 1972 Clean Water Act and subsequent amendments initiated on-going programs to correct nonpoint source pollution. Project Location:

Sangamon County

Subgrantee: Illinois State Museum Society 502 South Spring Street Springfield IL 62702

164

Project Reports and Other Informational Materials: http://www.oftimeandtheriver.org/ 04-02 (319)BL

Title: Green Roof Project on the McKessen Building, Rock Island Purpose: River Action, Inc. installed a green roof system on the roof (10,100 square feet) of the McKessen Building in downtown Rock Island. The project addressed urban runoff impacts to the Mississippi River and demonstrated innovative, infiltration based stormwater management approaches for highly impervious areas to address pollution problems and reduce flooding. Access to the rooftop was provided for tours and case studies. Public workshops and seminars were held for adults and school-age children. Street side and rooftop interpretive signage was installed. A runoff measurement system was designed and installed on both the green roof and a control roof. Project Location:

Rock Island County

Subgrantee: River Action, Inc. Post Office Box 964 Davenport, Illinois 52805-0964 Project Reports and Other Informational Materials: “A Green Roof Project on the McKesson Building by River Action: A green Roof System to Reduce Urban Runoff – Final Report.” September 2008. River Action, Inc. BMP Implementation Summary: BMP Code 011

BMP Name Green Roof

Amount 0.23 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 11 0

04-03 (319)ST

Title: Streambank Clean Up & Lakeshore Enhancement (SCALE) Purpose: This project provided financial assistance to selected applicants to conduct lakeshore and streambank clean-up events. Local organizations that have previously conducted a lakeshore or streambank clean-up event were eligible to participate. The local sponsor was given up to $3,500 to help conduct their cleanup event. The local sponsor could use the funds for event promotion, event equipment or disposal fees. Project Location:

Statewide

Subgrantee: Not Applicable

165

04-04 (319)CD

Title: North Fork Embarras River Watershed Project – Phase 4 Purpose: This project protected and improved the water quality of the North Fork Embarras River (ILBEF05) watershed by reducing nonpoint source pollution through a continuation of the efforts initiated with Section 319 funding under federal fiscal years 1996, 2000, and 2002. A comprehensive program of sediment and nutrient reduction was implemented that included watershed protection, information, and education efforts. Best management practices were installed for both upland watershed protection and streambank protection. Project Location:

Counties of Jasper and Clark

Subgrantee: North Fork Conservancy District Post Office Box 7, 110 East Main Casey, Illinois 62420 Project Reports and Other Informational Materials: “North Fork Embarras River Watershed Project – Phase 4 – Final Report.” November 8, 2007. North Fork Conservancy District. BMP Implementation Summary: BMP Code 378 410 412 580 600 638

BMP Name Pond Grade Stabilization Structure Grassed Waterway Streambank/Shoreline Stabilization Terrace Water & Sediment Control Basin

Amount 11 (no.) 4 (no.) 7.5 ac. 4,584 ft. 2,900 ft. 990 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 724 120 245 70 16 33 49 49 93 1,355 1,219 2,437 38 12 26 34 16 32

04-05(319)SR (JC)

Title: Protecting Water Quality in Urban Centers of Illinois Purpose: This project maintained and improved water quality in urbanized areas by creating a partnership between urban soil and water conservation districts (SWCDs) and Illinois EPA. Section 319 funds, in combination with local matching dollars or inkind services, were used to undertake special nonpoint source pollution prevention education/information projects aimed at local government land use decision makers and the development community. Grant funds to SWCDs were used to develop the technical capabilities of SWCD staffs to develop and deliver technical educational materials or to conduct educational workshops or seminars. Project Location:

Statewide

166

Subgrantee: Association of Illinois Soil & Water Conservation Districts 2520 Main Street, Illinois State Fairgrounds Springfield, Illinois 62702 Project Reports and Other Informational Materials: “Protecting Water Quality in Urban Centers Project – Final Report.” July 2007. Association of Illinois Soil & Water Conservation Districts. 04-06(319)CD

Title: Greater Eliza Watershed Project – Phase 3 Purpose: The purpose of this project was to protect and improve the water quality of the Greater Eliza Creek (ILMWD01) watershed by reducing nonpoint source pollutants. The project provided cost-share assistance to watershed landowners to implement a variety of upland and floodplain best management practices (ponds, grassed waterways, water and sediment control basins, and critical area planting). An educational program was developed to educate the public about the importance of streambank stabilization and nonpoint source pollution. This project was a continuation of an effort initiated with FFY 1998 and FFY 2001 Section 319 funding. Project Location:

Mercer County

Subgrantee: Mercer County Soil & Water Conservation District th 308 Southeast 8 Avenue Aledo, Illinois 61231 Project Reports and Other Informational Materials: “Greater Eliza Watershed Project – Phase III – Final Report.” December 2007. Mercer County Soil & Water Conservation District. BMP Implementation Summary: BMP Code 342 378 412 638

BMP Name Critical Area Planting Pond Grassed Waterway Water & Sediment Control Basin

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 5 ac. 19 21 42 8 (no.) 585 339 674 0.4 ac. 31 31 61 22,525 ft. 1,371 814 1,629

04-07(319)SR (JC)

Title: Kaskaskia River Watershed Hypoxia Analysis

167

Purpose: This project utilized existing water quality data, which had been previously collected by state and federal sources, to develop a GIS that will allow for a greater understanding of the sources of entry for nutrients (nonpoint source) into the watershed. The advantages of GIS include the ability to incorporate additional data; such as current and historical land use, as well as the ability to develop information at local, regional, subwatershed or watershed levels. This project produced paper and electronic maps, with associated data, that allows local soil and water conservation districts to better understand the impact that their region is having on the overall hypoxia phenomenon. The data developed as a component of this project can be incorporated into the development and implementation of TMDLs, which will lead to an overall reduction in the factors that cause hypoxia. Project Location: Counties of Bond, Clinton, Madison, Monroe, Randolph, St. Clair, & Washington. Subgrantee: Southwestern Illinois Resource Conservation and Development, Inc. 406 East Main Street Mascoutah, Illinois 62258 Project Reports and Other Informational Materials: “Kaskaskia River Watershed Hypoxia Analysis. January 2007. Southwestern Illinois Resource Conservation and Development, Inc. 04-09(319)CD

Title: Watershed Based Planning Purpose: This project coordinated the development of four (4) watershed-based plans designed to improve water quality by controlling nonpoint source pollution. The four watersheds included Evergreen Lake (ILSDA), Salt Fork Vermilion River (ILBPJ10), Clinton Lake (ILREI)/Salt Creek, and lower part of Upper Sangamon River. The Association of Illinois Soil & Water Conservation Districts (AISWCD) provided oversight and review to ensure consistency with Illinois EPA and USEPA guidance. The project also included the installation of a 7,900 square foot porous pavement drive and parking lot system at the AISWCD office to be used for information/education and outreach purposes to local SWCD staff and other entities interested in parking lot improvement projects. Project Location:

Sangamon, McLean, Champaign, Dewitt, and Macon Counties

Subgrantee: Association of Illinois Soil & Water Conservation Districts 4285 North Walnut Street Road Springfield, Illinois 62707

168

Project Reports and Other Informational Materials: “Watershed Based Planning Initiative – Final Report.” March 2009. Association of Illinois Soil & Water Conservation Districts “Watershed Implementation Plan for the Upper Salt Fork of the Vermilion River.” May 2007. Champaign County Soil and Water Conservation District. “Evergreen Lake Watershed Plan.” 2008. Evergreen Lake Watershed Planning Committee McLean County Soil and Water Conservation District. “Lower Part of the Upper Sangamon River Watershed Resource Plan.” Macon County Soil and Water Conservation District. “Clinton Lake Watershed Management Plan.” June 29, 2007. Committee - DeWitt County Soil and Water Conservation District.

June 25, 2008.

Clinton Lake Planning

04-10(319)CD

Title: Homer Lake: Making it Clear.. One Household, One field at a Time Purpose: The Champaign County Forest Preserve District (CCFPD) and Champaign County Soil and Water Conservation District (CCSWCD) worked cooperatively to inform agricultural and urban landowners within the Homer Lake watershed how they can cost-effectively reduce nonpoint source pollution inputs to the lake. In addition to informing large groups in workshops, an effort was made to individually contact all agricultural producers to help them plan and implement the practices best suited for their operation. Incentive payments were offered to implement agricultural practices (nutrient management, variable rate application technology, deep placement of phosphorus, vegetative buffers, and strip till) that will provide the greatest benefit to the lake. A specialized toolbar was made available for deep-placement of phosphorus on agricultural fields. Project Location:

Champaign County

Subgrantee: Champaign County Soil & Water Conservation District 2110 W. Park Court, Suite C Champaign, Illinois 61821 Project Reports and Other Informational Materials: “Homer Lake: Making it Clear.. One Household, One field at a Time – Final Report.” May 1, 2007. Champaign County Soil & Water Conservation District.

169

BMP Implementation Summary: BMP Code 329 393 590

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 437.8 ac. 1,277 1,328 2,560 26.9 ac. 59 80 153 4,155.2 ac. 36,522 29,971 58,897

BMP Name Conservation Tillage Filter Strip Nutrient Management

04-11(319)CD (JC)

Title: Water Quality Strategic Research Initiative Purpose: This research project was headed by the Illinois Council on Food and Agricultural Research (C-FAR) Strategic Research Initiative (SRI) for Water Quality. The project helped fund continued research for four projects: 1) Effects of phosphorus mediated through algal biomass in Illinois streams; 2) Spatial and temporal relationships between biotic integrity of Illinois streams, dissolved oxygen, and nutrients (including controls on dissolved reactive and particulate phosphorus); 3) Seasonal dynamics of nutrients, algae and dissolved oxygen in agriculturally dominated headwater streams: the link between land-use and water quality; and 4) The impact of sediments on the potential bioavailability of phosphorus in Illinois streams. These four projects directly impact Illinois EPA's nutrient standards and TMDL development programs. Project Location:

Statewide

Subgrantee: The Board of Trustees of the University of Illinois 1901 South First Street, Suite A Champaign, Illinois 61820 Project Reports and Other Informational Materials: WWW.ilcfar.org/research/waterqualityforum.html “Water Quality Strategic Research Initiative – Final Report.” November 21, 2008. University of Illinois – Extension. 04-12(319)JC

Title: Watershed Based Plan Upgrades in Northeastern Illinois Purpose: This project coordinated the upgrade and development of watershed-based plans in northeastern Illinois. The Northeastern Illinois Planning Commission (NIPC) sent out a Request for Proposals to northeastern Illinois watershed planning groups. The proposals were reviewed and ranked for completeness and cost-effectiveness and funding was distributed to the watershed planning groups for the upgrade of their watershed plan. NIPC was a member of each watershed planning team and provided GIS support and technical oversight and review to ensure consistency with

170

Illinois EPA and USEPA guidance. Plans were developed for Tyler Creek (ILDTZP02), Bull Creek/Bulls Brook, Indian Creek, Fish Lake Drain, N. Br. Chicago River, Nippersink Creek (ILDTK04), and E. Br. DuPage River and W. Br. DuPage River. Project Location:

Counties of Lake and DuPage

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Indian Creek Watershed Plan.” Draft - June 2006. Applied Ecological Services, Inc. & Lake County Stormwater Management Commission. “The Nippersink Creek Watershed Plan.” February 2008. Watershed Resource Consultants, Inc. & The Nippersink Creek Watershed Planning Committee. “The Tyler Creek Watershed Plan.” March 2008. Watershed Resource Consultants, Inc. & The Conservation Foundation. “Bull Creek/Bull’s Brook Watershed-Based Plan.” Final Draft, March 31, 2008. Ecological Services, Inc. & Lake County Stormwater Management Commission.

Applied

“Fish Lake Drain Watershed Management Plan.” April 2008. Conservation Design Forum & Lake County Stormwater Management Commission. “North Branch Chicago River Watershed-Based Plan for Lake and Cook Counties, Illinois.” May 22, 2008. Lake County Stormwater Management Commission. “Upper DuPage River Watershed Plan. 2007 Update.” December 2007. The Conservation Foundation. 04-13(319)SR

Title: Fox River Watershed Planning, Restoration, & Protection Purpose: This project continued the implementation of the “Integrated Management Plan for the Fox River Watershed in Illinois.” The project included eight watershed restoration and protection projects as well as watershed-wide project coordination and technical assistance. Lake Run Habitat Restoration Project restored a 3,350foot segment of Long Run, a tributary of Blackberry Creek (ILDTD02), and 41.79 acres of wetlands. Otter Creek Stream Restoration Project stabilized 3,095 feet of eroding streambanks along Otter Creek (ILDTF02), a tributary to Ferson Creek and the Fox River. St. Charles Stormwater Outfall Treatment Basin project constructed a wetland basin to receive and treat stormwater runoff prior to discharge to 7 th Avenue Creek, a tributary of the Fox River. Poplar Creek Streambank Restoration Project stabilized 200 feet of eroding streambanks along Poplar Creek (ILDTG02), a 171

tributary of the Fox River. Restoration of Lake Antioch Wetlands & Feedstream project constructed a stone filter check fence with wetland planting and stabilized 515 feet of eroding streambanks tributary to Lake Antioch. Presbury Lake Shoreline Restoration Project stabilized 925 feet of eroding shoreline along Presbury Lake. Woods Creek Nonpoint Source Control project retrofitted three existing dry bottom detention basins into wetland detention basins, installed native vegetation in ponds and adjacent areas upstream of Woods Creek to enhance pollutant removal, conduct storm drain stenciling, and installed educational signage. Long Lake Shoreline Stabilization Project stabilized 1,667 feet of eroding shoreline along Long Lake (ILRTJ). The Fox River is included on Illinois’ 303(d) list. This project executed nonpoint source pollution control recommendations of a watershed-based plan for the Fox River. Project Location:

Counties of Cook, Kane, & Lake

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Fox River Watershed Planning, Restoration, & Protection – Final Report.” December 2007. Chicago Metropolitan Agency for Planning. BMP Implementation Summary: BMP Code 580 584 657 800 840 910

BMP Name Streambank/Shoreline Stabilization Stream Channel Stabilization Wetland Restoration Urban Stormwater Wetland Grass-Lined Channel Rock Outlet Protection

Amount 5,887 ft. 3,865 ft. 41.79 ac. 4 (no.) 0.55 ac. 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 451 421 839 54 53 106 ? 14 84 ? 104 352 ? 67 191 ? ? ?

04-14(319)SR

Title: Upper DesPlaines River WRAS Implementation Purpose: This project continued the implementation of the Upper DesPlaines River Watershed Restoration Action Strategy as prepared by the Upper DesPlaines River Ecosystem Partnership. The project included two watershed restoration and protection projects as well as watershed-wide project coordination and technical assistance. Ryerson Conservation Area - Visitors Center Site Work project installed stormwater BMPs (porous pavement, bioswales, cisterns, and rain garden) during construction of a new visitor’s center and implemented educational activities (interpretive signs, exhibit panels, and brochures). Ravinia and Indian Creek Parks Project included 1,401 feet of streambank stabilization and upland slope stabilization, vegetation management and planting, 0.48 acres of floodplain

172

restoration, stormwater wetland, and interpretive signage along improved trails. The DesPlaines River is included on Illinois’ 303(d) list. Project Location:

Lake County

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Upper DesPlaines River WRAS Implementation – Final Report.” Metropolitan Agency for Planning.

