October 30, 2017 | Author: Anonymous | Category: N/A
. Marshall. Islands. Mauritania. Mexico. Micronesia. lantau island lao tzu ......
s ub ma r in e cabl e
ALMANAC
18 I S S U E
Voice
of the Industry
While all reasonable steps to verify information from the public domain have been taken, based on changing circumstances and dynamic factors, incomplete information subject to change may exist. Our goal is to periodically update and modify such information. If you have a correction, please let us know by completing our Submarine Almanac Update Form, available by clicking here, or by emailing
[email protected].
FOREWORD
W
elcome to the eighteenth edition of the Submarine Cable Almanac, one of our most popular reference tools. In this issue we updated 154 systems and added 1 new system.
Coinciding with the recent release of our new interactive Submarine Cables of the World online map, we have added a “News” field, where you can find the current news related to a cable system, if available. If you’re interested in finding a specific system, or wish to see all systems in a region, simply type that name or region into the search function. We hope that you, our readers, will participate in this almanac as you’ve done with our previous products. There is always room for additional data, so let us know if there is something else we should include in future editions. Please let us know by completing our Submarine Almanac Update Form, available by clicking here, or by emailing
[email protected].
Submarine Cable Almanac
Finally, I want to thank all of the sponsors, staff and dedicated readers that contributed to this Almanac. Your feedback has been invaluable.
Issue 18 | May 2016
Copyright © 2016 by Submarine Telecoms Forum, Inc. Kristian Nielsen +1 703.444.0845 Vice President www.subtelforum.com
All rights reserved. No part of this book may be used or reproduced by any means, graphic, eletronic, or mechanical, including photocopying, recording, taping or by any information storage retrieval system without the written permission of the publisher except in the case of brief quotations embodied in critical articles and reviews. Submarine Telecoms Forum, Inc. 21495 Ridgetop Circle Suite 201 Sterling, Virginia 20166 USA www.subtelforum.com
Hotellneset
Greenland
Quint illion Subs
ea
Svalbard
Barrow Wainwright
Prudhoe Bay
Andoy
Harstad
Point Hope
Seydisfjordur
Iceland
Fa
ric
Sweden
e-
1
Landeyjarsandur
Umea Vaasa
Danice
Finland
Den mar k -Ru ssia
Lio n Se a
Aranci
Otranto
MINE
HSC S
Pontianak
eMa
GOKI
a
PPC-1
Papua
SMPCS
I-ME
W -3 SM
RF WA
OM
SKKL-JS
Makassar
Madang
Papua New Guinea
Jakarta
Dar es Salaam
MA TA
Surabaja Jember
RA
Mataram
M-K
UP AN
Noro
Point Moresby
G
Waingapu
Van
uatu
AP
Zambia
Sy
LIO
N
Luganville Port Vila
Mauritius-Rodrigues
Mouli Island
Port Hedland
Jacotet
Poindimie
IS UR
M
Go
-1
AT
wa
NN
LA
NT
IS
SA
C
-2
Ha
Melkbosstrand Cape Town
TA
UN
Perth
AT
SA
SAFE
Brookvale Sydney Oxford Falls
Adelaide
L
APX-Central ur lbo
SAFE
ne
Bass Strait 1
Boat Harbour
Austral
Hobart
Santa Cruz Tierra del Fuego
Map Key
Black Line = In Service
Antarctica
Whe Auckla
h int erloc Po Inv ndy Sa
Stanley
Blue Line = Upgraded System
iki
APX-East TASMAN 2
Southern Cross Tasman Global Access
Me
Bass Strait 2
Puerto Montt
Red Line = Planned/Under Construction
iki
Mtunzini Durban
AN
Las Toninas
Punta Arenas
r ou av st s Ea X- Cros AP rn iki uthe Hawa
de
En
So
Maldonado TE
ICN1
wa
Australia
Ha
-2 NG
AP
E
Maputo
Uruguay
Lifou
Noum'ea
Onslow
AW
iki
Baie du
Walvis Bay
South Africa
Argentina
2
wa Ha
EAS
N
st
SEA
W-3
Toliary
-We APX ASC
as
ag
ad
M
r ca
IC
G
ent
Zimbabwe Botswana
Swakopmund
-PN
CN
AJC
Lucira
Mayotte
Florianopolis
Valparaiso
Auki
Kupang
2
Mozambique
SM
Chile
Maluku
eM
Toweli Sulawesi sin
2LaD
Trid
Santos
Marshall Islands
Micronesia
Bandjerma JaKa
ON-
Angola
Namibia
Sao Paulo
aD
Pangkalanbun
Tomasina
Paraguay
Manado
Tandjoeng Ja Ka Sangatta 2L
Indonesia
Ketapang
LI
Benguela
Arica
Rio de Janeiro
EAC-C2C
E1
Kuching
re
Luanda
Namibe
Papeete Moorea
RU
-1
Bintulu
Malaysia
apo
Porto Amboim
Reagan Test Site
Ebeye
NT
Solomons
SAC
Monet
Seabras-1
AMX Globenet
HA
Bolivia
1
Vaitape Uturoa Huahine
il
esiaCS
nd wa na -1
PANAM
una Fut
Wa
llis&
Pago Pago
SAC
iji
SAM-
a-F
mo
n Sa
ca
eri
raz
CS
Micron
US
Best
Davao
Katong Sing
COM
ARC OSSAM 1 -1
SAC
ana Mo
n-B
SA
Tanzania
A-
SE
Kota Kinabalu
Kuantan Me rsing Dumai
Kenya
Mombasa
Nzeto
roo
M
SA
ADONES
st
ss
Ea
Cro
XAP
ern
iki
uth
ss
wa
So
Cro
Ha
ern
H
uth So
AS
me
-1
Salvador
Penang
Mogadishu
Rwanda Burundi
Piti
Palau
la
Medan
JASUKA
Ca
Brazil
SAPL
iji
Am
Democratic Republic of the Congo
Cabinda Soyo
Lima Lurin
Colombo
Uganda
Congo
Pointe Noire
Yap
gkh
ON
ASC
Gabon
lau
Pa
Philippines
on
C
a
Honotu
Samoa
a-F
Libreville
Fortaleza
Peru
mo
na
nta
Salinas
Samoa
Son
FALC
N
Kribi
Sa
dor
Ecua
rum
nd
va
Tri
Tum m
ua
-G
SC
DD
Male
Bata
Puerto Máncora
Somalia
Ethiopia
South Sudan
Central African Republic
Cameroon Douala
S
FE
Eu
Port Harcourt On
e
SC
SA
lali
nk
Main NC
EA SS AA y E1 TE AM S
a
ta Gord
Nigeria
Cotonou Lagos Lome
AC
Accra
G-P
an
law
AJ
PCCS
Abidjan
SEA-US AAG
Capepisa Batangas Pa
PPC-1
C-BUS
cas I
-1
OS-1
M
S
SA
ARC
Ameri
CFX-1
PCC
Pun
1 SAM-
de
av
ou
r
IS-2
En
Côte d'Ivoire
SE
Monrovia
Sihanoukville Vung Tau
G AP MCT
-1
CS
-2
Cayenne
TPC-5
La Union
ay-
rac
Bo
H VG AA CN AP
Freetown
-3
ANT ATL
GLO
WA
SAT
CS
Cochin
G
SJC APCN 2
T-
Ghana Benin Togo
Conakry
t
-S
Georgetown
Djibouti
AAG
AA
SMW -3 APG
Cambodia
Sri Racha
M-T
s II
ne
Da Nang
APCN2
Petchaburi
i2i
AAE-1
China-US C C SJ C-C2 N-IA C EA TGC-C2 EA E AS
Ballesteros
Pyapon
TG N TIS TIC ICS
To
1
APC
he
uc
Shantou
Laos
Thailand
G
Guinea
be
ica
Kh
Chennai
5
er
SG
Venezuela
Glo
Am
Puerto dad Viejo Trini
Colombia
Manta
-C
ulna
M
BB
ri
/SE Eurasia -5 SMW
Aden AAE-1
cas Camu
Cara
TGN
CON FAL
Al Hudaydah
SMW-3
na
d
Al Ghaydah
Yemen
Eritrea
Sudan
Chad Burkina Faso
SMW-4 FEA
ge
msta
a
SAT
Tolu
Wille
ch
a
Mali
Senegal
Sucujaque
ACE
Ustupo
nquill
Dakar
Banjul
n One
tt y Pra Batterama City Pan
rra
rta
wn
Mai
Puerto Limon
ha
Ba
Ca
PCCS
to
SMW-
L
ge
-US
PC-
China-US
N2
KI
id
X AM et s-1 on M abra et Se oben I Gl M-1 s SA erica C Am SA
SAP
Praia Br
Tong Fuk
Vietnam
ng
GO
N
Japan
Okinawa
5
C
Cox's Bazaar
Myanmar ai
nn
he
NCP TPE
China-US
-3
C-
ECFS
G
Americas II
W
Pacific Light
TP
M
PAC Rio
Khulna
Mumbai
ACO
NA
PA
1
TPC-5
Faster
sia
t
a-1
India
ON
TGN Transpacific UNITY
-5 TPC C -C2 AL RN G AP -2 A FE APCN
AJC
ne
Alb
PAC SAC
X
A-
Bangladesh
LC
-1
AAE
TGN Transpacific
AJC
be
X
AY
FA
Muscat
O
East-West
Glo
C
AM
M
Bluefields
Al Seeb
Oman
Port Sudan
Niger
an
PL
Puerto Puerto Trojillo Puerto Puerto Barrios Cortes Lempira San Jose Puerto Cabezas
AMX
C
Nouakchott
g Kw
Fibralink SA
PA
UAE
Jeddah
Mauritania San Juan
Pali
un
ble
Montego Ocho Bay Rios
Tse
o Ca
h
Ladyville
CJFS
ra jai
am
1
AMX
Half-Moon Bay
Karachi
Japan-US
Emi
Wada
EAC
Fuzhou TWA-1
Toyohashi Shima
SM
Chabahar Dubai
Kochi
Miyazaki
Bhutan
Halul
Saudi Arabia
Kitakyushu
C-J FOS
Nepal
Fu
Tulum Samuel L Spencer Beach
Al-Khobar Manama
Japan
Fukuoka
E
PC-1
Sendai Niigata Naoetsu Kitaibaraki Matsutou Ajigaura Ibaraki
C
Bandar Abbas
Egypt
Cancun
Oah
Libya
II
1
tan
X-
Algeria
Sardinia Alta Vista
s ica
an
CF
El Medano
III
er Am
OS-
Gu
u
bus
Colum
E
K
Hamada
Chongming Shanghai
Pakistan Kharg Bushehr
Kuwait City
Akita
RJ
Kumihama
Pusan Keoje
TP
China
Iran Al Faw
Aqaba
Zafarana
et
bu lum C MA
Co
ARC
Mazatlan Havana
la
Keawau
Se
Globen
BIC
bus
um
Col
AM Mo X ne t ab ras -1
s II
S
Freeport Boca Raton Hollywood Miami
Mexico
M-1
SA
ast
X-E
AP
Am
Vero Beach
CS
ITY
UN
eri
BP-GOM
Ras Sidr
TP
Afghanistan
Iraq
Tel Aviv
Israel
Alexandria
AA
Darnah Benghazi
hazi
TP E RN AP AL CN
Beirut Haifa
Tripoli-Beng
Tripoli
na Ca
G
Tunisia
Qingdao
Syria
AP
Tartus
an
K
sh
S
MINERVA
Morocco
Link
HAW
RO
RJK
ng
XA ND
South Korea
Fa
l
ha
nc
Fu
II
CN
Tajikistan
TGN Intra-A
Ingleside
sI
ca
RJ
North Korea
Uzbekistan
on he Inc n ea Ta
Suez
Jacksonville
Carac
Cro
PC
-US SEA
ern
Turkmenistan
C
ALE
Teutan
Casablanca St. David's
Pascagoula uth
So
Kyrgyzstan
Armenia
Turkey Marmaris
RVA
ss
an-US Jap AAG -5 TPC
Georgia
Istanbul
UR
IT
Greece Lechaina Koropi
EMOS-1 Pozallo Kélibia
C2
As
et
Corfu
W5
Oran ilah
Durres
Bari
SM
Annaba
AAE -1
1
E
E-
Med Cable
Poti
System
AS
AA
us Cable
C-
RS
Ses Covetes
Ishikari
Nakhodka Caucas
EA
Orv
in BU i be Berm S ne t uda
BA
Algiers El Djemila
Sochi
SUB
Com Sea
gal Lis bon
Valencia
OCS
TE AM TG EIG S N GU LF
MAC
s xu l Ne ba
Gl
PC-1
Barcelona
Spain
Cadiz
lo
G lo
os s
iki
Cr rn
wa
he
Ha
ut
Ponta Delgada
Nevelsk
Mongolia Novorossiysk BSF
Varna
ilus
So
Graciosa
en
ob
Tijuana
C-
Bulgaria
Bar
MedNaut
G
em
Dubrovnik Ajaccio
AV
Kazakhstan
Odesa
Romania Mangalia
EIG
G
-1
China-US
FL
Faial
San Luis Grover Obispo Beach Morro Hermosa Bay Beach
Light
S-
RE
O
Flores
ICA
Tuckerton
CB
Pacific
O
RV
CO
Corvo
Manasquan
Virginia Beach
Ukraine
Slovakia Hungary
Slovenia
Savona
Bilbao
Vigo
FR
TPC-5
S-1
NU
CA
RA
United States
Point Arena
NCP
China-US Faster
Lynn
O-1
EU
Japan-US
C ha Br rle oo st kh ow av n en Northport Island Park
GL
Mys Levashova
Far East
R ITU BSFOCS
Tran
Austria Italy
Bordeaux
Okha
Belarus
Czech Republic
France
St. Hilaire
Lithuania
Poland
ille
Bandon
Plerin
Sventoji
Dueodde
Penmarch
N TG rn ste e We rop Eu
Magadan
Latvia
Liepaja
rse
Florence ific
Guernsey Lannion
AEC ntic ia-Atla Hibern FA-1 atlantic TGN Trans atlantic TGN Trans AC-2 Apollo TAT-14 ss ia Expre Hibern AC-1 Apollo FA-1 c Fibre Atlanti AEC-2
S
Hibe
Halifax
Bro ad sta irs Ca ye Sa ux Va int -s le ur ry -M -e er nCa ux
Kingisepp
Ventspils
Germany
Domburg
Ma
TGN
Pennant Point
Logi
Norden De Marne IJmuiden
Pevensey Bay
al
Nedonna Beach
ntic Atla
rnia-
Milton
Warrenton
spac
4
Portu
Harbor Pointe
E
TUN
NEP
spacific
TPE
Highbridge Whitesand Bay Widemouth Bay no Porthcur
Russian Federation
Kotka
Tallin
Estonia
Mielno Ribnitz-Damgarten Kolobrzeg
Gedser
TGN NE
Southport
United Lowestoft Kingdom
Oxwich Bay
T-1 TA
PC-1
TGN
head
Holy
Kilmore Quay
-1
AC
hagen
Copen Westerland
Redcar Humanby
Ireland Dublin
Cork
Port Alberni
Denm
PAN
Coleraine Killala
Tran
Gothenburg
ark
Thisted GEA
Nor
ntic
rnia-Atla
Hibe
Ala sk Ala a Un sk a Un ited W No ited es rth Ea t AK St st OR ar N
Ardendal
Hango
EE-S1
Stockholm Stavsnas
-1
Banff
LA
Ketchikan
Kristiansand
AT
AK
SE
Petersburg Wrangell
Tysvaer
Dunnet Bay
Juneau Greenland Connect
Hawk Inlet Sitka
Kodiak Narrow Cape
Angoon
ak di i Ko na Ke
Ayre of Cara
Helsingfors
Vaddo
Mariehamn
Canada
ALPAL-2
Seward Homer
BCS East-Wes Interlink t
Sandviken
4
Maywick
Far East
Norway
2
W-
A-
SM
EF
W-5
SH
Conn
SM
Gree
SMW-3
nland
Qaqortoq
-WE
Valdez
Whittier Kenai
ect
SMW-5
Nuuk
Anchorage
GB I MEN A SMW -5
Nome
Submarine Cables of The World
New Zealand
AAE-1.....................................................10
ASC........................................................80
C-BUS...................................................152
FASTER................................................224
AAG.......................................................12
ASE.........................................................82
CEIBA-2...............................................154
FEHMARN BELT...............................226
AC-1.......................................................14
ASH........................................................84
CELTIXCONNECT............................156
FIBRALINK.........................................228
AC-2.......................................................16
ATHENA...............................................86
CFX-1...................................................158
FIBRE ATLANTIC..............................230
ACE........................................................18
ATLANTIS-2.........................................88
CHINA-US..........................................160
FLAG EUROPE-ASIA........................232
ADONES...............................................20
ATLAS OFFSHORE.............................90
CIOS.....................................................162
FLORES-CORVO................................234
ADRIA-1................................................22
AUSTRAL..............................................92
CJFS......................................................164
FOG......................................................236
AEC........................................................24
AWE.......................................................94
C-LION1..............................................166
GBICS...................................................238
AJC.........................................................26
BAHAMAS-2........................................96
COLUMBUS II....................................168
GCN.....................................................240
AKORN.................................................28
BALTICA...............................................98
COLUMBUS III..................................170
GEMINI BERMUDA..........................242
ALASIA.................................................30
BAR-SAV.............................................100
CONCERTO-1.....................................172
GEORGIA-RUSSIA............................244
ALASKA UNITED EAST....................32
BASS STRAIT 2...................................102
CORFU-BAR.......................................174
GLO-1...................................................246
ALASKA UNITED WEST...................34
BBG.......................................................104
DANICA NORTH..............................176
GLOBENET.........................................248
ALBA-1..................................................36
BCS EAST............................................106
DANICA SOUTH...............................178
GO-1.....................................................250
ALETAR.................................................38
BCS EAST-WEST INTERLINK.........108
DANICE..............................................180
GOKI....................................................252
ALEXANDROS....................................40
BCS NORTH.......................................110
DDSCN................................................182
GONDWANA-1.................................254
ALONSO DE OJEDA...........................42
BDM.....................................................112
DENMARK-NORWAY 5...................184
GREENLAND CONNECT...............256
ALPAL-2................................................44
BEST CABLE SYSTEM......................114
DENMARK-NORWAY 6...................186
GUANTÁNAMO BAY CABLE........258
AMERICAN SAMOA-FIJI..................46
BHARAT-LANKA..............................116
DENMARK-POLAND 2...................188
GWEN..................................................260
AMERICAS I.........................................48
BICS......................................................118
DIDON................................................190
HANNIBAL........................................262
AMERICAS I SOUTH..........................50
BIN.......................................................120
DMCS...................................................192
HANTRU-1.........................................264
AMERICAS II.......................................52
BIOS / JONAH...................................122
EAC-C2C.............................................194
HAWAIKI............................................266
AMERIGO VESPUCCI........................54
BLAST..................................................124
EASSY..................................................196
HAWK CABLE SYSTEM...................268
AMX-1....................................................56
BORACAY-PALAWAN......................126
EAST-WEST........................................198
HIBERNIA ATLANTIC.....................270
ANTEL...................................................58
BOTNIA...............................................128
ECFS.....................................................200
HIBERNIA EXPRESS.........................272
ANTILLES CROSSING.......................60
BRCS....................................................130
EIG........................................................202
HONOTUA.........................................274
APCN 2..................................................62
BRUSA.................................................132
ENDEAVOUR.....................................204
HSCS....................................................276
APG........................................................64
BSCS.....................................................134
ESTEPONA-TETOUAN....................206
HUGO..................................................278
APHRODITE 2.....................................66
BSFOCS................................................136
EULALINK.........................................210
I2I..........................................................280
APNG-2.................................................68
CADMOS............................................138
EUROPA..............................................212
ICN1.....................................................282
APOLLO................................................70
CAMEROON-BRAZIL......................140
FA-1 NORTH/SOUTH......................214
ICN2 (INTERCHANGE II)...............284
APX-CENTRAL....................................72
CANALINK........................................142
FALCON..............................................216
I-ME-WE..............................................286
APX-EAST.............................................74
CANTAT-3...........................................144
FAR EAST............................................218
ITALY-ALBANIA................................288