July 2007.

Chicago

BMP Implementation Summary: BMP Code 012 013 580 657 800 845 890

BMP Name Cistern Rain Garden Streambank/Shoreline Protection Wetland Restoration Urban Stormwater Wetland Infiltration Trench Porous Pavement

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 2 (no.) ? ? ? 1 (no.) 0 1 8 1,401.5 ft. 22 22 42 0.48 ac. ? ? ? 1 (no.) ? 49 261 4 (no.) ? 0 0 0.95 ac. ? 1 20

04-15(319)SR

Title: Conservation Reserve Enhancement Program (CREP) Assistance Purpose: The Association of Illinois Soil & Water Conservation District (AISWCD) subcontracted with SWCDs to hire staff to facilitate the enrollment process of the Conservation Reserve Enhancement Program (CREP) by setting appointments with producers to discuss CREP and conduct field visits to determine program eligibility. The SWCDs completed the Conservation Reserve Program - 2 form, type the Conservation Plan of Operations, obtained the necessary producer signatures on required documents, and completed all state CREP enrollment forms. The SWCDs coordinated activities associated with land surveys, producer signatures on easements, and recording easements with the local abstract office. Field assistance was provided to the survey and design teams as well as construction assistance by evaluating the construction expenses and completing form AD-862. Project Location:

Statewide

Subgrantee: Association of Illinois Soil & Water Conservation Districts 2520 Main Street Springfield, Illinois 62702

173

BMP Implementation Summary: BMP Code 393

BMP Name Filter Strip

Amount 9,300 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 500 500 500

04-16(319) JC

Title: North Branch Watershed Project - Ongoing Implementation Phase Purpose: This project continued implementation of additional Best Management Practices (BMP) in accordance with the North Branch Watershed Management Plan in Lake and Cook Counties. Lake County Stormwater Management Commission continued watershed plan implementation in the North Branch Chicago River Watershed. The North Branch Chicago River is included on Illinois’ 303(d) list. This project executed nonpoint source pollution control recommendations of a watershed-based plan for the North Branch Chicago River. Project Location:

Counties of Lake & Cook

Subgrantee: Lake County Stormwater Management Commission 333 Peterson Road Libertyville, Illinois 60048 Project Reports and Other Informational Materials: “North Branch Watershed Project Implementation - Phase 4 Final Report.” July 27, 2007. Lake County Stormwater Management Commission. BMP Implementation Summary: BMP Code 580 657 800 835

BMP Name Streambank/Shoreline Protection Wetland Restoration Urban Stormwater Wetland Urban Filter Strip

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 11,434 ft. 1,297 1,191 2,384 34 ac. ? 3 5 3 (no.) ? 131 493 0.092 ac. ? 2 7

04-17(319)CD

Title: NPS Program Implementation Assistance - Phase 2 Purpose: This project allowed for continued technical, educational, and informational assistance to, and through the county soil and water conservation districts. This position provided assistance to Illinois EPA regarding water quality issues, program outreach and implementation. Continuing the existence of the Watershed Liaison position allowed for the initiatives/programs developed thus far to be improved upon and expanded. Project Location:

Statewide

174

Subgrantee: Association of Illinois Soil & Water Conservation Districts 4285 North Walnut Street Road Springfield, Illinois 62707 Project Reports and Other Informational Materials: “Nonpoint Source Program Implementation Assistance - Phase 2.” May 2008. Association of Illinois Soil & Water Conservation Districts. 04-19(319) CD

Title: Conservation Practices Mapping and Assessment Purpose: This project continued development of the best management practice (BMP) database developed by the University of Illinois and Illinois EPA to geographically track BMPs implemented by the Illinois EPA with funding under Section 319 of the Clean Water Act. In cooperation with the Illinois EPA, the Recipient identified and implemented proposed enhancements to the interface, database, and design. Project Location:

Statewide

Subgrantee: University of Illinois 109 Cobble Hall, 801 South Wright Street Champaign, Illinois 61820 04-20(319)SR

Title: Farm Progress Show Site BMP Project Purpose: The Illinois Land Improvement Contractors Association held a Conservation Expo at the permanent Farm Progress Show site in Decatur, Illinois. The three day expo was designed to provide current information and demonstrations of proper installation techniques of best management practices to conservation contractors; local, state, and federal employees (such as SWCD, CES, and NRCS); and landowners interested in conservation on their land. Project Location:

Macon County

Subgrantee: Illinois Land Improvement Contractors Association, Inc. 2060 Timberbrook Drive Springfield, Illinois 62702 Project Reports and Other Informational Materials: “Farm Progress Show Site BMP Project – Final Report.” September 26, 2006. Illinois Land Improvement Contractors Association, Inc.

175

04-21(319)CD

Title: Regional Stormwater BMP Park Purpose: The City of Elgin updated the conceptual master plan for the new recreational park to be located on a 224-acre parcel at the intersection of Muirhead Road and Plank Road in Elgin, Illinois to include a state-of-the-art stormwater management system, which emphasizes hydrologic approaches to nonpoint source pollution control by reducing both the volume of runoff and the concentrations of pollutants through infiltration, evaporation, and sedimentation. A fact sheet was published for each selected BMP that included basic information about the BMP. A monitoring program was prepared to evaluate the effectiveness of the selected proposed BMPs. A preliminary site plan was prepared to identify the proposed facilities and the proposed BMPs at the site, which is in the Tyler Creek (ILDTZP02) watershed. Project Location:

Kane County

Subgrantee: City of Elgin 100 Symphony Way Elgin, IL 60120 Project Reports and Other Informational Materials: “City of Elgin Regional Stormwater BMP Park.” September 30, 2008. City of Elgin. 04-22(319)SR

Title: Flint Creek Watershed Based Plan Purpose: This project developed a watershed-based plan for the Flint Creek watershed that is designed to improve water quality by controlling nonpoint source pollution. The plan is consistent with the USEPA watershed based plan guidance dated August 26, 2003 (as revised), Illinois EPA draft “Guidance for Developing Watershed Implementation Plans in Illinois” (IEPA/BOW/98-002 – March 1998), total maximum daily load (TMDL) implementation plan requirements, and current watershed planning principles. The Flint Creek Watershed Partnership worked with local stakeholders to develop an integrated watershed plan for the Flint Creek watershed that included watershed data evaluation and resource inventory along with site specific Best Management Practices recommendations designed to improve water quality by reducing suspended sediment, nutrients and other pollutants while enhancing habitat and aesthetics. Project Location:

Counties of Cook & Lake

Subgrantee: Citizens for Conservation Flint Creek Watershed Partnership 459 West Highway 22 Barrington, Illinois 60010

176

Project Reports and Other Informational Materials: “Flint Creek Watershed-Based Plan.” December 2007. Applied Ecological Services, Inc. www.flintcreekwatershed.org 04-23(319)SR

Title: Watershed Capacity Building Purpose: A survey was developed and mailed to determine the specific additional tools and knowledge that Illinois’ various watershed groups need in order to improve the effectiveness of their water quality protection and restoration programs. A training session was held. Data from the survey was compiled, reviewed, and analyzed. A Watershed Capacity Building Strategy (Strategy) was developed that documents and considers the survey results and recommends specific actions to be taken to satisfy the identified deficiencies. Project Location:

Statewide

Subgrantee: Prairie Rivers Network 1902 Fox Drive, Suite G Champaign, Illinois 61820 Project Reports and Other Informational Materials: “A Strategy for Building Capacity in Illinois Watersheds.” May 2009. Prairie Rivers Network. 04-24(319)AW

Title: Waukegan River Restoration Project Purpose: This project restored 450 feet of failed streambank stabilization practices installed on the Waukegan River (ILQ01). Restoration was designed to arrest streambank erosion and reduce nonpoint source pollution through the installation of environmentally sound practices while protecting or enhancing habitat, ameliorating damage from peak flows, reducing velocity of peak flows, and enhancing aesthetic qualities. Project Location:

Lake County

Subgrantee: Waukegan Park District 2211 Erine Kruger Circle Waukegan, Illinois 60087

177

Project Reports and Other Informational Materials: “Powell Park/Waukegan River Restoration Project.” District.

September 2009.

Waukegan Park

BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 450 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 86 73 147

04-25(319)ST

Title: Total Maximum Daily Load Development Purpose: The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within selected watersheds on the 303(d) list through computer modeling. For each watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. Project Location:

Statewide

04-(319)BY

FFY05 FEDERALLY FUNDED SECTION 319 PROJECTS Title: City of Chicago Best Management Practices Implementation Purpose: This project addressed nonpoint source pollution urban runoff impacts to the Chicago River (ILHCC08) and Lake Michigan and demonstrated innovative, infiltration based stormwater management approaches for highly pervious areas. The project included construction of the following practices at the Household Hazardous Waste Collection Facility: a vegetated roof, a gravel infiltration trench along the employee parking area, gravel driving strips, a bioretention swale, and two cisterns. The City of Chicago partnered with Friends of the Chicago River to provide a public outreach campaign that included signage and brochures, press releases and presentations to the public. The North Branch Chicago River and Lake Michigan are included on Illinois’ 303(d) list. This project executed nonpoint source pollution control recommendations of a watershed-based plan for the North Branch Chicago River. Project Location:

Cook County

178

Subgrantee: City of Chicago, Department of General Services 30 North La Salle Chicago, Illinois 60602 Project Reports and Other Informational Materials: “City of Chicago Best Management Practices Implementation – Final Report.” July 17, 2007. City of Chicago. BMP Implementation Summary: BMP Code 012 011 835 845

BMP Name Cistern Green Roof Urban Filter Strip Infiltration Trench

Amount 2 (no.) 0.14 ac. 0.08 ac. 2 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? ? ? ? ? 1 2 ? 1 2

05-01(319)CD

Title: Nonpoint Source Pollution Control Program Evaluation Purpose: This project developed a strategy for the creation of social indicators to use to help determine the effectiveness of Illinois EPA’s Section 319 program and other conservation programs and projects. Implementation of the strategy resulted in a list of potential indicators and potential tools, a set of final indicators including a core subset consistent with USEPA indicators, and a “tool kit.” Project Location:

Statewide

Subgrantee: Board of Trustees of University of Illinois Office of Sponsored Programs and Research Administrators 1901 South First Street (Suite A) MC-685 Champaign, Illinois 61820-6242 Project Reports and Other Informational Materials: “Nonpoint Source Pollution Control Program Evaluation (Social Indicators) – Final Report.” June 30, 2008. University of Illinois. 05-02(310)CD

Title: Lincoln Park Zoo South Pond Environmental Education Project Purpose: This project used the South Pond to educate visitors of the Lincoln Park Zoo about the issues related to water quality and non-point source pollution. The project included programs that range from highly interactive projects (Education Kits for teachers) to family oriented (story books for children) to fascinating multi-media projects (video and curiosity carts). ‘Curiosity Carts’ are rolling activity carts,

179

designed around a specific theme. Zoo docents take a cart on to Zoo grounds and engage the public in hands-on activities for brief but meaningful interpersonal education about water quality issues. Educational Loan Kits are for take-away education projects extending lessons from the Zoo to classrooms or homes outside the Zoo. Teachers, parents, or other group leaders who visit the Pond can check out a kit and take it with them to use with other classes or groups at home. A children’s book was developed to tell the story of the ecological history of the shoreline and the pond from the point of view of a 250-year-old tree on the bank of the south pond. Additionally, to reach a somewhat older audience, a short educational video was produced on the ecological history of the South Pond. Project Location:

Cook County

Subgrantee: Lincoln Park Zoo 2001 North Clark Street Chicago, Illinois 60614 05-03(319)BL

Title: Streambank Erosion Control in the Lake Galena Watershed Purpose: This project reduced nonpoint source (NPS) pollution delivery to Lake Galena (ILRMM) through the installation of best management practices (BMPs) adjacent to the lake and within the watershed. BMPs were used to stabilize 7,130 feet of streambank, 200 feet of stream channel, and 1,585 feet of roadway culverts and drainage ditches. Two stormwater wetlands and one sediment basin were also constructed. Project Location:

JoDaviess County

Subgrantee: Galena Territory Association 2000 Territory Drive Galena, Illinois 61036 Project Reports and Other Informational Materials: “Lake Galena Watershed Project - Phase II - Final Report.” July 2009. Galena Territory Association. 05-04(319)ST

Title: Working with the Amish Purpose: The Douglas County Soil and Water Conservation District assisted and educated the Amish Community in the use of non-till conservation practices to reduce nonpoint source pollution and improve water quality. Specialty farm equipment for implementing no-till farming practices was purchased and made available on a rental basis to the Amish community. The project also included a community

180

outreach initiative to create contacts with the Amish community in and around the Arthur-Arcola communities to educate them on the use of no-till practices and how it will help reduce nonpoint source pollution, enhance water quality, improve and protect habitat, and improve the quality of life. Project Location:

Douglas County

Subgrantee: Douglas County Soil & Water Conservation District 900 South Washington Street Tuscola, Illinois 61953 Project Reports and Other Informational Materials: “Working with the Amish – Final Report.” September 2009. Douglas County Soil & Water Conservation District. 05-05(310)ST

Title: Manure Management Options for Swine Producers to Reduce NPS Pollution Purpose: This project completed and fully operationalized a production-scale integrated livestock waste management demonstration site. The project demonstrated improved best management practices that result in reduced nonpoint source pollution and improved water quality. Educational materials were designed to inform farmers, educators, and the general public about the impacts of nonpoint source pollution originating from the land application of manure on ground and surface water and how and how it can be reduced. The project reduced the nonpoint source pollution potential of the Illinois State University Farm-Lexington livestock operation of (1,000 A.U. approximately) to Turkey Creek, a tributary to the Mackinaw River. Project Location:

McLean County

Subgrantee: Illinois State University (LUW Team) 5020 AGR Normal, Illinois 61790-5020 Project Reports and Other Informational Materials: “Combining Separation, Nitrification/Denitrification, Composting and Irrigation as a Manure Management Option for Swine Produces to Reduce NPS Pollution.” May 30, 2008. Illinois State University. 05-06(319)JC

Title: Bringing Wetlands to Life Through Restoration and Public Communication

181

Purpose: This project restored a portion of the floodplains of the Des Plaines River (ILG07) and researched significant ecological elements (i.e., hydrologic conditions, water chemistry, and vegetation reestablishment). Wetlands Research, Inc. (WRI) created 6.8 acres of wetland and enhanced 4.22 acres of existing wetland. The performance of the restored wetland was monitored to determine if water quality, hydrology and vegetation characteristics evolved in a manner reflective of a natural wetland. WRI also executed a public communications campaign to educate the public about the values of wetlands, particularly in minimizing non-point source pollution. Project Location:

Lake County

Subgrantee: Wetland Research, Inc. 53 West Jackson Boulevard, #1015 Chicago, Illinois 60604 Project Reports and Other Informational Materials: “Bringing Wetlands to Life Through Wetland Restoration and Public Communication.” June 2009. Wetland Research, Inc. “Growing Wetlands for Clean Water.” (Video) 2008. Wetland Research, Inc. 05-07(319) ST

Title: NRCS Urban Office Technical Assistance Purpose: The Recipient maintained the Community Assistance and Watershed Planning Office to serve the six county northeastern Illinois area. This office provided nonpoint source pollution control related technical assistance to the soil and water conservation districts, planning commissions, county departments, townships and municipalities in northeastern Illinois. In addition to direct technical assistance, the staff of this office provided information/education and training assistance. The major focus of the office was on erosion/sediment control, water quality and natural resource management. Funding under this Agreement was used by the Recipient to support the activities of the Community Assistance and Watershed Planning Office. Project Location:

Counties of Cook, Lake, McHenry, DuPage, Will, and Kane

Subgrantee: USDA - Natural Resources Conservation Service 2118 West Park Court Champaign, Illinois 61820 05-08(319)SR

Title: Patriot's Park Lake Phase 2 Implementation

182

Purpose: The Kingsbury Park District implemented recommendations of the Phase 1 Diagnostic/Feasibility Study completed for Patriot’s Park Lake (ILROY). Implementation included dredging the lake and lake forebay, rehabilitation of the forebay dam, stabilization of 150 feet of streambank, installation of one water and sediment control basin, and stabilization of 1,900 feet of eroding shoreline. Patriot’s Park Lake is tributary to East Fork Shoal Creek (ILOID05). Project Location:

Bond County

Subgrantee: Kingsbury Park District nd 114 North 2 Street Greenville, Illinois 62246 Project Period:

07/28/05 through 07/15/09

Project Reports and Other Informational Materials: “Illinois EPA Phase 2 Implementation Project for Patriot’s Park Lake, Bond County, Il. – Final Completion Report.” March 2009. HDR CWI. 05-09(319)JC

Title: Springdale Cemetery Restoration Project Purpose: This project stabilized 1,905 feet of eroding streambank on Springdale Creek, a tributary to Illinois River (ILD30), through the installation of riprap, gabions, log barbs, rock check dams, stone pool and riffle structures, and the installation of native vegetation. The project also included an education component. Project Location:

Peoria County

Subgrantee: Tri-County Regional Planning Commission 411 Hamilton Blvd., Suite 201 Peoria, Illinois 61602 Project Reports and Other Informational Materials: “Springdale Cemetery Restoration Project – Final Report.” Regional Planning Commission.

December 2008.

Tri-County

05-10(319)ST

Title: Stream Corridor Restoration Project - Phase 3 (Trib. 6) Purpose:

This project installed streambank stabilization best management practices (BMPs) to improve water quality, reduce nonpoint source pollution, and enhance aquatic habitat along a section of Tributary # 6 (Hobson Creek), a tributary of the East Branch of the DuPage River (ILGBL10). The project involved the 183

installation of approximately 858 linear feet of BMPs (i.e., A-jacks, rock vortex weirs, bank re-shaping, cobble, fiber roll, and vegetation) on Tributary # 6 to stabilize eroded streambanks, reduce nonpoint source pollution, establish a 0.37 acre riparian buffer, enhance habitat and aesthetics, and provide other beneficial hydrologic functions. The East Branch DuPage River was a Category 1 watershed in the Unified Watershed Assessment and is included on Illinois 303d list. The TMDL and implementation plan for the East Branch DuPage River are complete. Project Location:

DuPage County

Subgrantee: Hobson Creek Community Council 23W420 Country Court Naperville, Illinois 60540 Project Reports and Other Informational Materials: “Hobson Creek Corridor Restoration Project, Phase 3 Tributary 6 to the East Branch DuPage River – Section 319 Project Report.” December 2008. Living Waters Consultants, Inc. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 858 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 49 49 100

05-11(319)ST

Title: Poplar Creek Watershed Planning, Restoration, & Protection Purpose: This project developed a watershed-based plan for the Poplar Creek (ILDTG02) watershed that was designed to improve water quality by controlling nonpoint source pollution. The plan is consistent with the USEPA watershed based plan guidance dated August 26, 2003 (as revised), Illinois EPA draft “Guidance for Developing Watershed Implementation Plans in Illinois” (IEPA/BOW/98-002 – March 1998), total maximum daily load (TMDL) implementation plan requirements, and current watershed planning. Poplar Creek is a tributary of the Fox River. Project Location:

Cook County

Subgrantee: Northeastern Illinois Planning Commission 222 South Riverside Plaza, Suite 1800 Chicago, Illinois 60606-6097 Project Reports and Other Informational Materials: “Poplar Creek Watershed Action Plan.” July 2007. Chicago Metropolitan Agency for Planning. 05-13(319)SR

184

Title: Armitage Creek Streambank Stabilization Purpose: This project stabilized approximately 6,200 feet of eroding streambanks along a 4,100 foot segment of Armitage Creek, a tributary of the East Branch DuPage River (ILGBL10), located between Placid Road and Winthrop Avenue in Glendale Heights, Illinois. Streambanks were stabilized using stone toe stabilization, gabion, timber wall, slope re-grading, minor clearing of non-native vegetation, and revegetation of banks with native wetland plugs and seed. Project Location:

DuPage County

Subgrantee: Village of Glendale Heights 300 Civic Center Plaza Glendale Heights, Illinois 60139 Project Reports and Other Informational Materials: “Armitage Creek Stabilization Project Final Report.” November 2007. Christopher B. Burke Engineering West, Ltd. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 6,200 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 170 144 290

05-14(319)SR

Title: Watershed Based Plan Development for 303(d) Listed Waters Purpose: This project assisted watershed groups in preparing or upgrading six (6) watershed based plans to improve water quality by controlling nonpoint source pollution. The watershed based plans were designed to meet USEPA's nine minimum elements. Plans were prepared for Bear Creek (ILKI02), Lake Vermilion (ILRBD), Eagle Creek (ILATE01), Spring Lake (ILRDR), Lake Bloomington (ILRDO), and Big Bureau Creek (ILDQ01). Project Location:

Adams, Bureau, Hancock, Gallatin, McDonough, & McLean Counties

Subgrantee: Association of Illinois Soil & Water Conservation Districts 4285 North Walnut Street Road Springfield, Illinois 62707 Project Reports and Other Informational Materials: “Greater Bear Creek Area Watershed Plan.” July 2008. Greater Bear Creek Area Watershed Local Planning Committee, Adams County SWCD, and Hancock County SWCD.

185

“Big Bureau Creek Watershed Based Plan.” August 5, 2008. Bureau County SWCD. “Lake Bloomington Watershed Plan.” June 17, 2008. McLean County SWCD. “Watershed Implementation Plan for Lake Vermilion and the North Fork Vermilion River, Vermilion County, Illinois.” June 2008. Vermilion County SWCD. “Spring Lake Watershed Plan.” July 2008. McDonough County SWCD. “Eagle Creek Watershed Plan.” August 11, 2007. Gallatin County SWCD. 05-15(319)CD

Title: Carlinville Lake Watershed Plan Purpose: This project conducted a Phase I diagnostic-feasibility study of Carlinville Lake (ILRDG ) and developed a watershed-based plan for the Carlinville Lake watershed designed to improve water quality by controlling nonpoint source pollution. The plan is consistent with the USEPA watershed based plan guidance dated August 26, 2003 (as revised), Illinois EPA draft “Guidance for Developing Watershed Implementation Plans in Illinois” (IEPA/BOW/98-002 – March 1998), total maximum daily load (TMDL) implementation plan requirements, and current watershed planning principles. Project Location:

Macoupin County

Subgrantee: City of Carlinville 550 North Board Carlinville, Illinois 62626 Project Reports and Other Informational Materials: “Watershed Plan & Phase 1 Diagnostic/Feasibility Study for Lake Carlinville, Macoupin County, Illinois.” HDR/CWI Consulting Engineers & Scientists. 05-16(319)ST

Title: Governor Bond Lake Shoreline Stabilization No. 1 Purpose: This project installed best management practices along 4605 linear feet of shoreline on Governor Bond Lake (ILROP) to arrest shoreline erosion and reduce nonpoint source pollution while protecting or enhancing habitat and aesthetic qualities. The installation of shoreline stabilization practices was consistent with the recommendations of the Clean Lakes Diagnostic/Feasibility Study and the Governor Bond Lake Total Maximum Daily Load (TMDL) implementation plan. Shoreline stabilization practices included revetments and offshore breakwaters using riprap and vegetation.

186

Project Location:

Bond County

Subgrantee: City of Greenville 404 South 3rd Street Greenville, Illinois 62246 Project Reports and Other Informational Materials: Project Evaluation and Final Report - Governor Bond Lake Shoreline Stabilization No. 1.” February 2007. City of Greenville. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 4,605 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 203 172 344

05-17(319)ST

Title: Jackson Creek Watershed Planning Purpose: This project assisted the Will County Stormwater Management Planning Committee in compiling a comprehensive watershed resource inventory and developing a watershed-based plan for the Jackson Creek (ILGC02) watershed, a sub-watershed of the Des Plaines River. This inventory assessed the use impairments of water resources along with the causes and sources of the impairments. The watershedbased plan was designed to reduce nonpoint source pollution, enhance water quality, improve and protect habitat, and improve the quality of life. Project Location:

Will County

Subgrantee: Will County Stormwater Management Planning Committee 302 North Chicago Street Joliet, Illinois 60432 Project Reports and Other Informational Materials: “Jackson Creek Watershed Plan – Technical Report.” Agency for Planning.

April 2009.

Chicago Metropolitan

05-18(319)ST

Title: Technical Assistance for Green Infrastructure Projects Purpose: This project developed two web-based models and a valuation model that encourage the strategic use of green infrastructure (wetlands, trails, greenways, trees, mature landscaping, etc.) to reduce costs for stormwater management and

187

improve water quality, as well as improved habitat for native flora and fauna and increased recreation and open space opportunities. Project Location:

Cook County

Subgrantee: Center for Neighborhood Technology 2125 West North Avenue Chicago, Illinois 60647 Project Reports and Other Informational Materials: “Technical Assistance for Green Infrastructure Projects – Final Report.” December 12, 2006. Center for Neighborhood Technology. 05-19(310)JC

Title: Salt Creek Streambank Stabilization Purpose: This project stabilized eroding streambanks along a segment of Salt Creek (ILGL09) located between State Route 53 and Algonquin Road and a segment located at Fox Lane in Rolling Meadows, Illinois. Approximately 3,278 feet of streambank was stabilized using stone toe with vegetated slopes, stone toe with emergent deep rooted vegetation, and clearing of non-native vegetation, minor regarding and revegetation of banks with native deep-rooted grasses and forbes. Project Location:

Cook County

Subgrantee: City of Rolling Meadows 3600 Kirchoff Road Rolling Meadows, Illinois 60008 Project Reports and Other Informational Materials: “Salt Creek Streambank Stabilization Stage 3 – Project Final Report.” May 2009. Wills Burke Kelsey Associates, Ltd. 05-20(319)SR

Title: Kinkaid Lake TMDL Best Management Practices Implementation Purpose: This project involved the construction of three sediment/nutrient detention basins, stabilization of 900 lineal feet of gully erosion, and the stabilization of 3,000 lineal feet of shoreline erosion in the Kinkaid Lake (ILRNC) watershed. All practices were designed to reduce nonpoint source pollution and improve water quality. A public outreach and education campaign was also implemented to create citizen awareness of actions that can positively affect local water quality. Project Location:

Jackson County 188

Subgrantee: Kinkaid-Reed’s Creek Conservancy District 1763 Water Plant Road Murphysboro, Illinois 62966 Project Reports and Other Informational Materials: “Project Evaluation & Final Report – Kinkaid Lake TMDL Best Management Practices Implementation.” August 2007. Kinkaid-Reed’s Creek Conservancy District. BMP Implementation Summary: BMP Code 350 410 580

BMP Name Sediment Basin Grade Stabilization Structure Streambank/Shoreline Protection

Amount 3 (no.) 15 (no.) 3,000 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 637 6 13 309 309 617 1147.9 1147.9 2295

05-21(319)CD

Title: DuPage R. & Salt Cr. TMDL Implementation Project Purpose: This project collected additional data to facilitate implementation of total maximum daily loads (TMDL) developed for Salt Creek (ILGL09) and the East and West Branches of the DuPage River (ILGBL02 & ILGBK01). A full time staff person was hired to act as the nonpoint source (NPS) TMDL coordinator for the project. Multiparameter probes were purchased and deployed to expand dissolved oxygen monitoring activities. Monitoring data was entered into Illinois EPA’s Assessment Data Base (ADB) and USEPA’s STORET. A baseline study of the fish, macroinvertebrates, and habitat features was conducted on Salt Creek, the East and West Branches of the DuPage River, and their tributaries. A feasibility study was performed to evaluate the removal or modification of dams, or the construction and operation of in-stream aeration projects or other non-structural process for the purpose of reaching the water quality target of the TMDLs. The need for a NPS phosphorus reduction study, chlorine reduction study, and stormwater management study was also investigated. Project Location:

DuPage and Cook Counties

Subgrantee: The Conservation Foundation 10S 404 Knoch Knolls Road Naperville, Illinois 60565 Project Reports and Other Informational Materials: “Stream Dissolved Oxygen Improvement Feasibility Study for the East Branch of the DuPage River.” December 2008. HDR Engineering, Inc.

189

“Biological and Water Quality Study of the East and West Branches of the DuPage River and Salt Creek Watersheds.” December 2008. Center for Applied Bioassessment and Biocriteria Midwest Biodiversity Institute. “DuPage River and Salt Creek TMDL Implementation Project – Final Report.” September 15, 2009. DuPage River Salt Creek Workgroup. 05-22(319)CD

Title: Monroe County Recharge Area Delineation Purpose: This project developed a monitoring strategy for groundwater tracing investigations, including background sampling, sampling schedules, equipment and materials to be used and proposed sampling stations. The monitoring strategy was implemented to delineate the recharge areas for Frog Spring, Luhr Spring, Dual Spring and Annbriar Spring, north of Fountain Creek (ILJH03). Recharge delineation maps were developed and other information provided, as found during the delineation process, to help regional and local land-use planners on where nonpoint source pollution is potentially entering the groundwater system. Two one-day Karst short course workshops for local resource managers as well as community and county officials were held to refresh attendees on basic karst concepts, disseminate the results and implications found in the recharge area delineations, present the recent designation of Class III Groundwater and the need for and ways and means of protecting groundwater systems. Project Location:

Monroe County

Subgrantee: Southwestern Illinois RC&D, Inc. 406 East Main Street Mascoutah, Illinois 62258 Project Reports and Other Informational Materials: “Monroe County Recharge Area Delineations – Final Report.” June 2009. Ozark Underground Laboratory. 05-23(319)CD

Title: Four Winds Way Creek Rehabilitation Purpose: This project restored 500 feet of failed streambank stabilization practices installed on Four Winds Way Creek, a tributary of the Fox River (ILDT20). Rehabilitation was designed to arrest streambank erosion and reduce nonpoint source pollution through the installation of environmentally sound practices while protecting or enhancing habitat, ameliorating damage from peak flows, reducing velocity of peak flows, and enhancing aesthetic qualities.