APX-WEST............................................76
CAUCASUS CABLE SYSTEM.........148
FARICE-1.............................................220
ITALY-GREECE..................................290
ARCOS-1...............................................78
CB-1......................................................150
FARLAND...........................................222
ITALY-LIBYA.......................................292
ITALY-MONACO...............................294
NEPTUNE CANADA........................364
SEA-ME-WE 5.....................................434
TUBROK-EMASED...........................506
JAKA2DELEMA.................................296
NORSEA COM-1................................366
SEA-US................................................436
TWA-1..................................................508
JAKABARE.........................................298
NORTHSTAR......................................368
SG-SCS.................................................438
UGARIT...............................................510
JAPAN-US...........................................300
ORVAL.................................................370
SHEFA 2...............................................440
UNISUR...............................................512
JASUKA...............................................302
PAC.......................................................372
SILPHIUM...........................................442
UNITY..................................................514
KAFOS.................................................304
PALAU-GUAM..................................374
SJC........................................................444
VENTSPILS-GOTLAND...................516
KATTEGAT-2......................................306
PAN-AM..............................................376
SKR1M.................................................446
VMSCS.................................................518
KELTRA-2...........................................308
PANGEA..............................................378
SMPCS.................................................448
WACS...................................................520
KHULNA-CHENNAI.......................310
PC-1......................................................380
SMPR-1................................................450
WARF...................................................522
KJCN....................................................312
PCCS....................................................382
SOCC....................................................452
WESTERN VISAYAS-PALAWAN....524
KODIAK KENAI................................314
PEC.......................................................384
SOLAS..................................................454
KUWAIT-IRAN..................................316
PLCN...................................................386
SOUTHERN CROSS..........................456
LEV.......................................................318
PPC-1...................................................388
SVALBARD.........................................458
LION....................................................320
QATAR-UAE.......................................390
TANGERINE.......................................460
LION-2.................................................322
QUINTILLION SUBSEA...................392
TANNAT.............................................462
MAC.....................................................324
RJCN....................................................394
TASMAN GLOBAL ACCESS...........464
MAIN ONE.........................................326
RNAL...................................................398
TAT 14..................................................466
MAIN ONE EXPANSION.................328
SAC......................................................400
TE NORTH..........................................468
MATRIX...............................................330
SACS....................................................402
TEAMS.................................................470
MAYA-1...............................................332
SAFE.....................................................404
TGN EURASIA...................................472
MBDC..................................................334
SAM-1..................................................406
TGN GULF..........................................474
MCT.....................................................336
SAMOA-FIJI........................................408
TGN INTRA-ASIA.............................476
MED CABLE NETWORK.................338
SAPL.....................................................410
TGN NORTHERN EUROPE............478
MEDNAUTILUS................................340
SAPL CX..............................................412
TGN TRANSATLANTIC..................480
MELITA-1............................................342
SAS-1....................................................414
TGN TRANSPACIFIC.......................482
MENA..................................................344
SAT-3....................................................416
TGN WESTERN EUROPE................484
MIC-1...................................................346
SCAN...................................................418
TGN-TATA INDIACOM...................486
MICRONESIA CABLE SYSTEM......348
SCF-CN................................................420
TGN-TIC..............................................488
MINERVA............................................350
SCOTLAND-ORKNEY-
TIERRA DEL FUEGO........................490
MKCS...................................................352
SHETLAND........................................422
TIS.........................................................492
MOANA..............................................354
SEABRAS-1.........................................424
TONGA-FIJI........................................494
MONET...............................................356
SEACOM.............................................426
TPE.......................................................496
HUAWEI MARINE............................208
MYTHIC..............................................358
SEAK....................................................428
TRIDENT.............................................498
OFS.......................................................146
NCP......................................................360
SEA-ME-WE 3.....................................430
TRINIDAD-CURAÇAO....................500
STF ANALYTICS................................502
NCSCS.................................................362
SEA-ME-WE 4.....................................432
TSE-1....................................................504
WFN STRATEGIES............................396
SPONSORS
AAE-1
Project Completion Phases:
Ba rce Ma lona rse ille s
Pre-Engineering Survey System Manufacture
Pa ler mo
System Installation Commissioning & Acceptance
lat Zafrana Abu Ta
Shanghai Fujairah
Hong Kong
Cox Bazaar Mumbai
Myanmar
Djibouti Sri Lanka Kenya System Name:
Asia Africa Europe [Planned]
Landing Points: Barcelona (Spain), Marseilles (France), Palermo (Italy), Abu Talat (Egypt), Zafrana (Egypt), Djibouti, Oman, Fujairah (UAE), Mumbai (India), Kenya, Sri Lanka, Cox Bazaar (Bangladesh), Myanmar, Singapore, Hong Kong, Shanghai (China) RFS Year:
2016
Est. End of Service Date:
2041
Est. System Cost (US$): 600,000,000 Total Length (kms): 25,000 News:
http://subtelforum.com/articles/tag/aae-1/
Singapore Design Capacity: Fiber Pairs:
40 Tbps 5
Channels: 80 Channel Capacity: Owners:
100 Gbps British Telecom, China Unicom, Chuan Wei, Djibouti Telecom, Etisalat, HKT (PCCW Global), Mobily, Omantel, Ooredoo, PTCL, Telecom Egypt, Telecom Yemen, Vittel, OTEG, Reliance Jio, Time.com, TOT
System Supplier:
TE SubCom, NEC
System Installer:
TE SubCom
Marine Surveyor: Fugro Region: Indian Ocean Pan-East Asian
San Luis Obispo
AAG
Lantau Sri Racha Vung Tau Mersing Changi
La Union Tungku
Keawaula Tanguisson
System Name:
Asia-America Gateway
Landing Points: Changi (Singapore), Keawaula (Hawaii), Lantau (Hong Kong), La Union (Philippines), Mersing (Malaysia), Grover Beach (USA), Sri Racha (Thailand), Tanguisson (Guam), Tungku (Brunei), Vung Tau (Vietnam) RFS Year: 2009 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2034 500,000,000 20,547 2.88 Tbps AT&T Inc., Bayan, Bharti, BT Global Network Services, CAT Telecom, ETPI, FPT Telecom, the Government of Brunei Darussalam, PT Indosat, PLDT, Saigon Postel Corporation, StarHub, Telcotech, TELKOM Indonesia, Telstra, Telekom Malaysia, TNZL, Viettel, VNPT
System Supplier:
Alcatel Submarine Networks, NEC
System Installer:
Alcatel Submarine Networks, ASEAN Cableship, NEC, Orange Marine
Cableship: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Rene Descartes AT&T, PLDT, Starhub Ltd, Telstra International, TM Berhad Mitsubishi, Ciena 2011, 2014 40 Gbps, 100 Gbps
Region: Transpacific News:
http://subtelforum.com/articles/tag/aag/
AC-1
Westerland Beverwijk Whitesands Bay
Brookhaven
System Name:
Atlantic Crossing 1
Landing Points: Beverwijk (Netherlands), Brookhaven (USA), Westerland (Germany), Whitesands Bay (UK) RFS Year: 1999 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs: Owners:
2024 875,000,000 13,377 40 Gbps 1 Tbps 4 Fiber Pairs Level 3 Communications
System Supplier:
Tyco Telecommunications SSI
System Installer:
Tyco Telecommunications SSI
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Level 3 Communications Xtera Communications 2010 20 Gbps
Region: Transatlantic News:
http://subtelforum.com/articles/tag/ac-1/
AC-2
Widemouth Bay
Bellport
System Name:
Atlantic Crossing 2
Landing Points: Bellport (USA), Widemouth (UK) RFS Year: 2000 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2025 700,000,000 6,185
Initial Capacity:
320 Gbps
Design Capacity:
640 Gbps
Owners:
Level 3 Communications
System Maintainer:
Level 3 Communications
Upgrader: Upgrade Year: Upgraded Capacity:
Infinera 2010 10 Gbps
Region: Transatlantic News:
http://subtelforum.com/articles/tag/ac-2/
ACE
System Name:
Africa Coast To Europe
Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Asilah (Morocco), Banjul (The Gambia), Bata (Equatorial Guinea), Cape Town (South Africa), Conakry (Guinea), Cotonou (Benin), Dakar (Senegal), Freetown (Sierra Leone), Kribi (Cameroon), Lagos (Nigeria), Libreville (Ga
Penmarch
Lisbon
RFS Year: 2012
Asilah
Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Channel Capacity:
100 Gbps Benin Telecoms, Cable Consortium of Liberia, Canalink Africa SL, Côte d’Ivoire Telecom, Dolphin Telecom JLT, Gambia Submarine Cable, Guinéenne de Large Bande, International Mauritania Telecom, MEO, MTN, Orange (France), Orange Cameroun, Orange Mali, Orang
System Supplier:
Alcatel-Lucent Submarine Networks (Main contractors), TE SubCom (Sub contractors)
System Installer:
Orange Marine
System Maintainer:
Muanda
17,000 12.8 Tbps
Marine Surveyor:
Fugro Orange, PT Comunicações S.A., Sonatel, Gestor de Infraestructuras de Guinea Ecuatorial (GITGE)
Region: EMEA
Luanda
News:
n
Swakopmund
To w
Santana
Kribi Bata Libreville
700,000,000
Design Capacity: Owners:
Ca pe
D Su Ba ak N cu nj ar ou ak Fr Con jaq ul ch u e a ot M eto kr e t on w y ro n vi a A Ac bi cr dja a n Lo C me La oto go no s u
Tenerife
2037
http://subtelforum.com/articles/tag/ace/
ADONES
System Name:
Angola Domestic Network System
Landing Points: Benguela (Angola), Cabinda (Angola), Luanda (Angola), Lucira (Angola), Namibe (Angola), Nzeto (Angola), Porto Amboim (Angola), Soyo (Angola) RFS Year: 2009 Est. End of Service Date:
Cabinda
Est. System Cost (US$):
Soyo
Total Length (kms):
Nzeto Luanda
Benguela Lucira
Namibe
35,000,000 1,800
Initial Capacity:
30 Gbps
Design Capacity:
80 Gbps
Owners:
Angola Telecom
System Supplier:
Ericsson
System Installer:
Elettra
Cableship:
Teleri
Region: EMEA News:
Porto Amboim
2034
http://subtelforum.com/articles/tag/ adones/
ADRIA-1
System Name:
ADRIA-1
Landing Points: Corfu (Greece), Dubrovnik (Croatia), Durres (Albania) RFS Year: 2000 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
13,400,000 430 622 Mbps Deutsche Telekom AG, OTE
System Supplier:
Alcatel Submarine Networks
System Installer:
Alcatel Submarine Networks
System Maintainer:
Dubrovnik
2025
Hellenic Telecommunications Organization S.A.
Region: EMEA
Durres
Corfu
AEC
System Name:
America Europe Connect
Landing Points: Shirley, New York (United States); Killala, Ireland RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
2041 300,000,000 5,536 52 Tbps 6 Fiber Pairs 130 100 Gbps AquaComms
System Supplier:
TE SubCom
System Installer:
TE SubCom
Cableship:
Reliance
Region: Transatlantic News:
http://subtelforum.com/articles/tag/aec/
Killala
Shirley
AJC Maruyama Shima
System Name:
Australia-Japan Cable
Landing Points: Maruyama (Japan), Oxford Falls (Australia), Shima (Japan), Sydney (Australia), Tanguisson (Guam), Tumon (Guam) RFS Year:
2001
Est. End of Service Date:
2026
Est. System Cost (US$): 520,000,000
Tumon
Tanguisson
Total Length (kms): 12,224 Initial Capacity: 320 Gbps Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
System Supplier:
25.6 Tbps 4 Fiber Pairs 64 100 Gbps Australia Japan Cable Limited, Communications Global Network Services Limited, NTT Communications Corporation, SOFTBANK Telecom Corp., Telstra Holdings (Bermuda) No. 1 Limited, Worldcom Global Networks Limited Ocean Cable Company, Tyco Telecommunications
System Installer: FCR, KDD Cableship: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
Fresnel, Subaru Australia Japan Cable, SoftBank Telecom Corp Ciena, Infinera 2012, 2014 40 Gbps, 100 Gbps Transpacific http://subtelforum.com/articles/tag/ajc/
Oxford Falls Sydney
AKORN
Anchorage
System Name:
Akorn
Landing Points: Anchorage (USA), Florence (USA) RFS Year: 2009 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier: System Maintainer:
2034 100,000,000 2,968 10 Gbps 4 Fiber Pairs Alaska Communications Tyco Telecommunications ACS Cable Systems
Region: Americas
Florence
ALASIA
System Name:
Alasia
Landing Points: Pentaskhinos (Cyprus), Tartus (Syria) RFS Year: 2012 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Owners:
2037 15,000,000 350 25.6 Tbps 8 Fiber Pairs Cyprus Telecommunications Authority, Syrian Telecommunications Authority
Region: EMEA
ALASKA UNITED EAST
Valdez
Whittier
Juneau
System Name:
Alaska United East
Landing Points: Harbor Pointe (USA), Juneau (USA), Valdez (USA), Whittier (USA) RFS Year:
1999
Est. End of Service Date:
2024
Est. System Cost (US$): 100,000,000 Total Length (kms): 3,751 Initial Capacity: 2.5 Gbps Design Capacity: Fiber Pairs: Owners: System Supplier: System Maintainer: Region:
10 Gbps 2 Fiber Pairs GCI NEC General Communication Incorporated Americas
Harbor Pointe
ALASKA UNITED WEST
Whittier
Ketchikan
System Name: Alaska United West Landing Points: Ketchikan (USA), Warrenton (USA), Whittier (USA) RFS Year: 2004 Est. End of Service Date:
2029
Est. System Cost (US$): 30,000,000 Total Length (kms): 2,483 Initial Capacity: 10 Gbps Design Capacity: 640 Gbps Fiber Pairs: 4 Fiber Pairs Owners: GCI System Supplier:
Tyco Telecommunications SSI
System Installer: Tyco Telecommunications SSI Cableship: Global Sentinel System Maintainer: General Communication Incorporated Region:
Americas
Warrenton
ALBA-1
System Name:
ALBA-1
Landing Points: Camuri (Venezuela), Ocho Rios (Jamaica), Santiago De Cuba (Cuba), Siboney (Cuba) RFS Year: 2013
Havana
Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
Santiago de Cuba Morant Point
Initial Capacity: Owners:
2038 72,000,000 1,600 640 Gbps Telecom Venezuela, Transbit SA
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Shanghai Bell, Telecomunicaciones Gran Caribe
Marine Surveyor:
EGS
Survey Boat: RV Ridley Thomas Region: Americas News:
Camuri
http://subtelforum.com/articles/tag/ alba-1/
ALETAR
Tartus
System Name:
Alexandria
Aletar
Landing Points: Alexandria (Egypt), Tartus (Syria) RFS Year: 1997 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
2022 23,000,000 733 5 Gbps 1 Fiber Pair Lebanese Ministry of Telecom (6.25%), Syrian Telecom (46.875%), Telecom Egypt (46.875%)
System Supplier:
Alcatel Submarine Networks
System Installer:
FCR
Cableship: System Maintainer:
Vercors Telecom Egypt
Region: EMEA
ALEXANDROS
System Name:
Alexandros
Landing Points: Alexandria (Egypt), Marseille (France), Pentaskhinos (Cyprus) RFS Year: 2010 Est. End of Service Date:
2035
Total Length (kms):
3,500
Design Capacity:
Marseille
10 Tbps
Owners:
Cyprus Telecommunications Authority, Telecom Egypt
System Maintainer:
Cypress Telecommunications Authority
Region: EMEA News:
http://subtelforum.com/articles/tag/ alexandros/
Pentaskhinos
Alexandria
ALONSO DE OJEDA
System Name:
Alonso De Ojeda
Landing Points: Oranjestad (Aruba), Willemstad (Netherlands Antilles) RFS Year: 1999 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2024 8,700,000 128
Initial Capacity:
15 Gbps
Design Capacity:
100 Gbps
Owners:
Antelecom NV
System Supplier:
Alcatel Submarine Networks
System Installer:
IT International Telecom
System Maintainer:
Setar NV, United Telecommunications Services
Region: Americas
Oranjestad Willemstad
ALPAL-2
System Name:
Alpal-2
Landing Points: El Djemila (Algeria), Ses Covetes (Majorca) RFS Year: 2002 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
312 10 Gbps
Design Capacity:
160 Gbps
Owners:
4 Fiber Pairs APT, France Telecom, Telefonica
System Supplier:
Pirelli
System Installer:
Global Marine Systems Limited
Cableship:
El Djemila
17,600,000
Initial Capacity: Fiber Pairs:
Ses Covetes
2027
System Maintainer:
Maersk Responder Telefonica de España, S.A.U.
Region: EMEA
AMERICAN SAMOA-FIJI
System Name:
American Samoa-Fiji [Planned]
Landing Points: Pago Pago (American Samoa), Fiji RFS Year: 2017 Est. End of Service Date: Est. System Cost (US$): Initial Capacity: Owners:
2041 35,000,000 40 Gbps American Samoa Hawaii Cable
Region: AustralAsia News:
http://subtelforum.com/ articles/?s=american+samoa+fiji
American Samoa
Project Completion Phases:
Fiji
Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
AMERICAS I
System Name:
Americas I
Landing Points: Magens Bay (Virgin Islands), Vero Beach (USA)
Vero Beach
RFS Year: 1994 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
220,000,000 2,013
Initial Capacity:
120 Gbps
Design Capacity:
320 Gbps
Owners:
Magens Bay
2019
AT&T, CANTV (Venezuela), Embratel, TSTT
System Supplier:
Tyco Telecommunications SSI
System Installer:
Tyco Telecommunications SSI
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
AT&T, Telecom Services Trinidad & Tobago Xtera Communications 2010 20 Gbps
Region: Americas News:
http://subtelforum.com/ articles/?s=americas+I
AMERICAS I SOUTH
System Name:
Americas I South
Landing Points: Camuri (Venezuela), Fortaleza (Brazil), Macqueripe (Trinidad), Magens Bay (Virgin Islands) RFS Year: 1994 Est. End of Service Date:
2019
Total Length (kms):
6,014
Initial Capacity: Owners:
Magens Bay
560 Mbps AT&T, CANTV (Venezuela), Embratel, TSTT
System Supplier:
Alcatel Submarine Networks, Tyco Telecommunications SSI
System Installer:
C&W (Marine)
Cableship:
Cable Installer, Agile, Fresnel
Region: Americas
Camuri
Macqueripe
Fortaleza
AMERICAS II
System Name:
Americas II
Landing Points: Camuri (Venezuela), Cayenne (French Guiana), Chaguaramas (Trinidad), Fortaleza (Brazil), Hollywood (USA), Lamentine (France), Miramar (Puerto Rico), St Croix (US Virgin Islands), Willemstad (Netherlands Antilles)
Hollywood
RFS Year: 2000 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
Miramar St Croix
Design Capacity:
210 Gbps
Willemstad
Antelecom NV, AT&T, Brazil Telecom, CANTV (Venezuela), Embratel, France Telecom, GT&T, Sprint, Telecom Italia, Telefonica, Telesur, Telintar, Trescom Int., TSTT, Verizon
System Supplier:
ASN Australia, Tyco Telecommunications
System Installer:
Tyco Telecommunications SSI
Cableship:
Cayenne
8,373 80 Gbps
Owners:
Chaguaramas
350,000,000
Initial Capacity:
Le Lamentin
Camuri
2025
System Maintainer:
Global Link AT&T, Orange, Telecom Services Trinidad & Tobago, United Telecommunications Services
Region: Americas News:
Fortaleza
http://subtelforum.com/ articles/?s=Americas+II
AMERIGO VESPUCCI
System Name:
Amerigo Vespucci
Landing Points: Bonaire (Netherlands), Curacao (Curacao) RFS Year: 1999 Est. End of Service Date: Est. System Cost (US$):
2024 15,000,000
Total Length (kms):
84
System Maintainer:
United Telecommunication Services
Region: Americas
Bonaire Curaçao
AMX-1
System Name:
Landing Points: Jacksonville (United States), Miami (United States), San Juan (Puerto Rico), Puerto Barrios (Guatemala), Barranquilla (Colombia), Cartagena (Colombia), Fortaleza (Brazil), Salvador de Bahia (Brazil), Rio de Janeiro (Brazil), Puerto Plata (Dominican Repub
Jacksonville Maimi
RFS Year: 2014 Est. End of Service Date:
Cancun Puerto Barrios
America Movil Submarine Cable System-1
Est. System Cost (US$):
Puerto Plata
Barranquilla Cartagena
Total Length (kms):
San Juan
Initial Capacity: Owners:
2039 700,000,000 17,800 100 Gbps America Movil
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Marine Surveyor:
Fugro, EGS
Region: Americas News:
http://subtelforum.com/articles/tag/ amx-1/
Fortaleza
Rio de Janeiro
ANTEL
Maldonado
Las Toninas
System Name: Antel Landing Points: Las Toninas (Argentina), Maldonado (Uruguay) RFS Year: 2010 Est. End of Service Date:
2035
Est. System Cost (US$): 15,000,000 Total Length (kms): 250 Initial Capacity: 50 Gbps Design Capacity: 3.84 Tbps Owners: Antel (Uruguay), Telecom Argentina System Supplier:
Alcatel-Lucent Submarine Networks
System Installer: IT Telecom Region: News:
Americas http://subtelforum.com/articles/tag/ antel/
ANTILLES CROSSING
System Name:
Antilles Crossing
Landing Points: Bridgetown (Barbados), Hams Bluff (Virgin Islands), Port Castries (St Lucia) RFS Year: 2006 Est. End of Service Date:
Hams Bluff
Total Length (kms):
952
Initial Capacity:
40 Gbps
Design Capacity:
80 Gbps
Owners:
Antilles Crossing, Barbados Light & Power, Leucadia, Telebarbados
System Supplier:
Tyco Telecommunications SSI
System Installer:
Tyco Telecommunications SSI
Upgrader: Upgrade Year: Upgraded Capacity:
Port Castries
2031
Ciena 2013 40 Gbps
Region: Americas News:
Bridgetown
http://subtelforum.com/ articles/?s=antilles+crossing
raki
Kitaiba
APCN 2 Pusan
Chongming
kura
Chi
System Name:
Asia-Pacific Cable Network 2
Landing Points: Batangas (Philippines), Chikura (Japan), Chongming (China), Katong (Singapore), Kitaibaraki (Japan), Kuantan New Port (Malaysia), Lantau (Hong Kong), Pusan (South Korea), Shantou (China), Tanshui (Taiwan)
Shantou Lantau
Tanshui
RFS Year:
2002
Est. End of Service Date:
2027
Est. System Cost (US$): Total Length (kms):
160 Gbps
Design Capacity:
25.6 Tbps
Channels: Channel Capacity: Owners:
g
ton
Ka
Upgrader: Upgrade Year: Upgraded Capacity: Region:
40 Gbps, 100 Gbps AustralAsia
News: http://subtelforum.com/articles/tag/ apcn2/
100 Gbps China Telecom, Chunghwa Telecom International, CTM, France Telecom, KDDI, KT Coropration, NTT Communications, PLDT (Philippines), Reach NHK, Singtel, Telekom Malaysia
System Installer:
Global Marine Systems Limited
NEC 2011, 2014
64
Ocean Cable Company
a
Ku
4 Fiber Pairs
System Supplier: Cableship:
n nta
19,000
Initial Capacity: Fiber Pairs:
Batangas
1,100,000,000
Marine Surveyor: System Maintainer:
Cable Retriever, Bold Endurance, Fu Lai, Asean Restorer, Maersk Recorder, Maersk Repeater, Maersk Responder, Maersk Reliance, Subaru, Kuroshio Maru, Cable Installer. Barges, Networker, Elbe, Chin Ann 3 C&C Technologies China Telecommunications Corporation, Chunghwa Telecom Co., KDDI, KT Corporation, NTT Communications Corporation, PLDT, Singapore Telecommunications Ltd, TM Berhad
APG
Pusan
Shima
Maruyama
Project Completion Phases:
Chongming
Pre-Engineering
Nanhu
Survey System Manufacture System Installation Commissioning & Acceptance
Toucheng Lantau
System Name:
Asia Pacific Gateway [Planned]
Landing Points: Chongming (China), Da Nang (Vietnam), Kuantan (Malaysia), Tseung Kwan (Hong Kong), ShinMaruyama (Japan), Nanhui District (China), Busan (South Korea), Shima (Japan), Songkhla (Thailand), Toucheng (Taiwan), Tanah Merah (Singapore)
Da Nang
RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Channel Capacity: Owners:
Songkhla Kuantan Tuas
2041 313,000,000 10,400 38.4 Tbps 40 Gbps China Telecom, China Unicom, Chunghwa Telecom International, Facebook, KT Coropration, NTT Communications, PLDT (Philippines), StarHub (Singapore), Telekom Malaysia, TIME dotCom, VNPT
System Supplier:
NEC
System Installer:
NTT Com, S.B. Submarine Systems, NEC
System Maintainer:
China Telecommunications Corporation, Chunghwa Telecom Co.
Region: AustralAsia News:
http://subtelforum.com/articles/tag/apg/
APHRODITE 2
System Name:
Aphrodite 2
Landing Points: Chania (Greece), Yeroskipos (Cyprus) RFS Year: 1994 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
System Supplier: Cableship:
2019 30,000,000 868 1.12 Gbps AT&T, Belgacom, British Telecom, Cyprus Telecommunications Authority (62%), France Telecom, OTE, Sprint, Verizon Alcatel Submarine Networks Skandi Hav
Region: EMEA
Chania Yeroskipos
APNG-2
Point Moresby
System Name: Australia Papua New Guinea 2 Landing Points: Port Moresby (Papua New Guinea), Sydney (Australia) RFS Year: 2006 Est. End of Service Date:
2031
Est. System Cost (US$): 11,000,000 Total Length (kms): 3,400 Initial Capacity: 1.12 Gbps Fiber Pairs: 2 Fiber Pairs Owners: Telikom PNG, Telstra (Australia) System Supplier:
Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks Cableship: Ile de Re System Maintainer: Telstra International Region:
AustralAsia
Sydney
APOLLO Widemouth Bay Lannion
Brookhaven Manasquan System Name:
Apollo
Landing Points: Brookhaven (USA), Lannion (France), Manasquan (USA), Widemouth (UK) RFS Year: 2003 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2028 350,000,000 12,700
Initial Capacity:
10 Gbps
Design Capacity:
25 Tbps
Fiber Pairs: Channel Capacity: Owners:
4 Fiber Pairs 100 Gbps Alcatel, Apollo SCS Limited, C&W
System Supplier:
Alcatel Submarine Networks
System Installer:
Alcatel Submarine Networks
Cableship: Upgrader: Upgrade Year: Upgraded Capacity:
Ile de Batz, Ile de Brehat, Ile de Sein, Skandi Neptune Alcatel-Lucent Submarine Networks 2012, 2014 40 Gbps, 100 Gbps
Region: Transatlantic News:
http://subtelforum.com/articles/tag/ apollo/
APX-CENTRAL
System Name:
Asia Pacific Express Central [Planned]
Landing Points: Adelaide (Australia), Hobart (Australia), Melbourne (Australia), Perth (Australia) RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels: Channel Capacity:
2041 150,000,000 4,800 32 Tbps 4 Fiber Pairs 80 100 Gbps
Owners:
SubPartners
System Supplier:
TE SubCom
Region: AustralAsia News:
http://subtelforum.com/articles/tag/apxcentral/
Perth Adelaide Project Completion Phases: Pre-Engineering
Melbourne
Survey System Manufacture System Installation Commissioning & Acceptance
Hobart
APX-EAST
Hermosa Beach
Oahu
System Name:
Asia Pacific Express East [Planned]
Landing Points: Auckland (New Zealand), Hermosa Beach (United States), Oahu, Hawaii (United States), Sydney (Australia) RFS Year: 2017 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs:
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Channels: Channel Capacity:
2042 350,000,000 12,700 40 Tbps 4 Fiber Pairs 100 100 Gbps
Owners:
SubPartners
System Supplier:
TE SubCom
Region: Transpacific News:
http://subtelforum.com/articles/?s=APXEast
APX-WEST
System Name:
Landing Points: Jakarta (Indonesia), Christmas Island (Australia), Perth (Australia), Singapore
Singapore
RFS Year: 2018 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity:
Jakarta
Fiber Pairs: Channels: Channel Capacity: Owners:
Christmas Island
System Supplier: News:
Pre-Engineering
System Manufacture System Installation Commissioning & Acceptance
2041 150,000,000 4,600 20 Tbps 2 Fiber Pairs 100 100 Gbps SubPartners, Singtel, Telstra TE SubCom
Region: AustralAsia
Project Completion Phases: Survey
Asia Pacific Express West [Planned]
Perth
http://subtelforum.com/articles/?s=APXWest
ARCOS-1
System Name:
Landing Points: Bluefields (Nicuragua), Cancun (Mexico), Cartagena (Columbia), Cat Island (Bahamas), Crooked Island (Bahamas), Hollywood (USA), Ladyville (Belize), Maria Chiquita (Panama), Nassau (The Bahamas), Providenciales (Turks and Caicos Islands), Puerto Barrios (G
Hollywood Nassau
Cat Island
Crooked Island
Cancun
Tulum
RFS Year: 2001
Providenciales
Est. End of Service Date: Est. System Cost (US$):
Pu Pu ert er o B to ar lo Co rio rte s s
Puerto Plata
Total Length (kms):
Punta Cana
Ladyville
an
u
nJ
Sa
Tr oj il
Initial Capacity: Design Capacity:
Puerto Lempira
Owners:
Puerto Cabezas
on
ta
m
iq
ui
Li
Ch
to M
ar
ia
er Pu
d
sta
m ille Riohacha Punto W Fijo Cartagena
Bluefields
Arcos-1
2026 250,000,000 8,700 80 Gbps 1 Tbps Alestra (Mexico), AT&T, Axtel (Mexico), BTC (Bahamas), BTL (Belize), CANTV (Venezuela), Codetel (Dominican Republic), Colombus Networks, Enitel (Nicaragua), Hondutel (Honduras), ICE (Costa Rica), Impsat (USA), Internexa (Colombia), Orbinet SA (Colombia),
System Supplier:
Norddeutsche Seekabelwerke (Tyco Telecommunications, Partial)
Marine Surveyor:
Fugro
Ustupo
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Colombus Networks USA Inc., United Telecommunications Services Xtera Communications 2008, 2016 40 Gbps, 100 Gbps
Region: Americas News:
http://subtelforum.com/articles/?s=arcos
ASC
System Name:
Australia-Singapore Cable [Planned]
Landing Points: Perth (Australia), Tanah Mera (Singapore), Anyer (Indonesia)
Singapore
RFS Year: 2017 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity:
Anyer
Fiber Pairs: Channels: Channel Capacity: Owners:
2042 160,000,000 4,600 36 Tbps 3 Fiber Pairs 120 100 Gbps Australia-Singapore Cable International Limited
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Region: AustralAsia News:
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Perth
http://subtelforum.com/ articles/?s=australia-singapore+cable
ASE Japan
Hong Kong
System Name:
Asia Submarine-cable Express
Landing Points: Japan, Philippines, Hong Kong, Malaysia, Singapore, Cambodia
Philippines
RFS Year: 2013 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels:
Malaysia Singapore
Channel Capacity: Owners:
2038 412,000,000 7,200 15.36 Tbps 6 Fiber Pairs 128 40 Gbps NTT Communications (Japan), PLDT (Philippines), StarHub (Singapore), Telekom Malaysia
System Supplier:
Fujitsu Limited, NEC Corporation
System Installer:
S.B. Subarine Systems, NTT, NEC
System Maintainer:
NTT Communications Corporation, PLDT, StarHub, TM Berhad
Region: AustralAsia News:
http://subtelforum.com/articles/tag/ase/
ASH
System Name:
Keawaula
America Samoa Hawaii
Landing Points: Keawaula (Hawaii), Pago Pago (American Samoa) RFS Year: 2009 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
2034 100,000,000 4,680 1.2 Gbps 2 Fiber Pairs ASH Cable Company
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Cableship: System Maintainer:
Ile de Ré Telecom New Zealand
Region: AustralAsia News:
Pago Pago
http://subtelforum.com/articles/tag/ash/
ATHENA
System Name:
Athena
Landing Points: Koropi (Greece), Pentaskhinos (Cyprus) RFS Year: 2011 Est. End of Service Date: Total Length (kms): Owners:
2036 600 Cypress Telecommunications Authority, Telecom Italia Sparkle
Region: EMEA
Koropi
Pentaskhinos
ATLANTIS-2
System Name:
Atlantis-2
Landing Points: Conil (Spain), Dakar (Senegal), El Medano (Spain), Fortaleza (Brazil), Funchal (Portugal), Las Toninas (Argentina), Lisbon (Portugal), Praia (Cape Verde), Rio de Janeiro (Brazil)
Lisbon
Conil
Funchal El Medano
RFS Year: 2000 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
40 Gbps 160 Gbps
Channel Capacity: Owners:
2 Fiber Pairs, Initial: 2 wavelengths, Design: 8 wavelengths 2 to 8 40 Gbps Cabo Verde Telecom, Deutsche Telekom AG, Embratel, France Telecom, Marconi, Sonatel, Telecom Argentina, Telecom Italia, Telefonica, Telefonica de Argentina, Telintar, Verizon
System Supplier:
Alcatel Submarine Networks, Pirelli, Fujitsu
System Installer:
FCR
Cableship:
Fortaleza
13,100
Design Capacity:
Channels:
Dakar
370,000,000
Initial Capacity: Fiber Pairs:
Praia
2025
System Maintainer:
Raymond Croze, Fresnel, Vercors, Teneo, Teliri, Maersk Defender PT Comunicações S.A., Sonatel, Telefonica de España S.A.U., Telefonica International Wholesale Services
Region: Transatlantic
Rio de Janeiro
Las Toninas
ATLAS OFFSHORE
Marseille
System Name:
Atlas Offshore
Landing Points: Asilah (Morocco), Marseille (France) RFS Year: 2007 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
Asilah
2032 31,000,000 1,634
Initial Capacity:
40 Gbps
Design Capacity:
320 Gbps
Owners:
Maroc Telecom of Morocco
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Region: EMEA
AUSTRAL
System Name:
Austral [Planned]
Landing Points: Puerto Montt (Chile), Punta Arenas (Chile)
Puerto Montt
RFS Year: 2017 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
2042 100,000,000 1,800 AUSTRAL University of Magellan, Magellan CPC
System Supplier:
Huawei Marine Networks
System Installer:
IT International Telecom
Region: Americas
Project Completion Phases: Pre-Engineering Survey System Manufacture
Punta Arenas
System Installation Commissioning & Acceptance
AWE
System Name:
Australia West Express [Planned]
Landing Points: Perth, Australia; Djibouti RFS Year: 2017
Djibouti
Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
2042 300,000,000 10,100 20 Tbps 2 Fiber Pairs 100 200 Gbps GoTo Networks
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Region: Indian Ocean Pan-East Asian News:
http://subtelforum.com/ articles/?s=australia+west+express
Perth
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
BAHAMAS-2
System Name:
Bahamas-2
Landing Points: Eight Mile Rock (Bahamas), Nassau (The Bahamas), Vero Beach (USA) RFS Year: 1997 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2022 25,000,000 478 2.5 Gbps AT&T, Balteco, Verizon
System Supplier:
Tyco Telecommunications SSI
System Installer:
Tyco Telecommunications SSI
Marine Surveyor: System Maintainer:
C&C Technologies AT&T, Bahamas Telecommunications Company
Region: Americas
Vero Beach
Eight Mile Rock
Nassau
BALTICA
System Name:
Baltica
Landing Points: Dueodde (Bornholm), Gedser (Denmark), Kolobrzeg (Poland), Ystad (Sweden) RFS Year: 1997 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer:
2022 16,000,000 437 5 Gbps 6 Fiber Pairs Polish Telecom, TDC, Telecom Finland, Telenor, Teliasonera Orange Polska S.A., TDC A/S, TeliaSonera International Carrier AB
Region: EMEA
Ystad Dueodde Gedser Kolobrzeg
BAR-SAV
Savona
Barcelona
System Name:
BAR-SAV
Landing Points: Barcelona (Spain), Savona (Italy) RFS Year: 1996 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: System Supplier: System Maintainer:
2021 39,000,000 760 5 Gbps Telecom Italia, Telefonica Alcatel Submarine Networks Telecom Italia Sparkle, Telefonica de España S.A.U.