190

Project Location:

Kane County

Subgrantee: Kane County Department of Environmental Management 719 Batavia Avenue Geneva, Illinois 60134 Project Reports and Other Informational Materials: “Project Report for the Four Winds Way Creek Rehabilitation Project.” August 28, 2008. Kane County Department of Environmental Management. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 500 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 0 0 0

05-24(319)SR

Title: Green Roof Installation Project Purpose: This project installed a 3,092 square foot green roof on the building located at 8 West Monroe in Chicago, Illinois to reduce stormwater runoff and nonpoint source pollution. The green roof reduces the amount and the rate of stormwater runoff entering the combined sewer system thereby reducing the potential for stormwater surges to exceed sewer system capacity and discharge untreated stormwater and municipal sewage into the South Branch Chicago River (ILHC01). The green roof technology used for this project was GreenGrid, 2’x2’x4” module containers containing a growing medium and plant material. An outdoor sign, educational display, and on-line and paper flyers were also developed. Project Location:

Cook County

Subgrantee: Metropolis Condominium Association 8 West Monroe Chicago, Illinois 60603 Project Reports and Other Informational Materials: “Final Report - Green Roof Installation Project - 8 West Monroe Chicago, Illinois.” June 12, 2009. Metropolis Condominium Association. 05-25 (319)ST

Title: Total Maximum Daily Load Development Purpose: The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within selected watersheds on the 303(d)

191

list through computer modeling. For each watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. 05-(319)AW

FFY06 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Otter Lake BMP Effectiveness Monitoring Project Purpose: This study was designed to assess the effectiveness of the low-flow dam as a best management practice to reduce non-point source inputs to the main body of Otter Lake (ILRDF). The project provided estimates of 1) the amounts of suspended sediment, nitrogen, and phosphorus entering Otter Lake from the West Fork of Otter Creek, 2) the amounts of these constituents that are deposited behind the low flow dam, 3) the amounts of these constituents that are transported through the connection pipe in the dam, 4) and the amounts of these constituents that are transported over the crest of the low-flow dam during high flow events. The quantities of suspended sediment and chemical constituents measured in West Fork Otter Creek were extrapolated to derive an estimate of the total amounts of these constituents entering the lake upstream of the low-flow dam and from all of the watersheds contributing to Otter Lake that have geologic, hydrologic, and topographic characteristics similar to West Fork Otter Creek. From these estimates, the trapping efficiency and long-term retention capability provided by the low-flow dam were estimated. Project Location:

Macoupin County

Subgrantee: U.S. Geological Society 06(319)AW

Title: Waukegan River Water Quality Monitoring Purpose: The Lake County Health Department developed and implemented a monitoring strategy for the Waukegan River to assist in the implementation and update of a comprehensive watershed plan for the Waukegan River (ILQ01). The strategy continued monitoring of flow conditions on the Waukegan River. In-stream monitoring efforts were accomplished by the deployment of Sondes that collected temperature, conductivity, pH, DO, DO percent saturation, and turbidity data. Additional flow monitoring equipment, automatic samplers and collection of water and sediment samples were utilized to provide background information for current and future planning efforts. Project Location:

Lake County

192

Subgrantee: Lake County Health Department & Community Health Center 3010 Grand Avenue Waukegan, Illinois 60085 06-01(319)ST

Title: Animal Waste BMP Program Purpose: This project provided technical and financial assistance to dairy producers in six northwestern Illinois counties: Carroll, JoDaviess, Stephenson, Whiteside, Ogle, and Lee. This region of the state has many small watersheds and dairy operations spread over a large area. The project implemented a variety of best management practices (BMPs) to reduce polluted runoff from feedlots, adjacent lands, contributing roofs and milk house waste from tank cleaning. Practices included tanks, excavation, electrical, plumbing, and pumps to control milk house waste as well as implementation of clean water diversions, clean water roof gutters, critical area shaping and seeding, and spreaders. Project Location:

Counties of Carroll, JoDaviess, Stephenson, Whiteside, Ogle, and Lee

Subgrantee: Blackhawk Hills RC&D Council 102 East Route 30, Suite 2 Rock Falls, Illinois 61071 Project Reports and Other Informational Materials: “Northwest Illinois Livestock Project.” September 2009. Blackhawk Hills RC&D Inc. BMP Implementation Summary: BMP Code 558 559 570 634

BMP Name Roof Runoff Management Roofing for Runoff Control Runoff Management System Wash Water Recovery

Amount 3 (no.) 2 (no.) 1 (no.) 4 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 873.8 4,367.7 ? 338.2 1,693.2 ? 6.1 33.2 ? 738.6 28.6

06-02(319)JC

Title: Streambank Clean Up & Lakeshore Enhancement (SCALE) Purpose: This project provided financial assistance to selected applicants to conduct lakeshore and streambank clean-up events. Local organizations that have previously conducted a lakeshore or streambank clean-up event were eligible to participate. The local sponsor was given up to $3,500 to help conduct their cleanup event. The local sponsor could use the funds for event promotion, event equipment or disposal fees. The project removed over 350 tons of trash from almost 1,500 miles of streams and 350 acres of lakes in Illinois.

193

Project Location:

Statewide

Subgrantee: Not Applicable Project Reports and Other Informational Materials: “Stream Cleanup and Lakeshore Enhancement (SCALE) Program.” Environmental Protection Agency.

April 2009.

Illinois

06-03 (319)CD

Title: Watershed Protection, Restoration, and Education Purpose: This project included four watershed restoration and protection projects as well as watershed-wide project coordination and technical assistance. The Dixie Briggs Fromm Stream Corridor Restoration Project stabilized 2,929 feet of eroding streambanks and bed along a 1,850-foot segment of a small, unnamed stream using 16 riffles, 3 augmented riffles, 10 rock checks, 2 stepped pools, 11 log habitat structures, 4 tree root balls, vegetated geogrid, brush layering, vegetated rock toe, fiber roll, re-shaping of bank slopes. The White's Creek Stabilization Project stabilized eroding streambed and banks along a 1,350-foot segment of White’s Creek (ILDTP01), a tributary of the Fox River (IlDT69) located at Espring Park in Geneva, Illinois. The project involved streambed and bank stabilization (coir fiber mat, vegetated geogrid, fiber logs, re-grading, and re-vegetation), establishing a wider natural stream buffer, re-establishing meanders in the low flow channel, creating floodplain terraces that are more accessible to stream flows, and installation of in-stream habitat features such as riffles and gravel substrate. The City of Aurora constructed a stormwater wetland bio-swale, five rain gardens, and a bio-filtration facility to receive and treat runoff before discharging into the Fox River. The City of Aurora also developed a Naturalized Stormwater Management Corridor Plan to control nonpoint source pollution and conducted education and outreach efforts to inform the community about nonpoint source pollution and to encourage residents and land owners to seek technical assistance for stormwater best management practices. The Village of Wheeling stabilized 6,260 feet of eroding streambank along the northern third of Buffalo Creek/Wheeling Drain Ditch (ILGS01), a tributary of the Des Plaines River. Project Location:

Counties of Kane & DuPage

Subgrantee: Northeastern Illinois Planning Commission 233 South Wacker Drive, Suite 800 Chicago, Illinois 60606 Project Reports and Other Informational Materials: “Fox River and Des Plaines River Watershed Protection, Restoration & Education.” July 2010. Chicago Metropolitan Agency for Planning.

194

http://www.co.kane.il.us/kcstorm/dixieBriggs/index.asp http://www.aurora-il.org/green/infrastructure/index.php http://www.aurora-il.org/green/infrastructure/stormwater_toolkit.php BMP Implementation Summary: BMP Code 013 800 845 580 584

BMP Name Rain Garden Urban Stormwater Wetland Infiltration Trench Streambank/Shoreline Protection Stream Channel Stabilization

Amount 5 (no.) 1 (no.) 1 (no.) 6,260 ft. 4,279 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 0 5 ? 3 10 ? 2 0 639 639 1,278 256 256 504

06-04(319)SR

Title: Metra Parking Lot Expansion BMPs Purpose: This project installed best management practices (BMPs) to reduce nutrient and pollutant loading to Lake Sedgewick (ILRGZZ). The BMPs included a stormwater wetland polishing system and street sweeping. As part of the project, an interpretive sign was created and installed to enhance the public’s knowledge of non-point source pollution and the BMPs. Lake Sedgewick is included on Illinois 303d list. The installation of BMPs was consistent with the recommendations of the Clean Lakes Diagnostic/Feasibility Study prepared for Lake Sedgewick. Project Location:

Cook County

Subgrantee: Village of Orland Park 14700 S. Ravinia Avenue Orland Park, Illinois 60462 Project Reports and Other Informational Materials: “Metra Parking Lot Expansion Sequenced Best Management Practices – Final Report.” February 2010. Village of Orland Park. BMP Implementation Summary: BMP Code 017 800

BMP Name Street Sweeping Urban Stormwater Wetland

Amount 1 (no.) 1 (no.)

06-05(319)CD

195

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 1 0 ? 4 31

Title: North Branch Watershed Project – Phase 5 Purpose: This project implemented additional Best Management Practices (BMPs) in accordance with the North Branch Watershed Management Plan in Lake County. BMPs included streambank stabilization, wetland restoration, gully stabilization, bioswales, and permeable paving. The North Branch of the Chicago River is composed of three forks: the West Fork, Middle Fork, and the Skokie River. All three forks as well as six lakes and ponds in the watershed are listed as impaired waters on Illinois’ 303(d) list. This project executed nonpoint source pollution control recommendations of a watershed-based plan for the North Branch Chicago River. Project Location:

Lake County

Subgrantee: Lake County Stormwater Management Commission 333 Peterson Road Libertyville, Illinois 60048 Project Reports and Other Informational Materials: North Branch Watershed Project Implementation – Phase 5 – Final Report.” March 30, 2010. Lake County Stormwater Management Commission. BMP Implementation Summary: BMP Code 890 410 835 580 657

BMP Name Porous Pavement Grade Stabilization Structure Urban Filter Strip Streambank/Shoreline Protection Wetland Restoration

Amount 0.19 ac. 7 (no.) 0.37 ac. 610 ft. 4.77 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 1 6 63 53 107 ? 3 5 23 23 46 ? 68 234

06-06(319)CD

Title: Permeable Lot Best Practices Project Purpose: The Peggy Notebaert Nature Museum constructed a porous pavement parking lot that will be used to teach the public that this practice is an effective way to minimize nonpoint source (NPS) pollution. This project was part of a larger greening initiative at the Museum and built on past Section 319 projects. Interpretive signage was developed and installed to educate the public about nonpoint source pollution and the benefits of porous pavement. Lincoln Park North Pond is included on Illinois’ 303(d) list. The installation of porous pavement was consistent with the recommendations of the Clean Lakes Diagnostic/Feasibility Study prepared for Lincoln Park North Pond (ILQZX). Project Location:

Cook County

196

Subgrantee: The Peggy Notebaert Nature Museum 2430 Cannon Drive Chicago, Illinois 60614 Project Reports and Other Informational Materials: “Permeable Lot Best Practices Project – Final Report.” July 2008. The Chicago Academy of Sciences and its Peggy Notebaert Nature Museum. BMP Implementation Summary: BMP Code 890

BMP Name Porous Pavement

Amount 0.19 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 0 2

06-07(319)ST

Title: Adventures with Aqua Purpose: The Zoological Society created a new exhibit to provide Brookfield Zoo’s visitors with a hands-on experience that will help them learn about watersheds and nonpoint source pollution. Adventures with Aqua is an outdoor adventure game that makes people think about how their daily routines impact their watersheds. The activity provides a learning experience for the whole family. Salt Creek is a Category 1 watershed in the Unified Watershed Assessment and is included on Illinois 303d list. The TMDL and implementation plan for Salt Creek are complete. Project Location:

Cook County

Subgrantee: Chicago Zoological Society 3300 South Golf Road Brookfield, Illinois 60513 Project Reports and Other Informational Materials: “Adventures with Aqua – Final Report.” January 2008. Chicago Zoological Society. 06-08(319)BL

Title: Implementing BMPs in the Mossville Bluffs Watershed Purpose: Best management practices (BMPs) were installed to improve water quality, reduce nonpoint source pollution, and enhance aquatic habitat in urban and forested areas in the Mossville Bluffs watershed, a tributary of the Upper Peoria Lake on the Illinois River (ILD30) in Mossville, Illinois. The project included installation of 14 urban stormwater BMPs (i.e., vegetated buffer strips, rain gardens, etc.), 26,068 feet of biotechnical ravine stabilization BMPs (i.e., log check dams, gabions, etc.), and the

197

application of forest BMPs (i.e., thinning of invasive species and prescription woodland burning) on approximately 278.46 acres. Project Location:

Peoria County

Subgrantee: Tri-County Regional Planning Commission 411 Hamilton Boulevard, Suite 201 Peoria, Illinois 61602 Project Reports and Other Informational Materials: “Implementing Best Management Practices in the Mossville Bluffs Watershed – Final Report and Project Evaluation.” September 2009. Tri-County Regional Planning Commission. BMP Implementation Summary: BMP Code 013 350 408 410 800 835 840 845

BMP Name Rain Garden Sediment Basin Forest Land Erosion Control System Grade Stabilization Structure Urban Stormwater Wetland Urban Filter Strip Grass Lines Channels Infiltration Trench

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 5 (no.) ? 3 16 3 (no.) ? 2 11 278.46 ac. 16,259 12,252 24,615 193 (no.) 34,221 34,221 68,448 1 (no.) ? 1 6 0.76 ac. ? 1 6 0.3 ac. ? 0 1 1 (no.) ? 1 9

06-09(319)ST

Title: Updating the La Moine River Watershed Management Plan Purpose: This project coordinated the upgrade and development of a watershed-based plan for the La Moine River (ILDG06). Elements included in the update included streambank erosion and livestock. A streambank and gully erosion study along with a livestock inventory were conducted. Additionally, a prioritization model was field verified to identify critical locations for the placement of best management practices. The watershed-based plan addresses the 9 minimum elements required by Section 319 of the Clean water Act. The LaMoine River is included on Illinois’ 303(d) list. Project Location:

Counties of Adams, Brown, Hancock, McDonough, and Schuyler

Subgrantee: Two Rivers RC & D 110 East Fayette Street, P.O. Box 87 Pittsfield, Illinois 62363 Project Reports and Other Informational Materials: “La Moine River Watershed Ecosystem Partnership – Updating the La Moine River Watershed Implementation Plan.” July 31, 2008. Two Rivers RC & D. 06-10(319)JC

198

Title: Water Quality Testing at Countryside Lake Association Purpose: This project allowed the Countryside Lake Association to continue monitoring and assessment activities on Countryside Lake (ILRGQ). This monitoring program continued and enhanced ongoing sampling efforts to document water quality conditions of the lake. Data from this monitoring program was used to access the impacts and changes occurring in the watershed and in and around the lake, which will assist in guiding future best management practices designed to improve water quality by reducing sediment, nutrients and other pollutants while enhancing habitat and aesthetics. Project Location:

Lake County

Subgrantee: Countryside Lake Association 27045 North Maple Road Mundelein, Illinois 60062 Project Reports and Other Informational Materials: “Countryside Lake Water Quality Monitoring Program – Final Report.” AECOM.

November 2009.

06-12(319)ST

Title:

Watershed-Based Plan Development for Aux Sable Creek

Purpose: This project updated the Watershed Management Plan for Aux Sable Creek (ILDW01). The Conservation Foundation and the Aux Sable Watershed Coalition worked with local partners to make sure that the updates address the local concerns. The existing plan (developed in 2001) was updated, expanded, and strengthened to address water quality needs and land use changes occurring in the area. It included a watershed open space plan to assist in land protection to maintain green infrastructure that will lead to restoration and protection of Aux Sable Creek. The project provided education and outreach to elected officials, planning commissions, municipal and county staff, developers and the public to emphasize protection of green infrastructure, promote sustainable development, encourage conservation design, and implement stormwater best management practices to protect water quality. Project Location:

Counties of Kendall and Grundy

Subgrantee: The Conservation Foundation 10 S 404 Knoch Knolls Road Naperville, Illinois 60565

199

Project Reports and Other Informational Materials: “Watershed Based Plan Development for Aux Sable Creek – Project Report.” June 30, 2009. The Conservation Foundation. “Aux Sable Creek Watershed Plan.” June 1, 2009. Wills Burke Kelsey Associates, Ltd. 06-13(319)CD

Title: Kickapoo Creek National Monitoring Project Purpose: This project conducted surface water monitoring of Kickapoo Creek (ILEIE03) to determine the effectiveness of the “Kickapoo Creek Corridor Restoration Project”. Monitoring documented the biological enhancement resulting from the restoration project by determining: 1) effectiveness of the stream restoration in terms of stream fisheries in the restored stream segments, 2) sediment transport through the restored stream segments, 3) construction erosion controls, 4) reduction of stream bank erosion by revegetation, and 5) effectiveness of floodplain wetland restoration in capturing residential runoff after the housing development has been constructed. Data collection and analysis will also include fecal coliform bacteria samples. All monitoring and associated data collected was entered into U. S. EPA’s Nonpoint Source Management System (NPSMS) and U. S. EPA’s STORET system. Project Location:

McLean County

Subgrantee: City of Bloomington 109 East Olive Street Bloomington, Illinois 61701-5219 06-14 (319)JC

Title: Silver Creek Stabilization Purpose: This project stabilized 1,309 feet of eroding streambanks along a segment of Silver Creek (ILGM01), a tributary of the DesPlaines River, located in Melrose Park, Illinois. Streambanks were stabilized using stone toe protection, vegetated geogrid, slope re-grading, minor clearing of non-native vegetation, re-vegetation with native wetland plugs and seed, and riffles. Project Location:

Cook County

Subgrantee: Village of Melrose Park 1000 N. 25th Avenue Melrose Park, Illinois 60160

200

Project Reports and Other Informational Materials: “Silver Creek Streambank Stabilization Project, Phase 2 Tributary to the Des Plaines River – Section 319 Project Report.” June 2009. Living Waters Consultants, Inc. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 1,309 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 202 202 403

06-15 (319)SR

Title: La Moine River Watershed Targeting for NPS Control Purpose: This project provided for the targeting of watersheds to address specific total maximum daily load (TMDL) and resource concerns in the La Moine River (ILDG06) watershed, including East Fork/Spring Lake, Bureau Creek Watershed and the high quality stream segments that needed riparian areas and easements for permanent protection. Project Location:

Counties of Adams, Brown, Hancock, McDonough, and Schuyler

Subgrantee: University of Illinois 1901 South First Street, Suite A Champaign, Illinois 61820 Project Period:

05/28/08 through 09/01/10

06-16 & 06-20(319)SR

Title: Clinton Lake Watershed Social Indicator Effort Purpose: This project developed a strategy to implement a social indicator effort in the

Clinton lake Watershed in DeWitt, McLean, and Piatt Counties. In coordination with the Social Indicator Workgroup, the use of social indicators was fine tuned to better document success of Section 319 project implementation. A watershed outreach program was also conducted to facilitate project implementation. Clinton Lake (ILREI) is included on Illinois’ 303d list. Project Location:

Counties of DeWitt, McLean, and Piatt

Subgrantee: DeWitt County Soil & Water Conservation District Rural Route 4, Post Office Box 344a Clinton, Illinois 61727

201

Project Reports and Other Informational Materials: “Clinton Lake Watershed Social Indicator Effort – Final Report.” December 10, 2009. DeWitt County Soil & Water Conservation District. 06-17(319)CD

Title: Cermak/Blue Island BMP Demonstration Project Purpose: The project installed 30,000 square feet of permeable pavers and 756 square feet of bioswales in the South Branch Chicago River (ILHC01) watershed. The project included an outreach component that focused on rainfall events in urban areas, stormwater runoff and best management practices to reduce nonpoint source and stormwater runoff for the protection of urban waterways. Project Location:

Cook County

Subgrantee: Chicago Department of Transportation 30 North La Salle Street, Suite 500 Chicago, Illinois 60614 Project Reports and Other Informational Materials: “Cermak/Blue Island BMP Demonstration Project – Final Project Report.” September 1, 2010. The Chicago Department of Transportation. BMP Implementation Summary: BMP Code 845 890

BMP Name Infiltration Trench Porous Pavement

Amount 1 (no.) 0.69 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 0 1 ? 0 2

06-18(319)CD

Title: La Moine River Outreach Program Purpose: This project informed the La Moine River (ILDG04) watershed community about nonpoint source pollution and encouraged residents and land owners to implement nonpoint source pollution control best management practices (e.g., buffer and filter strips, livestock exclusion, cover crops, nutrient management). The project promoted best management practice implementation and educated the public on the various forms of nonpoint source pollution, their impacts on the environment, methods for reducing nonpoint source pollution, the importance of water quality protection, and watershed principles. Project Location:

Counties of McDonough, and Warren

202

Subgrantee: Purdue University Department of Forestry and Natural Resources 195 Marsteller Street West Lafayette, Indiana 47907-2093 06-19(319)SR

Title: Total Maximum Daily Load Development Purpose: The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within selected watersheds on the 303(d) list through computer modeling. For each watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. 06-(319)AW

FFY07 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Low Impact Development Techniques in Madison County, Illinois Purpose: This project served as a model for developers and municipalities who are interested in implementing Low Impact Development (LID) Best Management Practices (BMPs) within the county. A complementary project funded by the IDNR C2000 program and introduced by the Southwestern Illinois RC&D developed a Guidance Document for the implementation of Conservation Subdivision design. Using this document, staff provided technical assistance to developers and municipal staff to lead toward the implementation of demonstrative BMPs. This project provided funding to developers to implement LID practices to offset costs over and above traditional design. Project Location:

Madison County

Subgrantee: Southwestern Illinois Resource Conservation and Development, Inc. 406 East Main Mascoutah, Illinois Project Reports and Other Informational Materials: “Low Impact Development Techniques in Madison County, Illinois – Final Report & Project Evaluation.” December 31, 2009. Southwestern Illinois Resource Conservation and Development, Inc.

203

BMP Implementation Summary: BMP Code 580 012 013 800 835 840 845 890

BMP Name Streambank/Shoreline Protection Cistern Rain Garden Urban Stormwater Wetland Urban Filter Strip Grassed Lined Channel Infiltration Trench Porous Pavement

Amount 1,647 ft. 3 (no.) 4 (no.) 2 (no.) 0.04 ac. 0.2 ac. 3 (no.) 0.05 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 472 1 8 ? ? ? ? 0 0 ? 0 2 ? 0 1 ? 0 0 ? 0 0 ? 0 3

07-01(319) ST

Title: Illinois LICA 2007 and 2008 Conservation Expos Purpose: Best management practices (BMPs) were installed at the Illinois Land Improvement Contractors Association’s 2007 and 2008 Conservation Expo. The BMPs installed demonstrated cost-effective techniques that contractors and landowners can use to reduce nonpoint source pollution. Project Location:

Counties of McLean and Macon.

Subgrantee: Illinois Land Improvement Contractors Association, Inc. 118 E. Knoxville Street, P.O. Box 474 Brimfield, Illinois 61617-0474 Project Reports and Other Informational Materials: “Illinois LICA 2007 and 2008 Conservation Expos – Final Report.” October 24, 2008. Illinois Land Improvement Contractors Association, Inc. 07-02(319) CD

Title: Conservation Reserve Enhancement Program (CREP) Assistance Purpose: The Association of Illinois Soil & Water Conservation District (AISWCD) subcontracted with SWCDs to hire staff to facilitate the enrollment process of the Conservation Reserve Enhancement Program (CREP) by setting appointments with producers to discuss CREP and conduct field visits to determine program eligibility. The SWCDs completed the Conservation Reserve Program - 2 form, type the Conservation Plan of Operations, obtained the necessary producer signatures on required documents, and completed all state CREP enrollment forms. The SWCDs coordinated activities associated with land surveys, producer signatures on easements, and recording easements with the local abstract office. Field assistance was provided to the survey and design teams as well as construction assistance by evaluating the construction expenses and completing form AD-862.

204

Project Location:

Statewide

Subgrantee: Association of Illinois Soil & Water Conservation Districts 2520 Main Street Springfield, Illinois 62702 Project Reports and Other Informational Materials: “Illinois River Basin CREP Assistance IEPA 319 Grant Final Report. August 2011. Association of Illinois Soil & Water Conservation Districts. BMP Implementation Summary: BMP Code 612 880 657

BMP Name Tree Planting (612) Permanent Seeding (880) Wetland Restoration (657)

Amount 1,074 ac. 1,418 ac. 52 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 511 814 1,625 653 1,049 2,095 36 54 109

07-03(319) JC

Title: Protecting Water Quality in Urban Centers of Illinois-Phase 2 Purpose: This project maintained and improved water quality in urbanized areas by creating a partnership between urban soil and water conservation districts (SWCDs) and Illinois EPA. Section 319 funds, in combination with local matching dollars or inkind services, were used to undertake special nonpoint source pollution prevention education/information projects aimed at local government land use decision makers and the development community. Grant funds to SWCDs were used to develop the technical capabilities of SWCD staffs to develop and deliver technical educational materials or to conduct educational workshops or seminars. Project Location:

Statewide

Subgrantee: Association of Illinois Soil & Water Conservation Districts 2520 Main Street, Illinois State Fairgrounds Springfield, Illinois 62702 Project Reports and Other Informational Materials: “Protecting Water Quality in Urban Centers of Illinois-Phase 2 – Final Report.” September 16, 2009. Association of Illinois Soil & Water Conservation Districts. 07-04(319) CD

Title: Libertyville Facility BMP Demonstration Project Purpose: This project installed a 180 linear foot bioswale (4,830 sq. ft.), three rain gardens (42,337 sq. ft.), 1,395 linear feet of native plant swales (26,831 sq. ft.), and two

205

stormwater wetlands (10.43 acres) at the Lake County Central Permit Facility. This project implemented and displayed nonpoint source pollution control best management practices at the facility to demonstrate good development practices while protecting Bull Creek (ILGV01). Project Location:

Lake County

Subgrantee: Lake County Administrator’s Office 18 North County Street Waukegan, Illinois 60085 Project Reports and Other Informational Materials: “Lake County Libertyville Facility BMP Demonstration Project.” July 22, 2010. Lake County Stormwater Management Commission. BMP Implementation Summary: BMP Code 013 800 835 845

BMP Name Rain Garden Urban Stormwater Wetland Urban Filter Strip Infiltration Trench

Amount 3 (no.) 2 (no.) 0.61 ac. 1 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 2 13 ? 24 86 ? 2 16 ? 0.5 4

07-05(319)CD

Title: Fox River Stabilization Project Purpose: This project stabilized approximately 2,306 feet of eroding streambanks along a segment of the Fox River (ILDT58) at two highly visible park locations in St. Charles, Illinois. These are Boy Scout Island and St. Mary Park. Streambanks were stabilized with dense, deep-rooted native vegetation and rip rap. Vegetated buffers were also established. Eight “limestone-steppers” were constructed to allow controlled public access to the river and stabilize the eroded paths to the water’s edge. Interpretive signage was installed at each site. Project Location:

Kane County

Subgrantee: St. Charles Park District 8 North Avenue St. Charles, Illinois 60174 Project Reports and Other Informational Materials: “Fox River Stabilization Project – Final Report.” December 2009. Kabbes Engineering, Inc.

206

BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 2,306 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 138 138 277

07-06(319)SR

Title: DuPage River, Salt Creek TMDL Implementation Phase II Purpose: This project contributed to reductions of chloride from urban runoff, increased awareness and implementation of sediment and erosion control and stormwater best management practices at both the professional and residential level and completed the design phase for two projects to improve dissolved oxygen through dam removal/modification and in-stream aeration. This project also continued the funding of a watershed coordinator. The DuPage River and Salt Creek are included on Illinois 303(d) list. The TMDL and implementation plan for the DuPage River and Salt Creek are complete. Project Location:

Counties of DuPage & Cook

Subgrantee: DuPage River/Salt Creek Workgroup 10S 404 Knoch Knolls Road Naperville, Illinois 60565 Project Reports and Other Informational Materials: “DuPage River and Salt Creek TMDL Implementation Phase II – Final Report.” October 31, 2010. The DuPage River Salt Creek Workgroup. 07-07(319) CD

Title: North Branch Watershed Project - Implementation Phase 6 Purpose: This project implemented additional best management practices (BMPs) in accordance with the North Branch Watershed Management Plan in Lake County. The North Branch of the Chicago River is composed of three forks: the West Fork, Middle Fork, and the Skokie River. All three forks as well as six lakes and ponds in the watershed are listed as impaired waters on Illinois’ 303(d) list. This project executed nonpoint source pollution control recommendations of a watershed-based plan for the North Branch Chicago River. Project Location:

Lake County

Subgrantee: Lake County Stormwater Management Commission 333 Peterson Road Libertyville, Illinois 60048

207

Project Reports and Other Informational Materials: “North Branch Chicago River Watershed Project Phase 6 – Final Report.” November 30, 2010. Lake County Stormwater Management Commission. BMP Implementation Summary: BMP Code 011 012 013 580 657 800 840 890

BMP Name Green Roof Cistern Rain Garden Streambank/Shoreline Protection Wetland Restoration Urban Stormwater Wetland Grassed Lined Channel Porous Pavement

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 0.22 ac. ? ? ? 1 (no.) ? ? ? 5 (no.) ? 0 77 13,992 ft. 2,414 871 1,652 4.51 ac. ? 44 237 3 (no.) ? 41 179 1.08 ac. 33 51 101 0.18 ac. ? 11 103

07-08(319) CD

Title: Otter Lake Shoreline Erosion Control Purpose:

This project continued efforts to stabilize Otter Lake (ILRDF) shoreline by dealing with the most eroded areas first using a barge equipped with a conveyor belt to distribute rip rap in these areas. Approximately 14,657 feet of shoreline were stabilized with rip rap and approximately 1,433 feet of shoreline were protected by planting 800 bald cypress trees and 400 hardwood trees along the shoreline. Otter Lake is on Illinois’ Section 303(d) list. Currently the lake and watershed are involved in TMDL development. A watershed-based plan has been developed which identifies the pollutants causing water quality impairments and describes BMPs to be implemented to solve water quality problems.