Region: EMEA
BASS STRAIT 2
System Name:
Bass Strait 2
Landing Points: Inverloch (Australia), Stanley (Tasmania, Australia) RFS Year: 2003 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2028 17,000,000 240 10 Gbps Telstra (Australia)
System Supplier:
Alcatel Submarine Networks
System Installer:
Alcatel Submarine Networks
Cableship:
Ile de Batz
Region: AustralAsia
Inverloch
Stanley
BBG
System Name:
Bay of Bengal Gateway
Landing Points: Sri Lanka, Singapore, Oman, UAE RFS Year: 2014 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
2039 30,000,000 8,000 100 Gbps 30 Tbps 3 Fiber Pairs 100 100 Gbps Bay of Bengal Consortium
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Cableship: Marine Surveyor:
Ile De Brehat EGS
Survey Boat: Northern Endeavour Region: Indian Ocean Pan-East Asia News:
http://subtelforum.com/articles/tag/bbg/
BCS EAST
System Name:
BCS East
Landing Points: Liepaja (Latvia), Sventoji (Lithuania) RFS Year: 1997 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2022 15,000,000 98 2.5 Gbps Teliasonera
Region: EMEA
Liepaja Sventoji
BCS EAST-WEST INTERLINK
System Name:
BCS East-West Interlink
Landing Points: Sandviken (Sweden), Sventoji (Lithuania) RFS Year: 1997 Est. End of Service Date:
Sandviken
Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2022 20,000,000 218 2.5 Gbps Teliasonera
System Supplier:
Ericsson
System Installer:
AKN
Cableship:
Pleijel
Region: EMEA
Sventoji
BCS NORTH
System Name:
BCS North
Landing Points: Hango (Finland), Haraldsholm (Finland), Helsingfors (Finland), Kotka (Finland), Mariehamn (Finland), Stavsnas (Sweden) RFS Year: 2003 Est. End of Service Date: Helsingfors Mariehamn Haraldsholm Hango Stavsnas
Kotka
Est. System Cost (US$): Logi
Total Length (kms): Initial Capacity: Owners:
2028 30,000,000 793 10 Gbps Rostelecom, Teliasonera
System Supplier:
Ericsson
System Installer:
AKN
Cableship: System Maintainer:
Pleijel TeliaSonera International Carrier AB
Region: EMEA
BDM
System Name:
Batam-Dumai-Melaka
Landing Points: Batam (Indonesia), Dumai (Indonesia), Melaka (Malaysia) RFS Year: 2011 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs: Channels:
Melaka
Channel Capacity: Owners:
Dumai Batam
2036 76,000,000 400 80 Gbps 2.56 Tbps 4 Fiber Pairs 64 10 Gbps PT Mora Telematika, PT XL Axiata, Telekom Malaysia
System Supplier:
Huawei Marine Networks
System Installer:
Huawei Marine Networks
System Maintainer:
TM Berhad
Region: AustralAsia News:
http://subtelforum.com/articles/tag/ bdm/
BEST CABLE SYSTEM
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation
Guam
Commissioning & Acceptance
Malaysia
Philippines
Palau
Yap
Brunei
Indonesia
System Name:
Best Cable System [Planned]
Landing Points: Brunei; Sabah; Malaysia; Southern Philippines; Kalimantan, Indonesia; extension to Guam RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
2041 150,000,000 5,092 Best Cable Corp. Pte. Ltd.
Region: AustralAsia
BHARAT-LANKA
System Name:
Bharat-Lanka
Landing Points: Dehiwala-Mount Lavinia (Sri Lanka), Tuticorin (India) RFS Year: 2007 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
40,000,000 338
Initial Capacity:
40 Gbps
Design Capacity:
960 Gbps
Channel Capacity:
Tuticorin
2032
Owners:
40 Gbps BSNL, Sri Lanka Telecom Limited (SLT), Sri Lanka
System Supplier:
NEC
System Installer:
NEC
System Maintainer:
Sri Lanka Telecom
Region: Indian Ocean Pan-East Asian News:
Dehiwala-Mount Lavinia
http://subtelforum.com/articles/tag/ bharat-lanka/
BICS
System Name:
Boca Raton
Crown Haven Riding Point Freeport
Bahamas Internet Cable System
Landing Points: Boca Raton (USA), Crown Haven (Bahamas), Freeport (Bahamas), Marsh Harbour (Bahamas), Nassau (The Bahamas), Riding Point (Bahamas), Rock Sound (Bahamas), Sandy Point (Bahamas), Upper Bogue (Bahamas) RFS Year: 2001
Marsh Harbour Sandy Point Upper Bogue
Nassau
Rock Sound
Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2026 31,000,000 1,000
Initial Capacity:
10 Gbps
Design Capacity:
12 Tbps
Channel Capacity:
10 Gbps
Owners:
Carribbean Crossings
Region: Americas
BIN
System Name:
Balkans-Italy Network
Landing Points: Bari (Italy), Durres (Albania) RFS Year: 2011 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2036 21,700,000 276
Initial Capacity:
40 Gbps
Channel Capacity:
40 Gbps
Owners:
Unifi
Region: EMEA
Bari
Durres
BIOS / JONAH
System Name:
BIOS/Jonah
Landing Points: Tel Aviv (Israel), Bari (Italy) RFS Year: 2011 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
2036 15,000,000 2,300 Bezeq International
System Supplier:
Alcatel-Lucent Submarine Networks
Marine Surveyor:
Elettra
Region: EMEA
Bari
Tel Aviv
BLAST
Ofu Aunu'u
Luma
Tutuila System Name:
Broadband Linking the American Samoa Territory
Landing Points: Fogagogo, Tu’tuila (American Samoa), Ofu Harbor, Ofu (American Samoa), Luma, Ta’u (American Samoa), Aunu’u Warf, Aunu’u (American Samoa) RFS Year: 2015 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
2040 11,000,000 250 ASTCA (American Samoa)
System Supplier:
IT International Telecom
System Installer:
IT International Telecom
Marine Surveyor:
IT International Telecom
Region: AustralAsia
BORACAY-PALAWAN
System Name:
Boracay-Palawan
Landing Points: Taytay (Philippines), San Jose (Philippines), Coron (Philippines); Boracay (Philippines), Caticlan (Philippines) RFS Year: 2013 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels: Channel Capacity:
Coron Taytay
San Jose Boracay Caticlan
Owners: System Supplier:
2038 20,000,000 332 4.8 Tbps 12 Fiber Pairs 40 10 Gbps Globe Telecom Huawei Marine Networks
Region: AustralAsia
BOTNIA
System Name:
Botnia
Landing Points: Umea (Sweden), Vaasa (Finland) RFS Year: 1994 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
2019 8,500,000 77 1.2 Gbps 6 Fiber Pairs Teliasonera
System Supplier:
NKT
System Installer:
AKN
Cableship: System Maintainer:
Pleijel TeliaSonera International Carrier AB
Region: EMEA
Umea
Vaasa
BRCS
System Name:
Batam-Rengit Cable System
Landing Points: Batam (Indonesia), Sungai Rengit (Malaysia) RFS Year: 2007 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2032 10,000,000 63 10 Gbps Excelcom
Region: AustralAsia
Sungai Rengit Batam
BRUSA Virginia Beach
San Juan
Fortaleza
Rio de Janeiro
System Name:
Brazil-USA [Planned]
Landing Points: Rio de Janeiro, Brazil; Fortaleza, Brazil; San Juan, Puerto Rico; Virginia Beach, Virginia, USA
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
RFS Year: 2018 Est. End of Service Date: Total Length (kms): Owners:
2043 1,1000 Telefonica
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Region: Americas
BSCS
System Name:
Batam Singapore Cable System
Landing Points: Batam (Indonesia), Changi (Singapore) RFS Year: 2009 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
2034 13,100,000 73 80 Gbps 3 Fiber Pairs Telekom Indonesia
System Supplier:
Ocean Cable Company
System Installer:
Stena Offshore, ASEAN Cableship, NEC
Cableship:
Northern Installer
Region: AustralAsia
Changi Batam
BSFOCS
Odesa
Novorossiysk
Varna
System Name:
Black Sea Fibre Optic Cable System
Landing Points: Novorossiysk (Russia), Odesa (Ukraine), Varna (Bulgaria) RFS Year: 2001 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
2026 51,000,000 933 2.5 Gbps 2 Fiber Pairs Armentel, AT&T, BTC, Cypress Telecommunications Authority, DTAG, HT, KDDI, OTE, Rostelecom, Telecom Slovenia, Ukrtelecom
System Supplier:
Alcatel Submarine Networks, Tyco Telecommunications SSI
System Installer:
Global Marine Systems Limited
Cableship: System Maintainer:
Maersk Fighter Cyprus Telecommunications Authority, Hellenic Telecommunications Organization S.A., OJSC “Rostelecom”
Region: EMEA
CADMOS
System Name:
Cadmos
Landing Points: Beirut (Lebanon), Pentaskhinos (Cyprus) RFS Year: 1995 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Owners:
System Supplier: System Maintainer:
2020 8,000,000 262 622 Mbps 2 Fiber Pairs Cyprus Telecommunications Authority (62%), Lebanese Ministry of Telecommunications (38%) Tyco Telecommunications Cyprus Telecommunications Authority
Region: EMEA
Pentaskhinos
Beirut
CAMEROON-BRAZIL
Cameroon
Fortaleza System Name:
Cameroon-Brazil [Planned]
Landing Points: Fortaleza, Brazil; Kribi, Cameroon RFS Year: 2018 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels:
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Channel Capacity: Owners:
2043 487,000,000 5,900 32 Tbps 4 Fiber Pairs 80 100 Gbps CamTel, China Unicom
System Supplier:
Huawei Marine
System Installer:
Global Marine
Region: Transatlantic News:
http://subtelforum.com/ articles/?s=cameroon-brazil
CANALINK
Cadiz
System Name:
Canalink
Landing Points: Cadiz (Spain), Tenerife (Spain) RFS Year: 2011 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
2036 157,000,000 2,000 5.12 Tbps 4 Fiber Pairs 128 10 Gbps Isalink, IT3
System Supplier:
Alcatel-Lucent Submarine Networks
Marine Surveyor:
Fugro, Elettra
Region: EMEA News:
Tenerife
http://subtelforum.com/articles/tag/ canalink/
CANTAT-3
Vestmannaeyjar
Tjөrnuvik
Blaabjerg Redcar Westerland
Pennant Point
System Name:
CanTaT-3
Landing Points: Blaabjerg (Denmark), Pennant Point (Canada), Redcar (United Kingdom), Tjørnuvík (Faroe Islands), Vestmannaeyjar (Iceland), Westerland (Germany) RFS Year: 1994 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2019 385000000 6450 7.5 Gbps Tata Communications
System Supplier:
Alcatel Submarine Networks
System Installer:
BT Marine, TeleDanmark, Orange Marine
Region: Transatlantic
From shore to shore . . .
TeraWave™
OFS’ complete portfolio of ocean fiber solutions enables industry-leading performance through high signal power and low-loss.
TrueWave® AllWave® ZWP Ocean Fibers
Coherent Transport High Signal Power Outstanding Bend Performance Simplified Network Design Long-term Reliability
A Furukawa Company To learn more, ask your cabler about OFS or visit www.ofsoptics.com
/ofsoptics
/ofs_telecom
/company/ofs
/OFSoptics
CAUCASUS CABLE SYSTEM
Varna Poti
System Name:
Caucasus Cable System
Landing Points: Poti (Georgia), Varna (Bulgaria) RFS Year:
2008
Est. End of Service Date:
2033
Est. System Cost (US$): 76,000,000 Total Length (kms): 1,187 Design Capacity: Fiber Pairs: Owners: System Supplier: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
1.2Tbps 2 Fiber Pairs Caucasus Online Tyco Telecommunications TE SubCom 2016 100 Gbps EMEA http://subtelforum.com/articles/tag/ caucasus-cable-system/
CB-1
System Name:
Charlestown
Challenger Bermuda-1
Landing Points: Bermuda (Bermuda), Charlestown, Rhode Island (United States) RFS Year: 2009 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2034 50,000,000 1,448
Initial Capacity:
20 Gbps
Design Capacity:
320 Gbps
Owners: System Supplier: System Maintainer:
Cable Company Ltd, Verizon Alcatel-Lucent Submarine Networks Cable Co Ltd, Verizon Ltd
Region: Americas
Bermuda
C-BUS Manasquan
System Name:
Caribbean-Bermuda US
Landing Points: Manasquan (USA), Tortola (British Virgin Islands) RFS Year:
2009
Est. End of Service Date:
2034
Est. System Cost (US$): $10,000,000 Total Length (kms): 1,609 Owners: System Supplier:
LIME Tyco Telecommunications SSI
System Installer: Tyco Telecommunications SSI, IT International Telecom Upgrader: Upgrade Year:
Xtera Communications 2016
Upgraded Capacity:
100 Gbps
Region:
Americas
News:
http://subtelforum.com/articles/?s=cbus
Tortola
CEIBA-2
System Name:
Ceiba-2 [Planned]
Landing Points: Malabo, Equatorial Guinea; Bata, Equatorial Guinea; branching unit to Kribi, Cameroon RFS Year: 2017 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Owners: System Supplier:
2042 15,000,000 290 8 Tbps Republic of Equatorial Guinea Huawei Marine
Region: EMEA
Malabo
Kribi Bata
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
CELTIXCONNECT
Dublin
Holyhead
System Name:
CeltixConnect
Landing Points: Dublin (Ireland), Holyhead (UK) RFS Year: 2011 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
2036 22,000,000 131 960 Gbps 72 Fiber Pairs Sea Fibre Networks
System Supplier:
Alcatel Submarine Networks
System Installer:
Global Marine Systems Limited
Region: EMEA News:
http://subtelforum.com/articles/tag/ celtixconnect/
CFX-1 Boca Raton
System Name:
Colombia-Florida Subsea Fiber
Landing Points: Boca Raton (USA), Cartagena (Columbia), Morant Point (Jamaica) RFS Year:
2008
Est. End of Service Date:
2033
Total Length (kms):
2,439
Morant Point
Initial Capacity: 110 Gbps Design Capacity:
2 Tbps
Fiber Pairs: 2.5 Tbps per Fiber Pair Owners: System Supplier: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
Columbus Networks Tyco Telecommunications Colombus Networks USA, Inc. TE SubCom 2011 40 Gbps, 2.5 Tbps per fiber pair Americas http://subtelforum.com/articles/?s=cfx-1
Cartagena
CHINA-US
Bandon San Luis Obispo
Fa n
gs
ha
n
Pusan Chikura Chongming Okinawa Shantou Tanguisson
System Name:
China-US
Landing Points: Bandon (USA), Chikura (Japan), Chongming (China), Fangshan (Taiwan), Okinawa Prefecture (Japan), Pusan (South Korea), Grover Beach (USA), Shantou (China), Tanguisson (Guam) RFS Year:
2001
Est. End of Service Date:
2026
Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Channels: Channel Capacity:
1100,000,000 30,444 80 Gbps 4 Fiber Pairs 8 2.5 Gbps
Owners:
China-US Consortium (KDD (Japan), NTT Worldwide Network (Japan), AT&T (USA), MCI Communications (USA), Sprint (USA), Teleglobe USA (USA), SBC Communications (USA), China Telecom (China), HongKong Telecom (Hong Kong), Chunghwa Telecom (Taiwan), Korea Telec
System Supplier:
Alcatel Submarine Networks, Fujitsu, Ocean Cable Co, Tyco Telecommunications
Cableship: Marine Surveyor: System Maintainer:
Region:
Flexservice III, Kuroshio Maru, Cable Innovator C&C Technologies AT&T, China Telecommunications Corporation, Chunghwa Telecom Co., KDDI, KT Corporation, NTT Communications Corporation Transpacific
CIOS
System Name:
Cyprus-Israel Optical System
Landing Points: Ayia Napa (Cyprus), Nahariya (Israel) RFS Year: 1994 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Owners: System Maintainer:
Ayia Napa
2018 16,000,000 262 622 Mbps 1 Fiber Pair Bezeq, Cypress Telecommunications Authority Cyprus Telecommunications Authority
Region: EMEA
Nahariya Nahariya
CJFS
Half-Moon Bay Montego Bay
System Name:
Cayman Jamaica Fibre System
Landing Points: Half-Moon Bay (Cayman Islands), Montego Bay (Jamaica) RFS Year:
1997
Est. End of Service Date:
2022
Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: Region:
6,500,000 870 2.5 Gbps LIME Americas
Helsinki
C-LION1
System Name:
C-Lion1
Landing Points: Helsinki, Finland; Rostock-Ribnitz, Germany
Rostock-Ribnitz
RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channel Capacity: Owners:
2041 74,000,000 1,172 144 Tbps 8 Fiber Pairs 300 Gbps Cinia Group
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Marine Surveyor:
Fugro
Region: EMEA News:
http://subtelforum.com/articles/tag/clion1/
o m Pa le r
COLUMBUS II
Funchal
West Palm Beach Cancun
Sardinia
Magens Bay
System Name:
Colombus II
Landing Points: Cancun (Mexico), Funchal (Portugal), Magens Bay (Virgin Islands), Palermo (Italy), Sardinia (Gran Canaria), West Palm Beach (USA) RFS Year: 1994 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2019 600,000,000 12,165
Initial Capacity:
560 Mbps
Design Capacity:
2.5 Gbps
Owners: System Supplier: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Columbus II Consortium Alcatel Submarine Networks, Tyco Telecommunications SSI, Pirelli AT&T, Telecom Italia Sparkle Xtera Communications 2012 100 Gbps
Region: Transatlantic News:
http://subtelforum.com/ articles/?s=columbus+II
ar az
H
ol ly w
oo
d
M
Lisbon Conil
Ponta Delgada
a
COLUMBUS III
System Name:
Colombus III
Landing Points: Miami, Florida (USA); Ponta Delgada, Azores Islands (Portugal); Lisbon, Portugal; Conil, Spain; Mazara del Vallo, Sicily (Italy) RFS Year:
1999
Est. End of Service Date:
2024
Est. System Cost (US$): Total Length (kms):
236,000,000 9,833
Initial Capacity:
40 Gbps
Design Capacity:
160 Gbps
Fiber Pairs: Owners: System Supplier: Cableship: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
2 Fiber Pairs Columbus III Consortium Alcatel Submarine Networks, Pirelli, Tyco Telecommunications Vercors, Skandi Hav AT&T, PT Comunicações S.A., Telecom Italia Sparkle, Telefonica de España S.A.U. Xtera Communications 2012 100 Gbps Transatlantic http://subtelforum.com/ articles/?s=columbus+III
CONCERTO-1
System Name:
Concerto-1
Landing Points: Bruges (Belguim), Thorpeness (United Kingdom), Zandvoort (Netherlands) RFS Year: 1999 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
Zandvoort
2024 25,000,000 574 2.5 Gbps 96 Fiber Pairs Flute
System Supplier:
Alcatel Submarine Networks
System Installer:
Alcatel Submarine Networks
Region: EMEA
Thorpeness
Bruges
CORFU-BAR
System Name:
Corfu-Bar
Landing Points: Bar (Montenegro), Corfu (Greece) RFS Year: 1998 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer:
2023 19,000,000 320 622 Mbps 3 Fiber Pairs Crngorski Telecom, OTE Hellenic Telecommunications Organization S.A.