Project Location:

Macoupin County

Subgrantee: Otter Lake Water Commission 6475 West Montgomery Road P.O. Box 468 Virden, Illinois 62690 Project Reports and Other Informational Materials: “Otter Lake Shoreline Erosion Control Project.” Commission.

November 3, 2009.

Otter Lake Water

BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 16,090 ft. 370 370 744

208

07-09(319) CD

Title: LaMoine Livestock Exclusion Purpose: This project focused on livestock management and associated habitat restoration activities on the LaMoine River (ILDG-04). Producers were selected for the purpose of excluding livestock from critical stream corridors. Each of the stream segments selected fell within a “priority” implementation list from the LaMoine River Watershed Implementation Plan, April 2006. Best management practices included fencing, livestock exclusion, grassed waterways, water and sediment control basins, water source/watering facilities, comprehensive nutrient management planning, pasture/hay planting, and streambank stabilization and wetland restoration. Project Location:

McDonough County

Subgrantee: Prairie Hills RC &D, Inc. 321 University Drive Macomb, Illinois 61455 Project Reports and Other Informational Materials: LaMoine River Livestock Exclusion Project – Final Report.” October 26, 2011. Prairie Hills RC & D, Inc. BMP Implementation Summary: BMP Code 412 638 580 382 472 556

BMP Name Grassed Waterway Water and Sediment Control Basin Streambank/Shoreline Protection Fencing Livestock Exclusion Planned Grazing Systems

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 4 ac. 70 70 140 25,550 ft. 700 384 771 600 ft. 71 71 143 10,509 ft. 37 33 66 182.8 ac. 70 66 128 710.9 ac. 383 507 993

07-10(319) JC

Title: Stabilization of White Pine Drainage Channel Purpose: This project stabilized 3,635 feet of eroding streambanks along a 1,818 foot segment of the White Pine Drainage Channel which discharges into Buffalo Creek (ILGST), a tributary of the Des Plaines River, located between Sycamore Road and Bernard Drive in Buffalo Grove, Illinois. The project stabilized banks and dissipated the energy of water entering the channel. Existing sediment deposits were removed from stream bed to produce a more consistent flow gradient. The channel was lined with an erosion control blanket and turf reinforcement mat with an 18” boulder lining at the toe of slope. The banks and stream edge were re-vegetated with native plants. Sump pump outfalls were lowered and rip rap placed at storm sewer and sump pump outfalls to reduce scour.

209

Project Location:

Cook County

Subgrantee: Village of Buffalo Grove 51 Raupp Blvd. Buffalo Grove, Illinois 60089 Project Reports and Other Informational Materials: “Stabilization and Naturalization of White Pine Drainage Channel.” Bonestroo, Inc.

August 5, 2009.

BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 3,635 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 130 130 262

07-11(319) JC

Title: Kickapoo Creek Corridor Restoration Purpose: The project initiated the restoration of Kickapoo Creek (ILEIE03) and its riparian corridor within the limits of the “Grove on Kickapoo Creek” residential development. The project involved re-meandering and bank stabilization of 2,800 feet of Kickapoo Creek north of Ireland Grove Road, installation of 4.5 acres of riparian wetlands, and revegetation of a 40 acre riparian corridor for Kickapoo Creek designed to stabilize soils, slow runoff and erosion, and prevent stormwater pollutants from entering the creek. The restoration site is in HUC 071300090502 and upstream of a TMDL segment. Project Location:

McLean County

Subgrantee: City of Bloomington 109 E. Olive Street Bloomington, Illinois 61701-5219 Project Reports and Other Informational Materials: “Kickapoo Creek Project – Phase 1 – Final Report.” July 24, 2009. Farnsworth Group Inc. 07-13(319) JC

Title: Glacial Park Center Stormwater BMPs Purpose: This project implemented BMPs to reduce nonpoint source pollution to Nippersink Creek (ILDTK-04) and Wonder Lake (ILRTZC) from the new Glacial Park Center for Environmental Research and Exploration in McHenry County, Illinois. The project

210

included the construction of a 75,983 square foot permeable parking lot and drop off area, a system of rain gardens (10,339 square feet), infiltration trenches (1,100 square feet), level spreaders (221 square feet), and approximately four acres of native prairie/woodland restoration. Interpretive signage, an interpretive display (video), and an informational brochure were developed and installed at the site to educate the public about nonpoint source pollution and the BMPs. Nippersink Creek and Wonder Lake are included on Illinois’ 303d list. A watershed-based plan has been completed. Project Location:

McHenry County

Subgrantee: McHenry County Conservation District 18410 U.S. Highway 14 Woodstock, Illinois 60098 Project Reports and Other Informational Materials: “McHenry County Conservation District Glacial Park Center Stormwater BMPs – Project Report.” May 2011. Conservation Design Forum. BMP Implementation Summary: BMP Code 013 666 845 870 890

BMP Name Rain Garden Woodland Improvement Infiltration Trench Level Spreader Porous Pavement

Amount 3 (no.) 4.1 ac. 2 (no.) 4 (no.) 1.74 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 0.2 0.9 ? 1 2.8 ? 0.5 1.6 ? ? ? ? 1.6 16.3

07-14(319)SR

Title: Clean Water: The Role of Trees and Vegetation Purpose: A one-day forum was held in Moline, Illinois to inform the public about the effective use of trees to filter and absorb nonpoint source pollution. A presentation was also made at three conferences across the state to promote the use of trees for nonpoint source pollution control. Project Location:

Statewide

Subgrantee: Trees Forever 770 7th Avenue Marion, Iowa 52302 Project Reports and Other Informational Materials: “Clean Water: The Role of Trees and Vegetation – Final Report.” March 2011. Trees Forever 07-15(319) BL

211

Title: Mid-Illinois River TMDL Education Purpose: This project involved the compilation of a comprehensive social resource inventory for the Lower Illinois River-Senachwine Lake Watershed, Hydrologic Unit Code 07130001, that described the ability and willingness of landowners, farmers, local units of governments, and other stakeholders to implement specific best management practices recommended by Illinois EPA and USEPA through the TMDL process. The inventory was designed to help guide the Illinois EPA and USEPA in the development of the Illinois River (Peoria Area) TMDL implementation plan to maximize opportunities for plan implementation. The project also implemented a watershed-based education strategy to engage local stakeholders in the TMDL planning process and result in locally derived guidance for Illinois EPA and USEPA to establish problem statements, goals and objectives for the Illinois River TMDL. Project Location:

Counties of Lee, LaSalle, Bureau, Putnam, Marshall, Peoria, Woodford, & Tazewell

Subgrantee: Tri-County Regional Planning Commission 211 Fulton Street, Suite 207 Peoria, Illinois 61602 07-16(319) ME

Title: Geomorphic and In-channel Habitat Assessment of South Kickapoo Creek Purpose: This project conducted detailed geomorphic and biological assessments to target and prioritize the in-stream problems in the main stem and three major tributaries of the South Kickapoo Creek (ILDZ3B) at the Marseilles State and Wildlife Area near Marseilles, Illinois. Assessment activities followed the 2009 Illinois River Basin Ecosystem Restoration Geomorphic Watershed Assessment (IRBGWA) Protocols. Project Location:

LaSalle County

Subgrantee: University of Illinois 2204 Griffith Drive Champaign, Illinois 61820 Project Reports and Other Informational Materials: “South Kickapoo Creek Restoration Project and Addendum - Geomorphic and In-channel Habitat Assessment of South Kickapoo Creek.” November 2011. University of Illinois, Prairie Research Institute, State Water Survey, Center for Watershed Science. 07-17 (319)ST

212

Title: Mackinaw Riverbank Stabilization - Waibel Project Purpose: This project stabilized 400 feet of eroding streambank along a segment of the Mackinaw River (ILDK-12). Streambanks were stabilized using a combination of stone toe protection and stream barbs. Project Location:

Tazewell County

Subgrantee: Tazewell County Soil and Water Conservation District 1440 Valle Vista Blvd., Suite B Pekin, Illinois 61554 Project Reports and Other Informational Materials: “Mackinaw Riverbank Stabilization - Waibel Project.” September 6, 2011. Maurer-Stutz, Inc. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 400 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 299 299 598

07-18(319) CD

Title: Total Maximum Daily Load Development Purpose: The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within selected watersheds on the 303(d) list through computer modeling. For each watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. 07-(319) AW

FFY08 FEDERALLY FUNDED SECTION 319 PROJECTS Title: Illinois Urban Manual Update & NPS Program Assistance Purpose: This project allowed for continued technical, educational, and informational assistance to, and through the county soil and water conservation districts. A Watershed Liaison provided assistance to Illinois EPA regarding water quality issues, program outreach and implementation. This project also systematically updated twenty-five (25) nonpoint source pollution control practice standards contained in the Illinois Urban Manual. The Illinois Urban Manual was updated through the revision of standards that were currently out of date, deletion of those

213

that were obsolete, and inclusion of new standards that had been developed in the growing fields of urban watershed protection and soil erosion and sediment control and water quality research. Project Location:

Statewide

Subgrantee: Association of Illinois Soil & Water Conservation Districts 4285 North Walnut Street Road Springfield, Illinois 62707 Total Project Cost: Federal: State and Local:

$438,501.00 $263,101.00 $175,400.00

Cumulative Expenditure: Federal: State and Local:

$474,011.13 $263,101.00 $210,910.13

Project Reports and Other Informational Materials: “Final Report - Illinois Urban Manual Update & NPS Program Assistance.” April 2012. Nelson Land Management LLC. 08-01(319)SR

Title: Streambank Clean Up & Lakeshore Enhancement (SCALE) Purpose: This project provided financial assistance to selected applicants to conduct lakeshore and streambank clean-up events. Local organizations that have previously conducted a lakeshore or streambank clean-up event were eligible to participate. The local sponsor was given up to $3,500 to help conduct their cleanup event. The local sponsor could use the funds for event promotion, event equipment or disposal fees. Project Location:

Statewide

Subgrantee: Not Applicable Project Reports and Other Informational Materials: Streambank Clean Up & Lakeshore Enhancement (SCALE). Environmental Protection Agency.

February 2011.

Illinois

08-02 (319)CD

Title: Resource Management Mapping Service Purpose: This project continued development and maintenance of the best management practice (BMP) database developed by the University of Illinois and Illinois EPA to geographically track BMPs implemented by the Illinois EPA with funding under Section 319 of the Clean Water Act. In cooperation with the Illinois EPA, the University of Illinois identified and implemented proposed enhancements to the

214

interface, database, and design. To maintain the Illinois EPA database and enable new analytic geo-processing functions of the data, funding was also be used to update and expand Resource Management Mapping Service (RMMS), a website maintained at the University of Illinois to aid public stakeholders in watershed management. Project Location:

Statewide

Subgrantee: University of Illinois 1901 South First Street, Suite A Champaign, Illinois 61820 08-03(319)SR

Title: South Pond Enhancement Demonstration & Education Project Purpose: This project restored the South Pond (ILQZL) at Lincoln Park Zoo in Chicago, Illinois. Existing asphalt walkways and concrete retaining walls, which have deteriorated, were removed and 3,850 feet of pond edge was re-graded and vegetated with pollutant filtering plants. A 10 to 20 foot buffer strip of prairie grasses and other plants was installed between the park and the pond’s shoreline. Asphalt walkways were replaced with a porous boardwalk made of recycled plastic. This project also used South Pond to educate visitors about water quality and non-point source pollution. Educational activities include hiring a part-time South Pond Program Assistant, development and delivery of teacher training workshops, support for the 4th and 5th annual Build and Grow South Pond Science and Project Fairs in 2008 and 2009, a mobile display booth on the South Pond and clean water issues displayed at events around Chicago and the state by staff and volunteers, and presentations at two conferences. Finally, Integrated Lakes Management trained volunteer naturalists and analyzed the results of a water quality monitoring program. Project Location:

Cook County

Subgrantee: Lincoln Park Zoo 2001 North Clark Street Chicago, Illinois 60614 BMP Implementation Summary: BMP Code 580 890

BMP Name Streambank/Shoreline Protection Porous Pavement

Amount 3,850 ft. 0.25 ac.

08-04(319)BL

215

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 8 9 19 ? 1 2

Title: Watershed Capacity Building Purpose: This project provided capacity-building support to a broad audience of watershed organizations to meet a number of their information and training needs. Illinois specific topics were identified by surveying the major stakeholders addressing Illinois water quality issues such as SWCDs, municipalities, Ecosystem Partnerships, watershed groups, universities and others. The list of topics was broken down into three categories: information needs, training, and technology transfer. Additionally, the survey helped determined the best avenue for information distribution for each type of watershed organization and information type being disseminated. A current list of watershed groups/organizations in Illinois was developed. Ten workshops, covering six different topics, were held in various parts of the state. Project Location:

Statewide

Subgrantee: Prairie Rivers Network 1902 Fox Drive, Suite G Champaign, Illinois 61820 Project Reports and Other Informational Materials: “Watershed Capacity Building – Strategy Implementation.” April 2011. Prairie Rivers Network. 08-05(319)CD

Title: Fox River Watershed Restoration and Education Purpose: This project included four watershed restoration and protection projects as well as watershed-wide project coordination and technical assistance. Under the West Dundee Bioinfiltration BMPs project, two bioretention facilities were installed at the end of Oregon Street and Fay Avenue in the Village of West Dundee to receive and treat urban runoff before discharge into the Fox River (ILDT-20). The Norris Woods Creek Stabilization and Water Quality Improvement project stabilized 1,518 feet of eroding streambed in Norris Woods Creek, a tributary to the Fox River (ILDT-58), located in the Norris Woods Nature Preserve in Kane County through the incorporation of small boulders and large cobble into the bed and banks to form a step/pool system that provides secure grade control for the streambed. Consistent with the Poplar Creek watershed-based plan, the South Branch Poplar Creek Action Plan Implementation project stabilized approximately 2,036 feet of eroding streambanks along a 1,080 foot segment of the south branch of Poplar Creek, a tributary of the Poplar Creek (ILDTG02) and the Fox River in Steamwood, Illinois through the use of gabion baskets, coir logs at the toe, slope re-grading, and revegetation of banks with native prairie plugs and seed. The Jelkes Creek Reclamation Project restored a 160-acre site on Jelkes Creek (ILDTZQ-01), a tributary of the Fox River and a “Measure W” watershed, located southwest of the Village of Sleepy Hollow in Kane County, Illinois through the use of best management practices, including vegetated bio-swales, native plant filter strips,

216

wetland filtration basins, and naturalized infiltration basins. included various education components. Project Location:

The project also

Counties of Kane & Cook

Subgrantee: Chicago Metropolitan Agency for Planning 233 South Wacker Drive, Suite 800 Chicago, Illinois 60606 Project Reports and Other Informational Materials: “Fox River Watershed Restoration and Education.” December 2011. Chicago Metropolitan Agency for Planning. BMP Implementation Summary: BMP Code 580 584 13 600 800 845

BMP Name Streambank/Shoreline Protection Stream Channel Stabilization Rain Garden Terrace Urban Stormwater Wetlands Infiltration Trench

Amount 2,036 ft. 1,518 ft. 2 no. 4,000 ft. 8 no. 8 no.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 130 130 260 143 143 287 ? 1 6 ? 0 1 ? 3 9 ? 1 2

08-06(319)SR

Title: Clinton Lake Watershed Purpose: This project began implementation of best management practices (BMPs) to reduce nonpoint source pollution as recommended in the Clinton Lake (ILREI) watershedbased plan. BMPs implemented under this project included approximately 5,290 feet of lake shoreline stabilization using rip rap breakwater with transitional wetland. Project Location:

DeWitt County

Subgrantee: DeWitt County Soil & Water Conservation District Rural Route 4, Post Office Box 344a Clinton, Illinois 61727 Project Reports and Other Informational Materials: “Clinton Lake Watershed – Final Report.” Conservation District.

February 2012.

DeWitt County Soil & Water

BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 5,290 ft.

217

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 2,116 2,116 4,232

08-07(319) ST

Title: Clinton County Livestock Nutrient Management Project Purpose: This project provided cost share assistance to livestock producers to implement best management practices (BMPs) to reduce nitrogen and phosphorus from entering Shoal Creek and Sugar Creek within Clinton County. The Southwestern Illinois RC&D retained the services of a Livestock Waste Technician to work with producers within these watersheds to design BMPs to reduce nutrient loading. Shoal Creek (ILOI08) and Sugar Creek (ILOH01) were included on Illinois’ 303d list. A Total Maximum Daily Load (TMDL) is being prepared for Shoal Creek. Project Location:

Clinton County

Subgrantee: Southwestern Illinois Resource Conservation and Development, Inc. 406 East Main Street Mascoutah, Illinois 62258 Project Reports and Other Informational Materials: “Clinton County Livestock Nutrient Management Project.” Conservancy.

June 13, 2012.

HeartLands

BMP Implementation Summary: BMP Code 590 312 558

BMP Name Nutrient Management Waste Management System Roof Runoff Management

Amount 766 ac. 5 no. 2 no.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? 843 4,567 ? 2,015 9,589 ? 1,124 6,090

08-08(319) JC

Title: Bull Cr./Bull's Brook and Indian Cr. Watershed-Based Plan Implementation Purpose: This project implemented a variety of nonpoint source pollution control projects within the Indian Creek (ILGU02), Bull Creek and Bull Brook (ILGV01) watersheds. Best management practices were identified in the corresponding approved watershed based plans. All practices were designed to reduce nonpoint source pollution and improve water quality. The Lake County Stormwater Management Commission provided project coordination and oversight. Project Location:

Lake County

Subgrantee: Lake County Stormwater Management Commission 333 Peterson Road Libertyville, Illinois 60048

218

Project Reports and Other Informational Materials: “Bull Cr./Bull's Brook and Indian Cr. Watershed-Based Plan Implementation – Final Report.” November 2011. Lake County Stormwater Management Commission. BMP Implementation Summary: BMP Code 580 581 657 10 13 835 840 890

BMP Name Streambank/Shoreline Protection Ditch Stabilization Wetland Restoration Oil and Grit Separator Rain Garden Urban Filter Strip Grass-Lined Channels Porous Pavement

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 14,914 ft. 962.6 617 1,231 150 ft. 16 16 32 0.5 ac. ? 1 2 3 no. ? 1 24 4 no. ? 77 45 0.8 ac. ? 28 180 0.02 ac. ? 0 3 0.035 ac. ? 0 1

08-09(319)CD

Title: BMP Implementation Addressing Highland Silver Lake TMDL Purpose: This project developed a Watershed Based Plan that meets the 9 minimum elements and stabilized 4,130 linear feet of moderate to severely eroded shoreline on Highland Silver Lake (ILROZA), a 550 acre public water supply and recreational lake. Although not financed with Section 319 funding, fencing and alternate watering sources (2 ponds) were installed to prevent livestock from accessing to the lake. These best management practices are consistent with the recommendations of the Clean Lakes Diagnostic/Feasibility Study and the Highland Silver Lake Total Maximum Daily Load (TMDL). Project Location:

Madison County

Subgrantee: City of Highland P.O. Box 218 Highland, Illinois 62249 Project Reports and Other Informational Materials: “Project Evaluation and Completion Report for Highland Silver Lake.” Engineering, Inc.

July 2011.

HDR

“Watershed Plan for Highland Silver Lake Watershed.” July 2011. HDR Engineering, Inc. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 4,100 ft.

08-10(319) JC

219

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 657 657 1315

Title: BMP Implementation Addressing Kinkaid Lake Sedimentation & TMDL Purpose: This project constructed one sediment/nutrient detention basin and stabilized 7,495 lineal feet of eroding shoreline in the Kinkaid Lake (ILRNC) watershed. Shoreline stabilization was accomplished by barge applied rip rap. All practices were designed to reduce nonpoint source pollution and improve water quality. Kinkaid Lake is included on Illinois’ 303d list. A TMDL and Phase 1 Diagnostic / Feasibility Study have been completed for Kinkaid Lake. Project Location:

Jackson County

Subgrantee: Kinkaid-Reed’s Creek Conservancy District 1763 Water Plant Road Murphysboro, Illinois 62966 Project Reports and Other Informational Materials: “Kinkaid Lake TMDL Best Management Practices Implementation – Project Evaluation and Final Report.” November 2010. HDR. BMP Implementation Summary: BMP Code 350 580

BMP Name Sediment Basin Streambank/Shoreline Protection

Amount 1 (no.) 7,495 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 249 51 102 1,900 1,900 3,795

08-11(319) JC

Title: Barrington Area Community Outreach Program Purpose: Working with local partners, this project was designed to support implementation of the Flint Creek (ILDTZS01) watershed-based plan by providing the resources for a series of educational outreach programs for the community. Four, free to the public sessions were hosted that included short presentations on green gardening, low impact development, how local water protection issues have global ramifications, improving the watershed, what homeowners can do to reduce nonpoint source pollution, lake and riparian water protection, and living next to and in harmony with water resources. Project Location:

Counties of Cook & Lake

Subgrantee: Barrington Hills Conservation Trust 17 Oakdene Road East Barrington Hills, Illinois 60010 08-12(319) BL

220

Title: TMDL/Watershed Based Plan Adaptive Implementation Demonstration Project Purpose: This project developed Total Maximum Daily Loads (TMDL) for the Prairie Creek (ILDGZN01), Indian Creek (ILDJFC), and Dago Slough (ILILDJFCA) watersheds. A monitoring strategy was implemented to collect additional flow and water quality data to supplement existing Illinois EPA water quality information for the project area to identify and locate sources of water quality stressors and to serve as a foundation to develop TMDLs. TMDLs were then developed for the watersheds. This project also developed design specifications for the stabilization of 3,740 feet of eroding streambanks on a segment of South Kickapoo Creek (ILDZ3B). Project Location:

Counties of Hancock and Knox

Subgrantee: The Board of Trustees of the University of Illinois 1901 South First Street, Suite A Champaign, Illinois 61820 Project Reports and Other Informational Materials: Load Reduction Strategy and TMDL Final Approved Report - Indian Creek, Dago Slough and Prairie Creek. December 16, 2010. Illinois Environmental Protection Agency. 08-13(319) TS

Title: North Mill Creek Water Quality Study and Watershed Plan Purpose: This project completed a watershed-based plan for the North Mill Creek (ILGWA) watershed, a tributary of Mill Creek and the Upper DesPlaines River. Water quality monitoring was also performed to aid in the decision making process of targeting critical areas for best management practice implementation to reduce nonpoint source pollution. The assessment also acted as the baseline for measuring future changes in water quality. At the time the plan was developed, 11 assessed waterbodies in the watershed were impaired for aesthetic use and/or aquatic life use and were listed on the 303(d) Impaired Waters List. The completed watershedbased plan meets the nine minimum elements. Project Location:

Lake County

Subgrantee: Lake County Stormwater Management Commission 333 Peterson Road, Suite C Libertyville, Illinois 60048 Project Reports and Other Informational Materials: “North Mill Creek-Dutch Gap Canal Watershed-Based Plan.” November 2011. Lake County Stormwater Management Commission.

221

08-14(319)ST

Title: Embarras River Watershed Based Planning Purpose: This project developed a watershed-based plan for the Embarras River (ILBE01) (Hydrologic Unit Code 05120112) that is designed to improve water quality by controlling nonpoint source pollution. The plan is consistent with the USEPA watershed based plan guidance dated October 23, 2003 (as revised), Chicago Metropolitan Agency for Planning’s “Guidance for Developing Watershed Action Plans in Illinois” dated June 2007, total maximum daily load (TMDL) implementation plan requirements, and current watershed planning principles. The City of Charleston worked with local stakeholders to develop an integrated watershed plan for the Embarras River watershed that includes watershed data evaluation and resource inventory along with site specific Best Management Practices recommendations designed to improve water quality by reducing suspended sediment, nutrients and other pollutants while enhancing habitat and aesthetics. Project Location:

Counties of Champaign, Douglas, Edgar, Coles, Clark, Cumberland, Jasper, Crawford, Richland, and Lawrence

Subgrantee: City of Charleston 520 Jackson Avenue Charleston, Illinois 61920 Project Reports and Other Informational Materials: “Embarras River Watershed Management Plan.” October 2011. V3 Companies, LTD and Northwater Consulting. 08-15(319)JC

Title: Clear Creek Watershed Plan Update Purpose: This project developed a watershed-based plan for Clear Creek (ILPZU), a tributary of the Rock River (ILP20), designed to improve water quality by controlling nonpoint source pollution. The plan is consistent with the USEPA watershed based plan guidance dated October 23, 2003 (as revised), Chicago Metropolitan Agency for Planning’s “Guidance for Developing Watershed Action Plans in Illinois” dated June 2007, total maximum daily load (TMDL) implementation plan requirements, and current watershed planning principles. The Lost Nation-New Landing River Conservancy District worked with local stakeholders to develop an integrated watershed plan for the Clear Creek watershed that includes watershed data evaluation and resource inventory along with site specific Best Management Practices recommendations designed to improve water quality by reducing suspended sediment, nutrients and other pollutants while enhancing habitat and aesthetics. Project Location:

Counties of Ogle and Lee

222

Subgrantee: The Lost Nation-New Landing River Conservancy District 205 Cuyahoga Drive Dixon, Illinois 61021 Project Reports and Other Informational Materials: “Clear Creek Watershed Action Plan.” September 30, 2011. Olson Ecological Solutions, LLC. 08-16(319)SR

Title: Watershed Liaison Purpose: Conservation Technology Information Center acted as a liaison between stakeholders, agricultural producers, federal and local partners, and the Illinois EPA in developing and implementing a project that demonstrated the efficacy, value and impact of conservation systems on watersheds and the Illinois’ Nonpoint Source Management Program. The project addressed sedimentation and nutrient loading to the Indian Creek (ILDSPA) watershed in Livingston County through the implementation nutrient management planning and education and outreach activities. Project Location:

Livingston County

Subgrantee: Conservation Technology Information Center 3495 Kent Avenue, Suite J100 West Lafayette, Indiana 47906 Project Reports and Other Informational Materials: “Indian Creek Watershed Project – Final Report.” July 15, 2013. Conservation Technology Information Center. 08-17 (319) TS

Title: Total Maximum Daily Load Development Purpose: The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within selected watersheds on the 303(d) list through computer modeling. For each watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. 08-(319) AW

223

FFY09 FEDERALLY FUNDED SECTION 319 PROJECTS Title: North Fork Vermilion River Project - Phase 4 Purpose: This project addressed sedimentation and nutrient loading to the North Fork Vermilion River (ILBPG05) through the implementation of upland best management practices (i.e., grassed waterways and water and sediment control basins) and through the implementation of streambank stabilization. Approximately 2,935 feet of eroding streambank were stabilized using a variety of practices (i.e., longitudinal peaked stone toe protection, critical area seeding and bank re-shaping, root wad installation, stream barbs, and bendway weirs). An educational component of the project included newsletters, media, and tours to inform residents about the water quality impacts of nonpoint source pollution. Project Location:

Vermilion County

Subgrantee: Vermilion County SWCD 1905-A US Rte 150 Danville, Illinois 61832 Project Reports and Other Informational Materials: “North Fork Vermilion River Project - Phase IV Final Report.” October 2013. Vermilion County Soil and Water Conservation District. BMP Implementation Summary: BMP Code 412 580 638

BMP Name Grassed Waterway Streambank/Shoreline Protection Water and Sediment Control Basin

Amount 17.75 ac. 2,935 ft. 600 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 905 871 1,742 1,426 1,350 2,699 125 125 250

09-01 (319)JC

Title: In-stream Restoration and Monitoring of Kickapoo Creek near Charleston, Illinois Purpose: This project restored 2,000 feet of bank and channel stability in combination with the establishment of deep pool habitats and riffles along a segment of Kickapoo Creek (ILBEN01) near Charleston, Illinois. Post-construction assessment and monitoring activities was performed to evaluate 1) the effectiveness of the installed streambank and channel stabilization measures, 2) bed load sediment transport and in-stream habitat diversity, 3) hydrologic flow, and 4) fish and macroinvertebrates. Project Location:

Coles County

Subgrantee: Illinois Department of Natural Resources

224

Office of Realty and Environmental Planning One Natural Resources Way Springfield, Illinois 62702 Project Reports and Other Informational Materials: “Kickapoo Creek Restoration Project, Charleston, Illinois.” July 1, 2012. Illinois Department of Natural Resources. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 2,000 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 720 612 1,224

09-02 (319)JC

Title: Silver Creek Stabilization Purpose: This project stabilized 2,155 feet of eroding streambanks along a segment of Silver Creek (ILGM01), a tributary of the DesPlaines River, located in Melrose Park, Illinois. Streambanks were stabilized using stone toe protection, vegetated geogrid, slope re-grading, fiber roll toe, minor clearing of non-native vegetation, revegetation with native wetland plugs and seed, rock points, and two riffles. Project Location:

Cook County

Subgrantee: Village of Melrose Park th 1000 N. 25 Avenue Melrose Park, Illinois 60160 Project Reports and Other Informational Materials: “Silver Creek Streambank Stabilization Project, Phase 3.” November 2010. Living Waters Consultants, Inc. BMP Implementation Summary: BMP Code 580

BMP Name Streambank/Shoreline Protection

Amount 2,155 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 296 296 593

09-03 (319)SR

Title: Joliet Junior College Lake Clean-up and Management Purpose: This project installed a variety of best management practices (BMPs) to reduce nutrient and pollutant loading to Joliet Junior College Lake and improve water quality. The project included a 2,050 ft. vegetated bioswale, a 350 ft. wetland swale with stone check dams, and a 1.9 acre stormwater wetland at the downstream end

225

of the bioswales. Fore bays were installed at the entry points to the wetland and also at the wetland outfall. Separators were installed in three locations to treat runoff from parking lots and buildings before it enters the lake. The project also included dredging 7,458 cubic yards of sediment from the lake. The cost of dredging ($268,125) was paid entirely with local funding and used only as match under the project. Joliet Junior College Lake (ILWGZX) is tributary to Rock Run (ILGBAA-01). Project Location:

Will County

Subgrantee: Joliet Junior College 1215 Houbolt Road Joliet, Illinois 60431-8938 Project Reports and Other Informational Materials: “Joliet Junior College Lake Clean-up and Management Project.” July 2011. College.