Region: EMEA
Bar
Corfu
DANICA NORTH
System Name:
Danica North
Landing Points: Barseback (Sweden), Tuborg (Denmark) RFS Year: 1998 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
25 10 Gbps 96 Fiber Pairs Teliasonera Ericsson
System Installer:
AKN
System Maintainer: Upgrader: Upgrade Year:
Barseback
10,000,000
System Supplier: Cableship:
Tuborg
2023
Upgraded Capacity:
Pleijel TeliaSonera International Carrier AB Ciena 2013 40 Gbps
Region: EMEA
DANICA SOUTH
System Name:
Danica South
Landing Points: Bjarred (Sweden), Copenhagen (Denmark) RFS Year: 1998 Est. End of Service Date: Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
2023 20 10 Gbps 24 Fiber Pairs Teliasonera
System Supplier:
Ericsson
System Installer:
AKN
Cableship: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Pleijel TeliaSonera International Carrier AB Ciena 2013 40 Gbps
Region: EMEA
Copenhagen
Bjarred
DANICE
Landeyjarsandur
System Name:
Danice
Landing Points: Blaabjerg (Denmark), Landeyjarsandur (Iceland) RFS Year:
2008
Est. End of Service Date:
2033
Est. System Cost (US$): 76,000,000 Total Length (kms): 2,291 Initial Capacity: 1000 Gbps Design Capacity: Fiber Pairs: Owners: System Supplier: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
5.1 Tbps 4 Fiber Pairs Farice Ltd. Tyco Telecommunications Farice ehf Ciena 2013 100 Gbps EMEA http://subtelforum.com/ articles/?s=Danice
Blaabjerg
DDSCN
Colombo
Hulhumalé
System Name:
Dhiraagu Domestic Submarine Cable Network
Landing Points: Colombo (Sri Lanka), Hulhumale (Maldives) RFS Year: 2012 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
2037 27,000,000 1,000 Dhiraagu
System Supplier:
NEC
System Installer:
NEC
Region: Indian Ocean Pan-East Asian News:
http://subtelforum.com/articles/tag/ ddscn/
DENMARK-NORWAY 5
System Name:
Denmark-Norway 5
Landing Points: Ardendal (Norway), Hjrorring (Denmark) RFS Year: 1992 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: System Maintainer:
2017 9,560,000 123 2 Gbps Norway PTT, TDC TDC A/S
Region: EMEA
Ardendal
Hjorring
DENMARK-NORWAY 6
System Name:
Denmark-Norway 6
Landing Points: Kristiansand (Norway), Thisted (Denmark) RFS Year: 1992 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: System Maintainer:
2017 8,950,000 124 1.5 Gbps Norway PTT, TDC TDC A/S
Region: EMEA
Kristiansand
Thisted
DENMARK-POLAND 2
System Name:
Denmark-Poland 2
Landing Points: Gedebak Odde (Denmark), Mielno (Poland) RFS Year: 1991 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: System Maintainer:
2016 4,500,000 110 2.5 Gbps Polish Telecom, TDC Orange Polska S.A., TDC A/S
Region: EMEA
Gedebak Odde
Mielno
DIDON
System Name:
Didon
Landing Points: Kélibia (Tunisia), Mazara del Vallo, Sicily (Italy) RFS Year: 2014 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Channel Capacity:
2039 15,000,000 173 18 Tbps 100 Gbps
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
System Maintainer:
France Telecom
Region: EMEA News:
Mazara del Vallo
Kélibia
http://subtelforum.com/articles/tag/ didon/
DMCS
System Name:
Dumai-Melaka Cable System
Landing Points: Dumai (Indonesia), Melaka (Malaysia) RFS Year: 2005 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
Dumai
Melaka
2030 15,000,000 150
Initial Capacity:
20 Gbps
Design Capacity:
320 Gbps
Owners:
PT Telekom, Telekom Malaysia
System Supplier:
NEC
System Installer:
ASEAN Cableship
System Maintainer:
TM Berhad
Region: AustralAsia
EAC-C2C
System Name:
EAC-C2C
Landing Points: Capepisa (Philippines), Changi (Singapore), Chikura (Japan), Chung Hom Kok (Hong Kong), Fangshan (Taiwan), Nanhui District (China), Nasugbu (Philippines), Pali (Taiwan), Pusan (South Korea), Shima (Japan), Singapore (Singapore), Taean (South Korea), Tansh RFS Year: 2009 Est. End of Service Date: Taean Pusan
Ajigaura Chikura Shima
Est. System Cost (US$): Total Length (kms): Design Capacity: Owners:
Nanhui
850,000,000 35,429 30 Tbps PACNET
System Supplier:
NEC
Marine Surveyor:
C&C Technologies
System Maintainer: Upgrader:
n sha ng Fa
O ah ok Kw K ng Hom eu Ts ung Ch
Pali
Tanshui
2034
Upgrade Year: Upgraded Capacity:
Pacnet Global (Singapore) Pte. Infinera 2013 100 Gbps
Region: AustralAsia News: Capepisa Nasugbu Vung Tau
Changi
http://subtelforum.com/articles/?s=EACC2C
EASSY
System Name:
Eastern Africa Submarine Cable System
Landing Points: Dar es Salaam (Tanzania), Djibouti (Republic of Djibouti), Maputo (Mozambique), Mogadishu (Somalia), Mombasa (Kenya), Moroni (Comoros), Mtunzini (South Africa), Port Sudan (Sudan), Toliary (Madagascar)
Port Sudan
RFS Year: 2010 Est. End of Service Date: Est. System Cost (US$):
Djibouti
Total Length (kms): Design Capacity:
10 Tbps
Owners:
Mombasa System Supplier: System Maintainer: Upgrader: Upgrade Year:
Moroni
Upgraded Capacity:
Maputo Mtunzini
2 Fiber Pairs 100 Gbps Bharti Airtel, Botswana Telecommunications Corporation, British Telecom, Comores Telecom, Etisalat, France Telecom, Mauritius Telecom, MTN Group, Neotel, Saudi Telecom Company (STC), Saudi Arabia, SPV2, Sudan Telecom Limited, Sudatel, Tanzania Telecommuni Alcatel-Lucent Submarine Networks Telkom SA Limited Alcatel-Lucent Submarine Networks 2014 100 Gbps
Region: EMEA News:
Toliary
9,900 30 Gbps
Channel Capacity:
Dar es Salaam
247,000,000
Initial Capacity: Fiber Pairs:
Mogadishu
2035
http://subtelforum.com/articles/tag/ eassy/
EAST-WEST
Santo Domingo
Tortola
Morant Point
System Name:
East-West
Landing Points: Morant Point (Jamaica), Santo Domingo (Dominican Republic), Tortola (British Virgin Islands) RFS Year: 2011 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2036 35,000,000 1,700
Initial Capacity:
120 Gbps
Design Capacity:
720 Gbps
System Installer:
Orange Magine
Upgrader: Upgrade Year: Upgraded Capacity:
Xtera Communications 2016 100 Gbps
Region: Americas News:
http://subtelforum.com/articles/tag/eastwest-cable/
ECFS
System Name:
East Caribbean Fiber System
Landing Points: Anguilla (Anguilla), Baliff (Guadeloupe), Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Canefield (Dominica), Dickenson Bay (Antigua), Kingstown (St. Vincent), Martinique (Martinique), Montserrat (Montserrat), Port Salines (Grenada), St. Lucia (S RFS Year: 1995
Tortola
Est. End of Service Date:
Anguilla St. Martin
Est. System Cost (US$): Total Length (kms):
Basseterre Dickenson Bay Montserrat
Initial Capacity: Owners:
Baliff
Kingstown Port Salines Trinidad
AT&T, BET (Barbados), C&W, France Telecom, TSTT C&W (Marine)
Upgrade Year: Upgraded Capacity:
Bridgetown
2.5 Gbps
System Installer:
Upgrader:
St. Lucia
1,875
Alcatel Submarine Networks
System Maintainer:
Martinique
56,000,000
System Supplier: Cableship:
Canefield
2020
Mercury Orange, Telecom Services Trinidad & Tobago Xtera Communications 2009, 2013, 2016 10 Gbps, 40 Gbps, 100 Gbps
Region: Americas News:
http://subtelforum.com/articles/?s=ECFS
EIG
Bude
Monaco Sesimbra Gibraltar Tripoli
Abu Talat Zafarana
Fujairah Muscat
Jeddah System Name:
Europe India Gateway
Landing Points: Abu Talat (Egypt), Bude (United Kingdom), Djibouti (Republic of Djibouti), Fujairah (United Arab Emirates), Gibraltar (Gibraltar), Jeddah (Saudi Arabia), Monaco (Monaco), Mumbai (India), Muscat (Oman), Zafarana (Egypt), Sesimbra (Portugal), Tripoli (Libya RFS Year:
2011
Est. End of Service Date:
2036
Djibouti
System Supplier:
Tyco Telecommunications, Alcatel-Lucent Submarine Networks
Marine Surveyor:
Fugro, UTEC, GEMS
Est. System Cost (US$): 700,000,000 Total Length (kms): 15,000 Initial Capacity: 3.84 Tbps Channel Capacity: Owners:
Mumbai
System Maintainer:
100 Gbps AT&T, Bharti Airtel, British Telecom, BSNL, C&W, Djibouti Telecom, Du, Gibtelecom, Libyan Post, Telecom, and Information Technology Company, MTN Group, Omantel, PT Comunicações, Saudi Telecom Company (STC), Telekom SA, Verizon, Telecom Egypt
Upgrader: Upgrade Year:
Oman Telecommunications Company, Telecom Egypt, Verizon Ltd., Vodafone Limited Ciena 2014
Upgraded Capacity: 100 Gbps Region: EMEA News: http://subtelforum.com/articles/tag/eig/
ENDEAVOUR
Keawaula
System Name:
Endeavour
Landing Points: Keawaula (Hawaii), Sydney (Australia)
Sydney
RFS Year:
2008
Est. End of Service Date:
2033
Total Length (kms):
9,125
Initial Capacity: Fiber Pairs: Owners: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
80 Gbps 2 Fiber Pairs Telstra (Australia) Telstra International Infinera 2014 100 Gbps AustralAsia http://subtelforum.com/ articles/?s=endeavour
ESTEPONA-TETOUAN
System Name:
Estepona-Tetouan
Landing Points: Estepona (Spain), Tetouan (Morocco) RFS Year: 1994 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2019 10,000,000 113 3.7 Gbps Telefonica
System Supplier:
STC Submarine Systems
System Installer:
FCR
Cableship: System Maintainer:
Vercors Telefonica de España S.A.U.
Region: EMEA
Estepona
Teutan
The Power of Submarine Information Transmission
There’s a new power under ocean uniting the world in a whole new way. With unparalleled development expertise and outstanding technology, Huawei Marine is revolutionizing trans-ocean communications with a new generation of repeaters and highly reliable submarine cable systems that offer greater transmission capacity, longer transmission distances and faster response to customer needs. Huawei Marine: connecting the world one ocean at a time.