Joliet Junior

www.jjc.edu/info/lake BMP Implementation Summary: BMP Code 007 010 800 814

BMP Name Dredging Oil and Grit Seperator Urban Stormwater Wetlands Bioswale

Amount 1 (no.) 3 (no.) 1 (no.) 2.5 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? ? ? 7 ? 12 55 ? ? ?

09-04 (319)SR

Title: Holiday Shores Lake Watershed Sediment and Nutrient Reduction Project Purpose: This project installed best management practices (BMPs) to reduce nutrient and sediment pollutant loading to Holiday Shores Lake (ILRJN) and improve water quality. Approximately 4,000 feet of eroding streambank in the lake’s watershed were stabilized. Two sediment basins were constructed on land owned by Holishor Association above the lake on Joulter’s Creek. And 8,000 cubic yards of sediment were dredged from an existing sediment pond located at the north end of the lake. Holiday Shores Lake is included on Illinois’ 303d list and a TMDL for Holiday Shores Lake has been completed. Project Location:

Madison County

Subgrantee: Holishor Association, Inc. 1 Holiday Point Parkway Edwardsville, Illinois 62025

226

Project Reports and Other Informational Materials: Holiday Shores Lake Watershed Sediment and Nutrient Reduction Project. August 30, 2011. Heneghan and Associates, P.C. BMP Implementation Summary: BMP Code

BMP Name

Amount

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.)

350 7 580

Sediment Basin Dredging Streambank and Shoreline Protection

2 no. 2 no. 4,000 ft.

1,250 ? 95

1,065 ? 81

2,130 ? 162

09-05 (319)JC

Title: Flint Creek Watershed Plan Implementation Projects Purpose: This project retrofitted an existing detention basin located at the Lake Barrington Village Hall by replacing existing turf grass with wet and mesic prairie vegetation and constructing vegetated swales along the east side of the parking lot to collect and filter runoff. Signage was placed at the site to explain the water quality and infiltration benefits of the project. Also, an existing three acre pond (pond 4) in the Braymore Hills subdivision was converted into a stormwater wetland through the addition of floating islands of wetland plants to reduce nutrients in the water. Turf grass along the shoreline was replaced with native vegetation to create a 0.4 acre prairie buffer. Enzyme B504 was applied to the entire 20 acre pond system, of which pond 4 is a part, to break down the organic material on the bottom of the ponds, which is a major source of nutrients. Ultrasonic algae control was also used in pond 4. Project Location:

Counties of Lake & Cook

Subgrantee: Citizens for Conservation Flint Creek Watershed Partnership 459 West Highway 22 Barrington, Illinois 60010 Project Reports and Other Informational Materials: “Flint Creek Watershed Plan Implementation Projects – Final Report.” Citizens for Conservation Flint Creek Watershed Partnership.

December 2010.

BMP Implementation Summary: BMP Code 019 027 800

BMP Name Aquatic Herbicide Application Nutrient Inactivation Urban Stormwater Wetland

Amount 3 ac. 1 (no.) 2 (no.)

09-06(319)SR

227

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? ? ? ? ? 3 21

Title: Early Childhood Center Water Quality Improvement Project Purpose: This project installed a variety of best management practices (BMPs) at the Early Childhood Center, a new school in Naperville, Illinois, to reduce nonpoint source pollutant loading to the West Branch of the DuPage River (ILGBK02) and improve water quality. BMPs included rain gardens (20,000 square feet), parking lot bioswales (9,023 square feet), permeable paver bus turn-around area (15,000 square feet), green roofs on portions of the school (1,240 square feet), and a dry bottom detention basin vegetated with native grasses (78,500 square feet). The project also included an education component. Project Location:

DuPage County

Subgrantee: Naperville Community Unit School District 203 203 West Hillside Road Naperville, Illinois 60540 Project Reports and Other Informational Materials: “Early Childhood Center Water Quality Improvement Project.” Company.

February 2011.

Wight &

BMP Implementation Summary: BMP Code 011 013 350 845 890

BMP Name Green Roof Rain Garden Sediment Basin Infiltration Trench Porous Pavement

Amount 0.03 ac. 6 (no.) 1 (no.) 3 (no.) 0.35 ac.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? ? 3 9 ? 3 28 ? 3 9 ? 8 80

09-08(319) CD

Title: West Branch of the DuPage River Improvement Project Purpose: This project reconnected a 4,900 foot section of the West Branch of the DuPage River (ILGBK09) to its floodplain. The stream channel was raised approximately 2.75 feet over the entire project area. In addition, a series of step pool structures were constructed at the downstream end to provide a transition to the existing lower bed elevations off of the project site. Buried rock sills and grade control structures were installed in the stream and were extended out into the flood plain for long-term grade stabilization. The project site is a one mile section of river within the 20 square mile watershed. Project Location:

DuPage County

228

Subgrantee: Forest Preserve District of DuPage County 3 S. 580 Naperville Road Wheaton, Illinois 60187-8761 Project Reports and Other Informational Materials: “West Branch DuPage River Improvement Project – Final Report.” March 1, 2014. Forest Preserve District of DuPage County. BMP Implementation Summary: BMP Code 009

BMP Name Stream Channel Restoration

Amount 4,900 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 2,166 2,166 4,332

09-09(319) CD

Title: Lake Sara Shoreline Protection Project Purpose: This project stabilized 2,967 feet of eroding shoreline along the northern boundary of the Post Oaks Flatwoods Heritage Landmark on Lake Sara (ILRCE), a public water supply lake in Effingham County, Illinois. The shoreline and bluff areas were impacted by severe erosion due to excessive slopes, saturated upland soils and chronic wave actions. Stabilization of the shoreline was accomplished using transitional wetland breakwaters. This project also developed a watershed assessment study to guide future monitoring and planning decisions. Project Location:

Effingham County

Subgrantee: Effingham Water Authority P. O. Box 411 Effingham, Illinois 62401 Project Reports and Other Informational Materials: ““Lake Sara Watershed Assessment Study.” July 15, 2011. Lake Sara Erosion Committee. “Lake Sara Post Oaks Flatwoods Heritage Site Shoreline Bluff Protection Project.” March 5, 2012. Effingham Water Authority BMP Implementation Summary: BMP Code 580

BMP Name Streambank and Shoreline Protection

Amount 2,967 ft.

09-10(319) ST

Title: Implementation of BMPs Addressing Cedar Lake

229

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 1,454 1,454 2,907

Purpose: This project stabilized 2,184 feet of eroding gullies and 10,786 feet of moderately to severely eroding shoreline along Cedar Lake (ILRNE). A water and sediment control basin (WASCB) was also constructed as recommended in the Phase I Diagnostic/Feasibility Report. Project Location:

Jackson County

Subgrantee: City of Carbondale 200 South Illinois Avenue Carbondale, Illinois 62974-9276 Project Reports and Other Informational Materials: “Watershed Needs Evaluation, Clear Lake Watershed, Union and Jackson Counties, Illinois.” August 2011. HDR Engineering. “Project Evaluation and Final Report for the Cedar Lake Implementation Projects, Carbondale, Illinois.” August 2011. HDR Engineering. BMP Implementation Summary: BMP Code 410 638 580

BMP Name Grade Stabilization Structure Water and Sediment Control Basin Streambank and Shoreline Protection

Estimated Load Reduction Sediment Phosphorus Nitrogen Amount (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 61 (no.) 434 434 869 180 ft. 39 24 49 10,786 ft. 2,446 2,446 4,893

09-11(319) ST

Title: Nippersink Watershed Assessment / Watershed Manager Purpose: This project funded a part-time watershed manager in the Nippersink Creek (ILDTK04) watershed. This part-time manager provided technical assistance, planned and coordinated pertinent watershed information, identified potential watershed stakeholders for the project to implement best management practices (BMPs), and organized and coordinated meetings. This project also involved a university administered watershed survey/social science study to guide and assess watershed implementation efforts in the Nippersink Creek and Wonder Lake watersheds. Through voluntary actions of groups and individuals at the local level improvements to water quality through nonpoint source pollution (NPS) control will occur. The watershed survey/social science study will guide the local watershed planning committee to further water quality improvement in this watershed. Project Location:

McHenry County

Subgrantee: Nippersink Watershed Association P.O. Box 168 Wonder Lake, Illinois 60097

230

Project Reports and Other Informational Materials: “Final Report for Nippersink Creek Watershed FY2009 Grant Cycle.” Nippersink Watershed Association.

February 2012.

09-13(319) SR

Title: BMP Implementation in Fulton and McDonough Counties, Illinois Purpose: This project improved water quality by significantly reducing sediment and nutrient loads from gully erosion in two targeted La Moine River Ecosystem Partnership subwatersheds. Sixteen water and sediment control basins and one diversion were implemented in Fulton and McDonough counties on gullies contributing high sediment and nutrient loadings in Otter Creek (ILDI02) and Camp Creek (ILDGI01) watersheds. Project Location:

Fulton and McDonough Counties

Subgrantee: Two Rivers RC & D Post Office Box 87 Pittsfield, Illinois 62363 Project Reports and Other Informational Materials: “BMP Implementation in Fulton & McDonough Counties, Illinois.” RC&D Area.

July 2012.

Two Rivers

BMP Implementation Summary: BMP Code 362 638

BMP Name Diversion Water and Sediment Control Basin

Amount 300 ft. 6,521 ft.

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 6.9 7 14 196.9 211 419

09-14(319) ST

Title: Kickapoo Creek Corridor Restoration Phase 2 Purpose: This project continued the restoration of Kickapoo Creek (ILEIE04) and its riparian corridor within the limits of the “Grove on Kickapoo Creek” residential development. The project involved re-meandering and bank stabilization of 5,065 feet of Kickapoo Creek north of Ireland Grove Road, installation of 6.5 acres of riparian wetlands, and re-vegetation of a 39 acres of riparian corridor for Kickapoo Creek designed to stabilize soils, slow runoff and erosion, and prevent stormwater pollutants from entering the creek. The restoration site is in HUC 071300090502 and upstream of a TMDL segment. Project Location:

McLean County

231

Subgrantee: City of Bloomington 109 E. Olive Street Bloomington, Illinois 61701-5219 Project Reports and Other Informational Materials: “Kickapoo Creek Project - Phase 2 – Final Report.” July 14, 2011. Farnsworth Group Inc. BMP Implementation Summary: BMP Code 009 800

BMP Name Stream Channel Restoration Urban Stormwater Wetlands

Amount 5,065 ft. 5 (no.)

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) 130 130 258 ? 77 290

09-15(319) JC

Title: Roosevelt Park Stormwater BMPs and Education Purpose: This project constructed a 6,900 sq. ft. permeable parking lot and a rain garden to reduce the discharge of nonpoint source pollution into the South Branch of the Waukegan River (ILQCA01) from Roosevelt Park. An interpretive exhibit describing the BMPs was placed at the parking lot. A 350 foot educational boardwalk with three interpretive exhibits was added to the path around the restored wetland in Roosevelt Park to allow access while avoiding impact on sensitive flora and fauna. The interpretive exhibits will inform the public about nonpoint source pollution, the Waukegan River watershed, and what the public can do to improve water quality. Community workdays were held to involve the public in river cleanups and educate them about the watershed. Maintenance and enhancement measures were also implemented on the restored wetland and woodland areas in Roosevelt Park. Project Location:

Lake County

Subgrantee: Waukegan Park District 2211 Ernie Krueger Circle Waukegan, Illinois 60087 Project Reports and Other Informational Materials: “Roosevelt Park Stormwater BMPs and Education Project.” December 2011. Waukegan Park District. BMP Implementation Summary: BMP Code 575 13 890

BMP Name Stock Trails and Walkways Rain Garden Porous Pavement

Amount 350 ft. 1 no. 0.16 ac.

09-16(319)ST

232

Estimated Load Reduction Sediment Phosphorus Nitrogen (Tons/Yr.) (Pounds/Yr.) (Pounds/Yr.) ? ? ? ? 0 3 ? 0 6

Title: East Branch South Branch Kishwaukee River Watershed-Based Plan Purpose: This project developed a watershed-based plan for the East Branch Kishwaukee River (IL_PQCL-02) watershed (HUC 070900060501, 070900060502, 070900060503, 070900060504), a tributary of the South Branch Kishwaukee River (IL_PQC-02), designed to improve water quality by controlling nonpoint source pollution. The plan was developed to be consistent with the consistent with USEPA watershed-based plan guidance found in Appendix C of the Nonpoint Source Program and Grants Guidelines for States and Territories dated April 12, 2013 (as revised), Chicago Metropolitan Agency for Planning’s “Guidance for Developing Watershed Action Plans in Illinois” dated June 2007, total maximum daily load (TMDL) implementation plan requirements, and current watershed planning principles. The East Branch Kishwaukee River (IL_PQCL-02) watershed contains Sycamore Lake (IL_RPZG), which was on the 303d list. The South Branch Kishwaukee River (IL_PQC-02) was also on the 303d list. Project Location:

DeKalb County

Subgrantee: County of DeKalb 110 East Sycamore Street Sycamore, Illinois 60178 Project Reports and Other Informational Materials: “East Branch of the South Branch Kishwaukee River Watershed-Based Plan." July 2014. Hey and Associates, Inc. 09-17(319) ST

Title: Total Maximum Daily Load Development Purpose: The Illinois EPA developed Total Maximum Daily Loads (TMDLs) and implementation plans for each pollutant within selected watersheds on the 303(d) list through computer modeling. For each watershed, computer models were used to identify a distribution of pollutant loading (allocation) that can be expected to result in the attainment of water quality standards. The methodologies used for TMDL development were documented. Modeling results were used to support the development of implementation plans for TMDL attainment. 09-(319) AW

233

View more...

Comments

Copyright © 2017 PDFSECRET Inc.