Lisbon
M
ad eir a
EULALINK
Gran Canaria
Praia
Fortaleza
System Name:
Eulalink [Planned]
Landing Points: Fortaleza, Brazil; São Paulo, Brazil; Sines, Portugal RFS Year: 2017 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity:
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Fiber Pairs: Channels: Channel Capacity: Owners:
2042 250,000,000 5,875 30 Tbps 3 Fiber Pairs 100 100 Gbps Telebras, Islalink
Region: Transatlantic News:
http://subtelforum.com/ articles/?s=eulalink
EUROPA
System Name:
Europa
Landing Points: Pentaskhinos (Cyprus), Tripoli (Lebanon) RFS Year: 2013 Est. End of Service Date: Fiber Pairs: Owners:
2038 8 Fiber Pairs CYTA, Lebanese ministry of Telecommunications
Region: EMEA News:
Pentaskhinos
Tripoli
http://subtelforum.com/articles/tag/ europa/
FA-1 NORTH/SOUTH
Porthcurno
Plerin
Northport Island Park
System Name:
FLAG Atlantic 1 North/South
Landing Points: Island Park (USA), Northport (USA), Plerin (France), Porthcurno (United Kingdom) RFS Year: 2001 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
2026 900,000,000 12,820 4.68 Tbps 6 Fiber Pairs Global Cloud Xchange
System Supplier:
Alcatel Submarine Networks
System Installer:
Alcatel Submarine Networks
Marine Surveyor:
Svitzer, SAIC
Survey Boat: Vessel of Opportunity System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Global Cloud Xchange Infinera, Ciena 2010, 2011, 2013 10 Gbps, 100 Gbps
Region: Transatlantic News:
http://subtelforum.com/articles/?s=fa-1
FALCON
Owners: System Supplier:
Alcatel Submarine Networks
System Installer:
Alcatel Submarine Networks
System Maintainer: Upgrader:
Aqaba
Region:
Kuwait City
ba
ha
D Khuba as i ab
Jeddah
r
Al Seeb
Port Sudan
Mumbai Al Hudaydah
Al Ghaydah
System Name: Falcon Landing Points: Al Ghaydah (Yemen), Al Hudaydah (Yemen), Al-Khobar (Saudi Arabia), Al Seeb (Oman), Aqaba (Jordan), Bandar-E Abbas (Iran), Chabahar (Iran), Colombo (Sri Lanka), Dubai (UAE), Hulhumalé (India), Jeddah (Saudi Arabia), Kuwait City (Kuwait), Manama (Bahrain), RFS Year: 2006 Est. End of Service Date:
2031
Est. System Cost (US$): 900,000,000 Total Length (kms): 12,181 Initial Capacity: 90 Gbps Design Capacity: 2.56 Tbps Fiber Pairs: 8 Fiber Pairs
E-marine PJSC, Oman Telecommunications Company, Reliance Globalcom Ltd Infinera Indian Ocean Pan-East Asian
News: http://subtelforum.com/ articles/?s=Falcon
Bandar Abbas Cha
Al M -Kh Su an ob m am ar ai a sm a
Suez
Global Cloud Xchange
Trivandrum Colombo Hulhumalé
FAR EAST
Magadan
Okha
Mys Levashova
System Name:
Far East
Landing Points: Mys Levashova (Russia), Okha (Russia), Magadan (Russia) RFS Year:
2015
Est. End of Service Date:
2040
Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
50,000,000 1,844 1.6 Tbps 2 Fiber Pairs 8 100 Gbps Rostelcom
System Supplier:
Huawei Marine Networks
System Installer:
Global Marine Systems Limited
Cableship: Region: News:
Cable Innovator AustralAsia http://subtelforum.com/articles/tag/fareast/
FARICE-1
System Name:
Farice-1
Landing Points: Dunnet Bay (Scotland), Funningsfjør_ur (Faroe Islands), Sey_isfjör_ur (Iceland) RFS Year:
2004
Est. End of Service Date:
2029
Est. System Cost (US$): 25,000,000 Total Length (kms): 1,395 Initial Capacity: 20 Gbps Owners: System Supplier: Cableship: Marine Surveyor: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
Farice Ltd., Iceland Telecom Ltd. Pirelli Pertinacia Fugro Farice ehf Ciena 2013 100 Gbps EMEA http://subtelforum.com/articles/tag/ farice-1/
Dunnet Bay
FARLAND
System Name:
Farland
Landing Points: Aldeburgh (United Kingdom), Domburg (Netherlands) RFS Year: 1994 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: System Supplier: System Maintainer:
2019 10,000,000 149 18 Gbps British Telecom Tyco Telecommunications British Telecommunications PLC
Region: EMEA
Aldeburgh
Domburg
Oregon
FASTER
Shima Chikura China
System Name:
Faster [Planned]
Landing Points: China; Chikura, Japan; Shima, Japan; Oregon, USA; Los Angeles, California, USA RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2041 350,000,000 11,629
Initial Capacity:
28 Tbps
Design Capacity:
60 Tbps
Fiber Pairs: Channels: Channel Capacity: Owners:
Project Completion Phases:
6 Fiber Pairs 100 100 Gbps Google, China Telecom, China Mobile, Global Transit, KDDi, SingTel, TIME dotCom
Pre-Engineering
System Supplier:
NEC
Survey
System Installer:
Orange Marine
Cableship:
René Descartes
System Manufacture System Installation Commissioning & Acceptance
Region: Transpacific News:
http://subtelforum.com/articles/tag/ faster/
FEHMARN BELT
System Name:
Fehmarn Belt
Landing Points: Puttgarden (Germany), Rödbyhavn (Denmark) RFS Year: 2000 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2025 10,000,000 20 2.5 Gbps Teliasonera
System Supplier:
Ericsson
System Installer:
Nexans
Cableship: System Maintainer:
Pleijel TeliaSonera International Carrier AB
Region: EMEA
Rödbyhavn Puttgarden
FIBRALINK
Ki
ng sto n
Montego Bay
Ocho Rios
Puerto Plata
System Name:
FibraLink
Landing Points: Kingstown (St. Vincent), Montego Bay (Jamaica), Ocho Rios (Jamaica), Puerto Plata (Dominican Republic) RFS Year:
2006
Est. End of Service Date:
2031
Est. System Cost (US$): Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs: Owners:
30,000,000 2,438 40 Gbps 320 Gbps per fiber pair 2 Fiber Pairs Columbus Networks
System Supplier:
Alcatel
System Installer:
International Telecom
Cableship: Region: News:
IT Intrepid Americas http://subtelforum.com/articles/tag/ fibralink/
FIBRE ATLANTIC
Bordeaux
Virginia Beach
System Name:
Fibre Atlantic [Planned]
Landing Points: Bordeaux (France), Virginia Beach, Virginia (USA) RFS Year:
2018
Est. End of Service Date:
2043
Est. System Cost (US$):
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Total Length (kms): Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners: Region:
250,000,000 6,250 60 Tbps 6 Fiber Pairs 100 100 Gbps SemanticNet BV Transatlantic
FLAG EUROPE-ASIA
Keoje
Said Alexandria Port Aqaba Fujairah Jeddah
Nanhui
ez
Estepona
Palermo
Su
Hong Kong
Est. System Cost (US$): 720,000,000 Total Length (kms): 27,433 Initial Capacity: 20 Gbps Design Capacity: 80 Gbps Owners: Global Cloud Xchange System Maintainer: China Telecommunications Corporation, E-marine PJSC, Reliance Globalcom Ltd Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
Ciena 2012 100 Gbps Indian Ocean Pan-East Asian, EMEA http://subtelforum.com/articles/?s=FLAG
So
Penang Ban Pak Para
n
2022
tu
RFS Year: 1997
ng
kh
la
Mumbai
Sa
System Name: FLAG Europe-Asia Landing Points: Alexandria (Egypt), Aqaba (Jordan), Ben Pak Para (Thailand), Estepona (Spain), Fujairah (United Arab Emirates), Hong Kong (China), Jeddah (Saudi Arabia), Keoje (South Korea), Miura (Japan), Mumbai (India), Nanhui District (China), Ninomiya (Japan), Palerm Est. End of Service Date:
N M ino iu mi ra ya
Porthcurno
FLORES-CORVO
System Name:
Flores-Corvo
Landing Points: Flores (Azores), Corvo (Azores), Graciosa (Azores), Faial (Azores) RFS Year: 2014 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
2039 20,000,000 685 0.96 Tbps 6 Fiber Pairs 16 10 Gbps Viatel (Azores)
System Supplier:
Huawei Marine Networks, Nexans
System Installer:
Huawei Marine Networks
Region: EMEA News:
Corvo Flores
Graciosa Faial
http://subtelforum.com/articles/tag/ flores-corvo/
FOG
System Name:
Fiber Optic Gulf
Landing Points: Doha (Qatar), Dubai (UAE), Kuwait City (Kuwait), Manama (Bahrain) RFS Year: 1998 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity:
Kuwait City
Fiber Pairs: Owners:
System Supplier: System Maintainer:
2023 80,000,000 1,286 20 Gbps 4 Fiber Pairs Bahrain Telephone Co., Kuwait Ministry of Communications, Qatar Telecommunication Company, UAE Telecommunications Company Fujitsu E-marine PJSC
Region: EMEA
Manama Doha
Dubai
M
um
ba
i
Fu ja Al irah Se eb
Al K Al ho H b D idd ar oh a
Al
Kuwait City
F Bu aw sh eh r
Mazara
Za Ale x fa ra and na ria
GBICS
System Name: Gulf Bridge International Cable System Landing Points: Alexandria (Egypt), Al Hidd (Bahrain), Al-Khobar (Saudi Arabia), Al Seeb (Oman), Bushehr (Iran), Doha (Qatar), Dubai (United Arab Emirates), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Kuwait City (Kuwait), Mazara (Italy), Mumbai (India), Zafa
Owners:
Gulf Bridge International
RFS Year: 2011
System Supplier:
TE SubCom
2036
System Installer:
e-Marine
Est. End of Service Date:
Est. System Cost (US$): 445,000,000 Total Length (kms): 4,719 Design Capacity: 2.5 Tbps Fiber Pairs: 4 Fiber Pairs express route, 2 Fiber Pairs other landings Channels: 128 Channel Capacity: 10 Gbps
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity: Region:
Gulf Bridge International Inc., Oman Telecommunications Company Xtera Communications 2012 100 Gbps EMEA
News: http://subtelforum.com/articles/tag/gbi/
GCN
Hams Bluff
Galisbay Gustavia
Basseterre Dickenson Bay Baie-Mahault Baliff Canefield
System Name: Global Caribbean Network Landing Points: Baie-Mahault (Guadeloupe), Baliff (Guadeloupe), Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Canefield (Dominica), Dickenson Bay (Antigua), Galisbay (St Martin), Hams Bluff (Virgin Islands), Kingstown (St. Vincent), Le Lamentin (Martinique), Mac RFS Year: 2007 Est. End of Service Date:
2032
Le Lamentin Port Castries Kingstown
Bridgetown
Port Salines
Est. System Cost (US$): 17,520,000 Total Length (kms): 1,926 Initial Capacity: 1.2 Tbps Owners: Global Carribean Network System Supplier: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
Alcatel Submarine Networks Ciena 2013 40 Gbps Americas http://subtelforum.com/articles/tag/gcn/
Macqueripe
GEMINI BERMUDA
System Name:
Gemini Bermuda
Landing Points: Manasquan, NJ (USA), Bermuda RFS Year: 2007 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners: System Installer: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
2032 40,000,000 1,500 C&W, Verizon Orange Marine Verizon Xtera 2016 100 Gbps
Region: Americas News:
Bermuda
http://subtelforum.com/articles/tag/ gemini-bermuda/
GEORGIA-RUSSIA
Novorossiysk
Sochi
System Name: Georgia-Russia Landing Points: Novorossiysk (Russia), Poti (Georgia), Sochi (Russia) RFS Year: 2000 Est. End of Service Date:
2025
Est. System Cost (US$): 20,000,000 Total Length (kms): 280 Initial Capacity: 2.5 Gbps Fiber Pairs: 4 Fiber Pairs Owners: DanTelco, FOPTNET, Rostelecom System Maintainer: OJSC “Rostelecom” Region:
EMEA
Poti
Bude
GLO-1
Vigo Sesimbra Casablanca
System Name:
Globacom-1
Landing Points: Accra (Ghana), Bude (United Kingdom), Casablanca (Morocco), Dakar (Senegal), Lagos (Nigeria), Nouakchott (Mauritania), Sesimbra (Portugal), Vigo (Spain) RFS Year:
2010
Est. End of Service Date:
2035
Est. System Cost (US$): 260,000,000 Total Length (kms): 8,717 Initial Capacity: 640 Gbps Design Capacity: Fiber Pairs: Owners: System Supplier:
2.5 Tbps
Marine Surveyor: System Maintainer: Region: News:
Dakar
2 Fiber Pairs Globacom Ltd. Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks, IT International Telecom Cableship:
Nouakchott
Ile de Batz, IT Intrepid Alcatel Submarine Networks IT International Telecom Canada EMEA http://subtelforum.com/articles/tag/glo-1/
Accra
Lagos
GLOBENET
System Name:
GlobeNet
Landing Points: Bermuda (Bermuda), Boca Raton (USA), Fortaleza (Brazil), Maiquetia (Venezuela), Rio de Janeiro (Brazil), Tuckerton (USA) RFS Year: 2001 Est. End of Service Date:
Tuckerton
Est. System Cost (US$): Total Length (kms): Initial Capacity:
Bermuda
610,000,000 22,690 40 Gbps
Design Capacity:
1.28 Tbps
Owners:
Globenet
System Supplier:
Boca Raton
2026
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
TE SubCom IT International Telecom Canada Xtera Communications 2010 100 Gbps
Region: Americas News:
Punta Gorda
Fortaleza
Rio de Janeiro
http://subtelforum.com/articles/tag/ globenet/
GO-1
System Name:
GO-1
Landing Points: Cantina (Sicily), Mazara (Italy), St George’s Bay (Malta), St Paul’s Bay (Malta) RFS Year: 1995 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2020 10,000,000 290 20 Gbps GO
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Elettra
Cableship:
Teliri
Region: EMEA
Mazara
Catania
St. Paul’s St. Bay George’s Bay
GOKI
System Name:
GOKI
Landing Points: Incheon (Korea), Kita-Kyushu (Japan), Okinawa Prefecture (Japan), Tumon (Guam)
Incheon
RFS Year: 2013 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity:
Kita-Kyushu
Owners:
2038 120,000,000 4,200 80 Gbps AT&T
System Supplier:
Xtera Communications
System Installer:
Kokusai Cable Ship
Region: AustralAsia
Okinawa
Tumon
GONDWANA-1
System Name:
Gondwana-1
Landing Points: Lifou (New Caledonia), Mouli Island (New Caledonia), Noum’ea (New Caledonia), Poindimie (New Caledonia), Sydney (Australia) RFS Year:
2008
Est. End of Service Date:
2033
Est. System Cost (US$): 57,500,000 Total Length (kms): 2,152 Initial Capacity: 640 Gbps Owners: System Supplier:
Post and Telecommunications Office of New Caledonia Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks
Region:
OPT - Nouvelle Caledonie AustralAsia
dn ey
System Maintainer:
Ile de Re
Sy
Cableship:
Poindimie
Mouli Island Lifou
Noum’ea
GREENLAND CONNECT
Nuuk
Landeyjarsandur
Qaqortoq
System Name:
Greenland Connect
Landing Points: Landeyjarsandur (Iceland), Milton (Canada), Nuuk (Greenland), Qaqortoq (Greenland) RFS Year: 2009 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
126,000,000 4,733
Initial Capacity:
20 Gbps
Design Capacity:
960 Gbps
Fiber Pairs: Owners:
Milton
2034
2 Fiber Pairs Tele Greenland
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Cableship: Marine Surveyor: System Maintainer:
Maersk Responder, Blue Castor, Ile de Sein Elettra TELE Greenland A/S
Region: Americas
GUANTÁNAMO BAY CABLE
System Name:
Guantánamo Bay Cable
Landing Points: Guantánamo Bay (Cuba), Florida (USA) RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Channel Capacity:
South Florida
Owners:
2041 31,000,000 1,500 100 Gbps US Government
System Supplier:
Xtera Communications, NSW
System Installer:
IT International Telecom
Marine Surveyor:
US Government
Region: Americas News:
http://subtelforum.com/articles/tag/ guantanamo/
Guantánamo Bay
GWEN
System Name:
Greece to Western Europe Network
Landing Points: Bari (Italy), Corfu (Greece) RFS Year: 2004 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Fiber Pairs: Owners:
2029 20,000,000 647 4 Fiber Pairs OTE
Region: EMEA News:
Bari
Corfu
http://subtelforum.com/articles/tag/ gwen/
HANNIBAL
System Name:
Hannibal
Landing Points: Kelibia (Tunisia), Mazara (Italy) RFS Year: 2009 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
2034 10,000,000 180 9.6 Tbps 3 Fiber Pairs 80 40 Gbps Tunisie Telecom (Tunisia)
System Supplier:
Huawei Marine Networks
System Installer:
Global Marine Systems Limited, Huawei Marine Networks
Cableship: Marine Surveyor:
Sovereign UTEC
Region: EMEA News:
Mazara
Kelibia
http://subtelforum.com/articles/tag/ hannibal/
HANTRU-1
System Name:
Hantru-1
Landing Points: Ebeye (Kwajalein), Majuro (Marshall Islands), Pohnpei (Micronesia), Reagan Test Site (Kwajalein), Tumon (Guam) RFS Year: 2010 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
2035 130,000,000 2,908 Hannon Armstrong
System Supplier:
TE SubCom
System Installer:
TE SubCom
System Maintainer:
Truestone LLC
Region: AustralAsia News:
http://subtelforum.com/articles/tag/ hantru-1/
Tumon
Ebeye
Pohnpei
Reagan Test Site Majuro
HAWAIKI Oregon
Hawaii
Wallis Vanuatu Fiji
New Caledonia Sydney
Samoa American Samoa
Norfolk Island Whangarei
System Name:
Hawaiki [Planned]
Landing Points: Oregon (USA), Sydney (Australia), Hawaii (USA), Norfolk Island, New Caledonia, Fiji, Samoa, American Samoa, Whangarei (New Zealand) RFS Year: 2018 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels:
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Channel Capacity: Owners:
2043 300,000,000 14,000 12.8 Tbps 2 Fiber Pairs 64 100 Gbps Hawaiki Submarine Cable
System Supplier:
TE SubCom
System Installer:
TE SubCom
Region: Transpacific News:
http://subtelforum.com/articles/tag/ hawaiki/
HAWK CABLE SYSTEM
Marseille
System Name:
Anatoliko
Hawk Cable System
Landing Points: Alexandria (Egypt), Anatoliko (Cyprus), Marseille (France) RFS Year:
2011
Est. End of Service Date:
2035
Est. System Cost (US$): 250,000,000 Total Length (kms): 3,181 Initial Capacity: 2.72 Tbps Fiber Pairs: Channels: Channel Capacity: Owners: System Supplier:
4 Fiber Pairs 68 10 Gbps Global Cloud Xchange Fujitsu
System Installer: Elettra, Orange Marine Marine Surveyor: Region: News:
Fugro EMEA http://subtelforum.com/articles/tag/ hawk/
Alexandria
HIBERNIA ATLANTIC
Ly n
n
H
er r Co ing ve
Dublin
So ut hp or t
Coleraine
System Name:
Hibernia Atlantic
Landing Points: Coleraine (Ireland), Dublin (Ireland), Herring Cove (Canada), Lynn (USA), Southport (United Kingdom) RFS Year: 2001 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2026 320,000,000 12,111 10.16 Tbps Columbia Ventures Corporation
System Supplier:
Tyco Telecommunications SSI
System Installer:
FCR
Cableship: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Vercors, Iberus, Nordic King, Teneo, Dock Express 20, Global Mariner, Atlantida Hibernia Netoworks Huawei Marine Networks 2011 100 Gbps
Region: Transatlantic News:
http://subtelforum.com/articles/tag/ hibernia-atlantic/
HIBERNIA EXPRESS
System Name:
Hibernia Express
Landing Points: Halifax, Nova Scotia (Canada); London, UK; Cork, Ireland RFS Year: 2015 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
2040 120,000,000 4,600 53 Tbps 6 Fiber Pairs 100 100 Gbps, 200 Gbps on select segments Hibernia Atlantic
System Supplier:
TE SubCom
System Installer:
TE SubCom
Marine Surveyor:
EGS
Survey Boat: RV Ridley Thomas Region: Transatlantic News:
http://subtelforum.com/articles/tag/ hibernia-express/
Cork
New York
London
HONOTUA
System Name:
Honotua
Landing Points: Huahine (French Polynesia), Moorea (French Polynesia), Papeete (French Polynesia), Spencer Beach, Hawaii (USA), Uturoa (Raiatea, French Polynesia), Vaitape (Bora Bora, French Polynesia) RFS Year: 2009
Spencer Beach
Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: System Supplier:
2034 122,000,000 4,634 640 Gbps OPT French Polynesia Alcatel-Lucent Submarine Networks
Region: AustralAsia
pe et e
H ua
re a Pa
oo
M
U
tu
ro a
Vaitape
hi ne
News:
http://subtelforum.com/articles/tag/ honotua/
HSCS
System Name:
Hokkaido-Sakhalin Cable System
Landing Points: Ishikari (Japan), Nevelsk (Russia) RFS Year: 2008 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Owners:
Ishikari
20,000,000 559 640 Gbps NTT Communications, TTK
System Supplier:
NEC
System Installer:
KDD
Cableship:
Nevelsk
2033
System Maintainer:
Subaru NTT Communications Corporation, TTK
Region: AustralAsia
HUGO
System Name:
Hugo
Landing Points: Guernsey (Guernsey), Lannion (France), Porthcurno (United Kingdom) RFS Year: 2006 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
11,960,000 426 3.3 Tbps C&W
System Supplier:
Alcatel Submarine Networks
System Installer:
Tyco SSI
Cableship:
Porthcurno
2031
System Maintainer:
Tycom Reliance Vodafone Limited
Region: EMEA
Guernsey Lannion
News:
http://subtelforum.com/articles/tag/ hugo/
I2I
Chennai
System Name:
i2i
Landing Points: Chennai (India), Tuas (Singapore) RFS Year:
2002
Est. End of Service Date:
2027
Est. System Cost (US$): 90,000,000 Total Length (kms): 3,100 Initial Capacity: 160 Gbps Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners: Marine Surveyor: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
42 Tbps 8 Fiber Pairs 105 100 Gbps Bharti Airtel C&C Technologies Ciena 2014 100 Gbps Indian Ocean Pan-East Asian http://subtelforum.com/articles/tag/i2i/
Tuas
ICN1
System Name:
Interchange I
Landing Points: Port Vila (Vanuatu), Suva (Fiji) RFS Year: 2014 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2039 32,000,000 1,259
Initial Capacity:
20 Gbps
Design Capacity:
320 Gbps
Owners:
Interchange Limited
System Supplier:
TE SubCom, Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Region: AustralAsia News:
Port Vila
http://subtelforum.com/articles/tag/ icn1/
Suva
ICN2 (INTERCHANGE II)
System Name:
Interchange II [Planned]
Landing Points: Port Moresby (Papau New Guinea), Port Vila (Vanuatu), Luganville (Vanuatu), Honiara (Solomon Islands) RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
2041 72,000,000 3,500 1.28 Tbps 1 Fiber Pair 32 40 Gbps Interchange Limited
Region: AustralAsia
Port Moresby
Honiara Luganville Port Vila
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
I-ME-WE Marseille
Catania Tripoli Alexandria Suez Fujairah
Karachi
Jeddah Mumbai System Name:
India-Middle East-Western Europe
Landing Points: Alexandria (Egypt), Catania (Italy), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Karachi (Pakistan), Marseille (France), Mumbai (India), Suez (Egypt), Tripoli (Lebanon) RFS Year:
2010
Est. End of Service Date:
2035
Est. System Cost (US$): 320,000,000 Total Length (kms): 13,000 Initial Capacity: 520 Gbps Design Capacity: Owners:
System Supplier:
3.84 Tbps Bharti Airtel, Etisalat, France Telecom, Ogero (Lebanon), PTCL (Pakistan), STC (Saudi Arabia), Tata Communications, Telecom Egypt, Telecom Italia Sparkle Alcatel-Lucent Submarine Networks
System Installer: S.B. Submarine Systems, NEC
Cableship: Marine Surveyor: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Cable Innovator Fugro Orange, TATA Communications, Telecom Egypt, Telecom Italia Sparkle Mitsubishi 2012 40 Gbps
Region: EMEA News: http://subtelforum.com/articles/tag/ime-we/
ITALY-ALBANIA
Durres
Bari
System Name:
Italy-Albania
Landing Points: Bari (Italy), Durres (Albania) RFS Year:
1998
Est. End of Service Date:
2023
Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners: Region:
10,000,000 236 2.5 Gbps 1 Fiber Pair Telecom Italia Sparkle EMEA
ITALY-GREECE
Otranto Corfu
System Name:
Italy-Greece
Landing Points: Corfu (Greece), Otranto (Italy) RFS Year:
1995
Est. End of Service Date:
2020
Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners: Region:
10,000,000 161 1.69 Gbps 4 Fiber Pairs Telecom Italia EMEA
ITALY-LIBYA
System Name:
Italy-Libya
Landing Points: Mazara (Italy), Tripoli (Libya) RFS Year: 2000 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
570 2.5 Gbps
Design Capacity:
40 Gbps
Owners: System Maintainer: Upgrade Year: Upgraded Capacity:
Tripoli
10,000,000
Initial Capacity: Fiber Pairs:
Mazara
2025
2 Fiber Pairs Telecom Italia Telecom Italia Sparkle 2011 40 Gbps
Region: EMEA
ITALY-MONACO
Savona Monaco
System Name:
Italy-Monaco
Landing Points: Monaco (Monaco), Savona (Italy) RFS Year: 1995 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer:
2020 10,000,000 162 565 Mbps 1 Fiber Pairs Telecom Italia Telecom Italia Sparkle
Region: EMEA
JAKA2DELEMA
Sangatta System Name: JaKa2DeLeMa Landing Points: Bandjermasin (Indonesia), Benculuk (Indonesia), Jember (Indonesia), Ketapang (Indonesia), Mataram (Indonesia), Pangkalanbun (Indonesia), Pontianak (Indonesia), Sangata (Indonesia), Toweli (Indonesia) RFS Year: 2010 Est. End of Service Date:
2035
Pontianak Toweli Ketapang Pangkalanbun Bandjermasin
Est. System Cost (US$): 116,000,000 Total Length (kms): 1,800 Initial Capacity: 960 Gbps Design Capacity: 9.6 Tbps Fiber Pairs: 3 Fiber Pairs Channels: 32 Channel Capacity: 100 Gbps Owners: PT Telekomunikasi Indonesia System Supplier:
NSW, Fujitsu
System Installer: Fujitsu, Orange Marine Upgrader: Upgrade Year: Upgraded Capacity: Region:
Fujitsu 2013 100 Gbps AustralAsia
Jember Benculuk
Mataram
JAKABARE
System Name:
JAKABARE
Landing Points: Batam (Indonesia), Jakarta (Indonesia), Pontianak (Indonesia), Tuas (Singapore) RFS Year: 2009 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
Tuas
Batam
40,000,000 1,330
Initial Capacity:
160 Gbps
Design Capacity:
1.28 Tbps
Owners:
Pontianak
2034
Indosat
System Supplier:
NEC
System Installer:
NEC, ASEAN Cableship, Orange Marine
Cableship:
Cable Innovator
Region: AustralAsia News:
Jakarta
http://subtelforum.com/articles/tag/ jakabare/
JAPAN-US
i ak a ar m ib ya ta ru Ki Ma
Point Arena Morro Bay
Shima
Makaha System Name:
Japan-US
Landing Points: Kitaibaraki (Japan), Makaha (Hawaii), Maruyama (Japan), Morro Bay (USA), Point Arena (USA), Shima (Japan) RFS Year:
2001
Est. End of Service Date:
2026
Est. System Cost (US$): 590,000,000 Total Length (kms): 21,880 Initial Capacity: 640 Gbps Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners: System Supplier:
6.4 Tbps 4 Fiber Pairs 16 100 Gbps AT&T, Japan Telecom, KDDI, MCIWorldCom, NTTWN Alcatel Submarine Networks, Fujitsu, Ocean Cable Company
System Installer: Global Marine Systems Limited Cableship: System Maintainer:
Subaru, Cable Innovator AT&T, KDDI, NTT Communications Corporation, Softbank Telecom Corp, Verizon Ltd
Upgrader:
Ciena
Upgrade Year: 2012 Upgraded Capacity: 100 Gbps Region: Transpacific News: http://subtelforum.com/articles/tag/ japan-us/
JASUKA
System Name:
Jasuka
Landing Points: Batam (Indonesia), Jakarta (Indonesia), Pontianak (Indonesia), Tanjung Pandan (Indonesia) RFS Year: 2006 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
Batam
280,000,000 354
Initial Capacity:
20 Gbps
Design Capacity:
320 Gbps
Owners:
Pontianak
2031
PT Telekom
System Supplier:
Nokia Siemens Networks
System Installer:
Nokia Siemens Networks
Marine Surveyor:
Nokia Siemens Networks
Upgrader:
Nokia Siemens Networks
Upgrade Year: Upgraded Capacity:
2011 40 Gbps
Region: AustralAsia
Tanjung Pandan
Jakarta
KAFOS
System Name:
Karadeniz Fiber Optik Sistemi
Landing Points: Istanbul (Turkey), Mangalia (Romania), Varna (Bulgaria) RFS Year: 1997 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
Varna
Istanbul
20,000,000 4,640 1.2 Gbps BTC, Turk Telecom
System Supplier:
Alcatel Submarine Networks
System Installer:
FCR
Cableship:
Mangalia
2022
Vercors
Region: EMEA
KATTEGAT-2
System Name:
Kattegat-2
Landing Points: Lyngsa, Denmark; Osterby, Denmark; Skalvik, Sweden; Vestero, Denmark RFS Year: 2001 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
2026 10,000,000 75 TDC
Region: EMEA
Jutland
Gothenburg
KELTRA-2
System Name:
Keltra-2
Landing Points: Kelibia (Tunisia), Trapini (Italy) RFS Year: 2007 Est. End of Service Date: Total Length (kms): Design Capacity: Fiber Pairs: Owners:
2032 209 20 Gbps 6 Fiber Pairs Telecom Italia, Tunisie Telecom (Tunisia)
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
System Maintainer:
Telecom Italia Sparkle
Region: EMEA
KHULNA-CHENNAI
Khulna
System Name:
Khulna-Chennai
Landing Points: Chennai (India), Khulna (Bangladesh) RFS Year: 2010 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
Chennai
2035 48,000,000 115 Bangladesh Submarine Cable Company
Region: Indian Ocean Pan-East Asian
KJCN
System Name: Korea-Japan Cable Network Landing Points: Fukuoka (Japan), Kita-Kyushu (Japan), Pusan (South Korea) RFS Year: 2002 Est. End of Service Date:
2027
Total Length (kms): 500 Initial Capacity: 2.88 Tbps Design Capacity: 28.8 Tbps
Pusan
Fiber Pairs: 12 Fiber Pairs Channels: 24 Channel Capacity: 100 Gbps Owners: KEPCO, KT Coropration, NTT Communications, SOFTBANK Telecom Corp System Supplier:
Fujitsu
System Installer: Fujitsu Cableship: Maersk Recorder System Maintainer: KT Corporation, NTT Communications Corporation, SoftBank Telecom Corp Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
Ciena 2015 100 Gbps AustralAsia http://subtelforum.com/articles/?s=KJCN
Kitakyushu Fukuoka
KODIAK KENAI
System Name:
Kodiak Kenai
Landing Points: Anchorage (USA), Homer (USA), Kenai (USA), Kodiak (USA), Narrow Cape (USA), Seward (USA) RFS Year: 2006 Est. End of Service Date:
Anchorage Kenai Seward Homer
Est. System Cost (US$): Total Length (kms):
2031 30,000,000 971
Initial Capacity:
2.5 Gbps
Design Capacity:
10 Gbps
Fiber Pairs: Owners: Upgrader: Upgrade Year: Upgraded Capacity:
4 Fiber Pairs Kodiak Kenai Cable Company Infinera 2010 10 Gbps
Region: Americas
Kodiak
Narrow Cape
News:
http://subtelforum.com/ articles/?s=kodiak
KUWAIT-IRAN
System Name:
Kuwait-Iran
Landing Points: Kharg (Iran), Soroosh (Iran), Failaka (Kuwait) RFS Year: 2006 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
System Installer: System Maintainer:
Failaka Soroosh
Kharg
2031 20,000,000 334 2.5 Gbps 6 Fiber Pairs Ministry of Communication, Kuwait and Telecommunication Infrastructure Company, Iran e-Marine E-marine PJSC
Region: EMEA
LEV
Mazara
Yeroskipou
Tel Aviv
System Name:
LEV
Landing Points: Mazara (Italy), Tel Aviv (Israel), Yeroskipos (Cyprus) RFS Year:
1999
Est. End of Service Date:
2024
Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Channels: Owners: System Supplier: System Maintainer: Region:
175,000,000 2,600 2.5 Gbps 2 Fiber Pairs 8 wavelengths of 1550 nm Telecom Italia Sparkle Alcatel Submarine Networks, Tyco Telecommunications Cyprus Telecommunications Authority EMEA
LION
System Name:
Lower Indian Ocean Network
Landing Points: Sainte Marie (Reunion Island), Terre Rouge (Mauritius), Toamasina (Madagascar) RFS Year:
2009
Est. End of Service Date:
2034
Tomasina Terre Rouge
Est. System Cost (US$): 30,000,000 Total Length (kms): 1,091 Initial Capacity: 20 Gbps Fiber Pairs: Owners: System Supplier:
2 Fiber Pairs France Telecom, Mauritius Telecom, Orange Madagascar Alcatel-Lucent Submarine Networks
System Installer: FCR, Orange Marine Cableship: System Maintainer: Region: News:
Chamarel Mauritius Telecom, Orange Indian Ocean Pan-East Asian http://subtelforum.com/articles/tag/ lion/
Sainte Marie
LION-2
System Name:
Mombasa
Lower Indian Ocean Network 2
Landing Points: Mombasa (Kenya), Mayotte (Mayotte) RFS Year: 2012 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Owners:
System Installer:
2037 76,000,000 3,000 1.28 Tbps France Telecom-Orange, Mauritius Telecom, Orange Madagascar, Telkom Kenya, Emtel Ltd Alpha Logistics, Elettra, Orange Marine
Region: Indian Ocean Pan-East Asian News:
Mayotte
Co nn to L ectio ion n -1
http://subtelforum.com/articles/tag/ lion-2/
MAC System Name:
Brookhaven
Mid-Atlantic Crossing
Landing Points: Brookhaven (USA), Hollywood (USA), St Croix (US Virgin Islands) RFS Year:
2000
Est. End of Service Date:
2025
Est. System Cost (US$): 200,000,000 Total Length (kms): 7,461 Initial Capacity: 20 Gbps Fiber Pairs: Owners: System Supplier:
2 Fiber Pairs Global Crossing Alcatel Submarine Networks
System Installer: FCR Cableship: System Maintainer:
Fresnel Level 3 Communications Ltd
Hollywood
Upgrader: Upgrade Year: Upgraded Capacity: Region:
Infinera 2010, 2011 10 Gbps, 40 Gbps Americas
News: http://subtelforum.com/articles/?s=midatlantic+crossing
St. Croix
MAIN ONE
System Name:
Main One
Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Casablanca (Morocco), Dakar (Senegal), Lagos (Nigeria), Port Harcourt (Nigeria), Seixal (Portugal), Tenerife (Spain)
Seixal
RFS Year: 2010 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Design Capacity: Channel Capacity: Owners:
7,000 1.92 Tbps 10 Tbps 100 Gbps Main One Cable Company TE SubCom
System Installer:
TE SubCom
System Maintainer:
a La r c Ac
240,000,000
System Supplier: Cableship:
gos
2035
Upgrader: Upgrade Year: Upgraded Capacity:
Resolute Main One Cable Company, Tyco Electronics Subsea Communications LLC Xtera 2015 100 Gbps
Region: EMEA News:
http://subtelforum.com/ articles/?s=Main+One
MAIN ONE EXPANSION
System Name:
Main One Expansion [Planned]
Landing Points: Lagos (Nigeria), Port Harcourt (Nigeria) RFS Year: 2017 Est. End of Service Date:
Seixal
Est. System Cost (US$): Total Length (kms): Owners:
2042 40,000,000 1,100 Main One
Region: EMEA
gos
a cra L
Ac
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Port ourt Harc
MATRIX
Batam Changi
Jakarta
System Name:
Matrix
Landing Points: Batam (Indonesia), Changi (Singapore), Jakarta (Indonesia) RFS Year:
2008
Est. End of Service Date:
2032
Est. System Cost (US$): 30,000,000 Total Length (kms): 1,438 Initial Capacity: 60 Gbps Design Capacity: Fiber Pairs: Owners: System Supplier:
2.56 Tbps 4 Fiber Pairs Matrix Networks and NAP Info TE Subcom
System Installer: Global Marine Systems Limited Cableship: Region:
Wave Mercury, Cable Networker (barge) AustralAsia
MAYA-1
System Name:
MAYA-1
Landing Points: Cancun (Mexico), Hollywood (USA), Maria Chiquita (Panama), Puerto Limon (Costa Rica), Tolu (Colombia) RFS Year: 2000 Est. End of Service Date: Est. System Cost (US$):
Hollywood
Total Length (kms): Initial Capacity: Owners:
120,000,000 4,506 10 Gbps MAYA-1 Consortium
System Supplier:
Alcatel Submarine Networks, Tyco Telecommunications
Marine Surveyor:
C&C Technologies
Upgrader: Upgrade Year:
Cancun
2025
Upgraded Capacity:
Alcatel-Lucent Submarine Networks 2012 40 Gbps
Region: Americas News:
Puerto Limon
Maria Chiquita
Tolu
http://subtelforum.com/ articles/?s=maya-1
MBDC
System Name:
Moratelindo Batam - Dumai Cable
Landing Points: Batam (Indonesia), Dumai (Indonesia) RFS Year: 2009 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2034 40,000,000 330 10 Gbps Moratelindo
Region: AustralAsia
Dumai
Batam
MCT
System Name:
Malaysia-Cambodia-Thailand [Planned]
Landing Points: Cherating, Malaysia; Rayoung, Thailand; branching unit to Sihanoukville, Cambodia RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
Rayoung
Design Capacity: Fiber Pairs: Channels: Channel Capacity:
Sihanoukville
Owners:
System Supplier:
2041 40,000,000 1,425 30 Tbps 6 Fiber Pairs 50 100 Gbps Telekom Malaysia Berhad, Symphony Communication Public Company Limited, Telcotech limited Huawei Marine Networks
Region: AustralAsia News:
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Cherating
http://subtelforum.com/articles/tag/mct/
MED CABLE NETWORK
System Name:
Med Cable Network
Landing Points: Algiers (Algeria), Annaba (Algeria), Marseille (France) RFS Year: 2005 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity:
Marseille
Owners: System Maintainer:
2030 40,000,000 1,300 20 Gbps Med Cable Middle East & North Africa (MENA) Submarine Cable Systems
Region: EMEA
Algiers
Annaba
MEDNAUTILUS
System Name:
MedNautilus
Landing Points: Catania (Italy), Chania (Greece), Haifa (Israel), Istanbul (Turkey), Koropi (Greece), Tel Aviv (Israel) RFS Year: 2001 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
Istanbul
5,729 3.84 Tbps
Design Capacity:
38.4 Tbps
Channels:
Ca ta ni a
190,000,000
Initial Capacity: Fiber Pairs: Channel Capacity:
Koropi
2026
Owners:
6 Fiber Pairs 64 100 Gbps Telecom Italia Sparkle
System Supplier:
Alcatel Submarine Networks
System Installer:
Orange Marine
Chania
Haifa
Tel Aviv
Upgrader:
Infinera
Upgrade Year: 2011, 2012, 2013 Upgraded Capacity: 10 Gbps, 40 Gbps, 100 Gbps Region: EMEA News: http://subtelforum.com/ articles/?s=mednautilus
MELITA-1
System Name:
Melita-1
Landing Points: Pozallo (Italy), St Paul’s Bay (Malta) RFS Year: 2009 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2034 14,000,000 100 50 Mbps Melita Infrastructure Ltd.
Region: EMEA
Pozallo
St. Paul’s Bay
MENA
Mazara
Alexandria Suez Zafarana
M
um
ba
i
Jeddah
Al Seeb
System Name:
Middle East North Africa
Landing Points: Abu Talat (Egypt), Al Seeb (Oman), Jeddah (Saudi Arabia), Mazara (Italy), Mumbai (India), Zafarana (Egypt) RFS Year:
2014
Est. End of Service Date:
2039
System Supplier:
Alcatel Submarine Networks, TE SubCom
System Installer:
Alcatel Submarine Networks, TE SubCom, e-Marine
Cableship:
Est. System Cost (US$): 210,000,000 Total Length (kms): 8,800 Initial Capacity: 57.6 Tbps Fiber Pairs: Channels: Channel Capacity: Owners:
6 Fiber Pairs 96 100 Gbps Orascom Telecom
Marine Surveyor: System Maintainer:
Maersk Responder, Ile de Sein, Niwa, Decisive EGS, Blue Star, Elettra Middle East & North Africa (MENA) Submarine Cable Systems, Oman Telecommunications Company
Region: EMEA News: http://subtelforum.com/articles/tag/ mena/
MIC-1
System Name:
Moratel International Cable 1
Landing Points: Batam (Indonesia), Changi (Singapore) RFS Year: 2008 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: System Installer:
2033 10,000,000 70 10 Gbps Moratelindo Global Marine Systems Limited
Region: AustralAsia
Changi Batam
MICRONESIA CABLE SYSTEM
System Name:
Micronesia Cable System
Landing Points: Majuro (Marshall Islands), Kwajalein (Marshall Islands), Pohnpei (Micronesia), Guam RFS Year: 2011 Est. End of Service Date: Total Length (kms): Owners:
2036 174 Federals States of Micronesia Telecommunications Authority, Marshall Island National Telecommunications Authority
System Supplier:
TE SubCom
System Installer:
TE SubCom
Region: AustralAsia
Guam
Pohnpei
Majuro Kwajalein
MINERVA
Mazara
Catania
Yeroskipou
System Name:
Minerva
Landing Points: Catania (Italy), Mazara (Italy), Yeroskipos (Cyprus) RFS Year:
2007
Est. End of Service Date:
2032
Initial Capacity: Channels: Owners: System Supplier: Region:
10 Gbps DWDM wavelengths Telecom Italia Sparkle Alcatel-Lucent Submarine Systems EMEA
MKCS
System Name:
Mataram-Kupang Cable System
Landing Points: Mataram (Indonesia), Sumbawa Besar (Indonesia), Ambalawi (Indonesia), Saraemee (Indonesia), Waingapu (Indonesia), Ende (Indonesia), Kupang (Indonesia) RFS Year: 2011 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
2036 94,000,000 1,318 1.8 Tbps 6 Fiber Pairs 30 10 Gbps PT Telkom
System Supplier:
Huawei Marine Networks, Nexans
System Installer:
Huawei Marine Networks
Region: AustralAsia News:
Sum Mataram Besa bawaRaba r Waingapu Kupang
http://subtelforum.com/articles/tag/ mkcs/
MOANA
Hawaii
Samoa Cook Islands New Zealand System Name:
Moana Submarine Cable System [Planned]
Landing Points: New Zealand; Hawaii; Cook Islands; Samoa RFS Year: 2018 Est. End of Service Date:
2043
Total Length (kms):
9,700
Design Capacity:
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Channel Capacity: Owners:
20 Tbps 200 Gbps Bluesky Pacific Group
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Region: AustralAsia News:
http://subtelforum.com/articles/tag/ moana/
MONET
System Name:
Monet [Planned]
Landing Points: Santos (Brazil), Fortaleza (Brazil), Boca Raton, Florida (United States) RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Owners:
Boca Raton
2041 280,000,000 10,556 64 Tbps 6 Fiber Pairs Algar Telecom, Angola Cables, Antel, Google
System Supplier:
TE SubCom
System Installer:
TE SubCom
Region: Americas
Fortaleza
Project Completion Phases:
Santos
Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
MYTHIC
System Name:
Mythic [Planned]
Landing Points: Myanmar branches to Malaysia and Thailand RFS Year: 2017 Est. End of Service Date:
2042
Total Length (kms):
1,600
Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
20 Tbps 2 Fiber Pairs 100 100 Gbps Campana Group
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Region: AustralAsia
Myanmar
News:
http://subtelforum.com/articles/tag/ mythic/
Thailand
Malaysia
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
NCP
System Name:
New Cross Pacific [Planned]
Landing Points: Hillsboro, Oregon (USA); Chongming, China; Nanhui, China; Lingang, China; Busan, South Korea; Toucheng, Taiwan; Maruyama, Japan RFS Year: 2017 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Channel Capacity:
Korea China
Japan
Taiwan
USA
Owners:
2042 350,000,000 14,000 80 Tbps 100 Gbps China Mobile, China Telecom, China Unicom, Chunghwa Telecom, KT Corporation, Microsoft, Softbank Mobile Corp
System Supplier:
TE SubCom
System Installer:
TE SubCom
Region: Transpacific News:
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
http://subtelforum.com/articles/tag/ NCP/
NCSCS
System Name:
Nigeria-Cameroon Submarine Cable System
Landing Points: Kribi, Cameroon; Lagos, Nigeria RFS Year: 2015 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs: Owners:
2040 30,000,000 1,100 40 Gbps 12.8 Tbps 6 Fiber Pairs Cameroon Government, MainOne
System Supplier:
Huawei Marine Networks, Nexans
System Installer:
Huawei Marine Networks
Region: EMEA
s ago
News:
L
Kribi
http://subtelforum.com/articles/tag/ ncscs/
NEPTUNE CANADA
System Name:
NEPTUNE Canada
Landing Points: Port Alberni (Canada) RFS Year: 2007 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
2032 62,000,000 800 University of Victoria
System Supplier:
Alcatel Submarine Networks
System Installer:
Alcatel Submarine Networks
Cableship: Marine Surveyor:
Ile de Sein NEPTUNE Canada
Region: Americas
Port Alberni
NORSEA COM-1
System Name:
Norsea Com-1
Landing Points: Lowestoft (United Kingdom), Tysvær (Norway)
Tysvaer
RFS Year: 1999 Est. End of Service Date: Total Length (kms): Initial Capacity: Owners: System Supplier: System Maintainer:
2024 800 160 Gbps North Sea Communications AS Alcatel AKN TeliaSonera International Carrier AB
Region: EMEA
Lowestoft
NORTHSTAR
System Name:
Northstar
Landing Points: Juneau (USA), Nedonna Beach (USA), Valdez (USA), Whittier (USA)
Whittier
RFS Year: 1999
Valdez
Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
Juneau
Initial Capacity: Owners:
2024 90,000,000 3,385 10 Gbps Alaska Communications Systems
System Supplier:
Alcatel Submarine Networks
System Installer:
C&W (Marine)
Cableship: System Maintainer:
Maersk Fighter, Fu Lai ACS Cable Systems
Region: Americas
Nedonna Beach
ORVAL
System Name:
Orval [Planned]
Landing Points: Oran, Algeria; Valencia, Spain RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Channel Capacity: Owners:
2041 20,000,000 560 20 Tbps 100 Gbps Algerian Ministry of Post, Information Technology and Communications
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Region: EMEA News:
Valencia
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Oran
http://subtelforum.com/articles/tag/ orval/
PAC
Grover Beach Tijuana
Mazatlán St. Croix
System Name: Pan-American Crossing Landing Points: Colon (Panama), Fort Amadour (Panama), Grover Beach (USA), Mazatlán (Mexico), Puerto Viejo (Venezuela), St Croix (US Virgin Islands), Tijuana (Mexico) RFS Year: 2001 Est. End of Service Date:
2026
Est. System Cost (US$): 350,000,000 Total Length (kms): 9,451 Initial Capacity: 10 Gbps Owners: Global Crossing System Supplier:
Tyco Telecommunications
Cableship: Agile Marine Surveyor:
C&C Technologies
System Maintainer: Level 3 Communications Ltd Upgrader: Region:
Xtera Communications Americas
Colon Fort Amadour
Puerto Viejo
Guam
PALAU-GUAM
Palau
System Name:
Palau-Guam [Planned]
Landing Points: Palau, Guam RFS Year: 2016
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Est. End of Service Date: Owners:
2041 Palau Telecoms
System Supplier:
Xtera Communications
System Installer:
IT International Telecom
Region: AustralAsia News:
http://subtelforum.com/ articles/?s=palau+guam
PAN-AM
System Name:
Magens Bay Butler’s Bay
Pan American
Landing Points: Arica (Chile), Baby Beach (Aruba), Barranquilla (Colombia), Battery Pratt (Panama), Butler’s Bay (St. Croix), Lurin (Peru), Magens Bay (Virgin Islands), Panama City (Panama), Punto Fijo (Venezuela), Salinas (Ecuador) RFS Year: 1999 Est. End of Service Date:
Baby Beach Battery Pratt
Barranquilla Punto Fijo Panama City
Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
Marine Surveyor: System Maintainer:
2024 260,000,000 6,867 >10 Gbps Antel (El Salvador), AT&T, Cable Andino, CANTV (Venezuela), CNT, C&W, Embratel, Entel (Chile), Setar, Telecom Colombia, Telmex C&C Technologies AT&T, Telefonica International Wholesale Services
Region: Americas
Lurin
Arica
PANGEA
Måde Fanø
Redcar
Lowestoft
Beverwijk System Name:
Pangea
Landing Points: Beverwijk (Netherlands), Fanø (Denmark), Lowestoft (United Kingdom), Måde (Denmark), Redcar (United Kingdom) RFS Year:
2000
Est. End of Service Date:
2025
Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
20,000,000 511 7 Tbps Pangea Ltd
System Supplier:
Alcatel Submarine Networks
System Installer:
Nexans
Cableship:
Pleijel
Marine Surveyor:
Fugro
Region:
EMEA
PC-1
Harbor Pointe Shima
Ajigaura
Grover Beach System Name:
Pacific Crossing 1
Landing Points: Grover Beach (USA), Harbor Pointe (USA), Shima (Japan), Shima (Japan) RFS Year:
2000
Est. End of Service Date:
2025
Est. System Cost (US$): Total Length (kms): Initial Capacity: Design Capacity: Owners:
650,000,000 20,910 1.8 Tbps 3 Tbps NTT Communications
System Supplier:
Tyco Telecommunications
Marine Surveyor:
C&C Technologies
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
Alcatel-Lucent Submarine Networks Infinera 2013 40 Gbps, 100 Gbps Transpacific http://subtelforum.com/articles/tag/pc1/ http://subtelforum.com/articles/tag/ pacific-crossing/
PCCS Jacksonville
Isla System Name:
Pacific Caribbean Cable System
Landing Points: Jacksonville, Florida (USA); Tortola, Virgin Islands (UK); Isla Verde, Puerto Rico; Hudishibana, Aruba; Cartagena, Colombia; Maria Chiquita, Panama; Balboa, Panama; Manta, Ecuador; Tera Cora, Curaçao Est. End of Service Date:
2040
Est. System Cost (US$): 160,000,000 Total Length (kms): 6,000 Design Capacity: Owners:
80 Tbps 100 Gbps Cable & Wireless Communications, Setar, Telconet, Telefónica Global Solutions, United Telecommunication Services
System Supplier:
Alcatel-Lucent Submarine Networks
Marine Surveyor:
EGS
Survey Boat: Region: News:
Cartagena
Ch iq ui ta
2015
RV Ridley Thomas Americas http://subtelforum.com/articles/tag/ pccs/
ana
ishib
Hud
M ar ia
RFS Year:
Channel Capacity:
de Tortola Ver
Manta
Balboa
orá
C Tera
PEC
Broadstairs Seaford
System Name:
Pan-European Crossing
Landing Points: Bredene (Belguim), Broadstairs (United Kingdom), Seaford (United Kingdom), Veules-les-Roses (France) RFS Year:
1999
Est. End of Service Date:
2024
Est. System Cost (US$): 20,000,000 Total Length (kms): 170 Initial Capacity: 10 Gbps Owners: System Maintainer: Region:
Global Crossing Level 3 Communications EMEA
Veules-les-Roses
Bredene
PLCN
Los Angeles Hong Kong
System Name:
Pacific Light Cable Network [Planned]
Landing Points: Hong Kong; Los Angeles, USA RFS Year: 2018 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity:
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Fiber Pairs: Channels: Channel Capacity: Owners:
2043 400,000,000 12,800 120 Tbps 5 Fiber Pairs 240 100 Gbps Pacific Light Data Communication
System Supplier:
TE SubCom
System Installer:
TE SubCom
Region: Transpacific
Piti
PPC-1
Madang System Name:
Pipe Pacific Cable
Landing Points: Madang (Papua New Guinea), Piti (Guam), Sydney (Australia) RFS Year:
2009
Est. End of Service Date:
2034
Est. System Cost (US$): 180,000,000 Total Length (kms): 7,185 Initial Capacity: 40 Gbps Design Capacity: Owners: System Supplier:
2.56 Tbps PIPE Networks Ltd. Tyco Telecommunications
System Installer: Tyco Telecommunications Cableship: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
Durable, Decisive Infinera 2012 100 Gbps AustralAsia http://subtelforum.com/articles/ tag/ppc-1/ http://subtelforum.com/ articles/?s=PPC-1
Sydney
QATAR-UAE
System Name:
Qatar-UAE
Landing Points: Das Island (UAE), Halul (Qatar) RFS Year: 2004 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2029 10,000,000 208
Initial Capacity:
20 Gbps
System Installer:
e-Marine
Cableship: System Maintainer:
Etisalat E-marine PJSC
Region: EMEA
Halul Das
QUINTILLION SUBSEA
Barrow Wainwright
Prudhoe Bay
Point Hope
Kotzebue Nome System Name:
Quintillian Subsea [Planned]
Landing Points: Oliktok (USA), Barrow (USA), Wainright (USA), Kotzebue (USA), Point Hope (USA), Nome (USA) RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
2041 150,000,000 1,200 Quintillion Subsea Holdings
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Marine Surveyor:
Fugro Pelagos
Survey Boat: Pacific Star, Dreamcatcher Region: Americas News:
http://subtelforum.com/articles/tag/ quintillion/
RJCN
System Name:
Russian-Japan Cable Network
Landing Points: Nakhodka (Russia), Naoetsu (Japan) RFS Year: 2006 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: System Maintainer:
2031 50,000,000 1,795 640 Gbps Rostelecom KDDI, OJSC “Rostelecom”
Region: AustralAsia
Nakhodka
Naoetsu
.com
Telecoms consulting of submarine cable systems for regional and trans-oceanic applications
RNAL
Pusan
Wada
System Name:
Toucheng Tong Fuk
Reach North Asia Loop
Landing Points: Pusan (South Korea), Tong Fuk (Hong Kong), Toucheng (Taiwan), Wada (Japan) RFS Year:
2001
Est. End of Service Date:
2026
Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
900,000,000 9,792 80 Gbps 6 Fiber pairs FLAG Telecom, Level 3 Communications Global Cloud Xchange Ciena, Infinera 2011, 2014 40 Gbps, 100 Gbps AustralAsia http://subtelforum.com/ articles/?s=reach+north+asia+loop
SAC
System Name:
South American Crossing
Landing Points: Fortaleza (Brazil), Fort Amadour (Panama), Las Toninas (Argentina), Lurin (Peru), Puerto Viejo (Venezuela), Rio de Janeiro (Brazil), Santos (Brazil), St Croix (US Virgin Islands), Valparaiso (Chile)
St. Croix
RFS Year: 2001 Est. End of Service Date:
Puerto Viejo
Fort Amadour
Est. System Cost (US$): Total Length (kms):
15,983 100 Gbps
Design Capacity:
1.2 Tbps
System Supplier: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Lurin
520,000,000
Initial Capacity: Owners:
Fortaleza
2026
Global Crossing Alcatel Submarine Networks Level 3 Communications Infinera 2010, 2011 10 Gbps, 40 Gbps
Region: Americas
Rio de Janeiro Santos
Valparaiso Las Toninas
SACS
System Name:
South Atlantic Cable System [Planned]
Landing Points: Luanda (Angola), Fortaleza (Brazil) RFS Year: 2018 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2043 170,000,000 6,200
Initial Capacity:
40 Tbps
Design Capacity:
40 Tbps
Fiber Pairs: Channels: Channel Capacity: Owners:
4 Fiber Pairs 100 100 Gbps Angola Cables
System Supplier:
NEC
System Installer:
NEC
Region: Transatlantic News:
http://subtelforum.com/articles/tag/ sacs/
Fortaleza Luanda
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Cochin
SAFE
Penang
Sa
in
t-P
au
l
Baie du Jacotet
Durban Cape Town
System Name:
South Africa-Far East
Landing Points: Baie du Jacotet (Mauritius), Cape Town (South Africa), Cochin (India), Durban (South Africa), Penang (Malaysia), SaintPaul (Reunion) RFS Year:
2002
Est. End of Service Date:
2027
Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
350,000,000 13,669 440 Gbps France Telecom, Tata Communications, Telekom SA
System Supplier:
Tyco Telecommunications
System Installer:
FCR
Cableship: System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity: Region:
Vercors Mauritius Telecom, Orange, TATA Communications, Telkom SA Limited, TM Berhad Alcatel-Lucent Submarine Networks 2014 40 Gbps Indian Ocean Pan-East Asian
SAM-1
Boca Raton
San Juan
Puerto Barrios
Puerto San Jose
Barranquilla
System Name: Salinas Mancora
Fortaleza
Lurin
Salvador Arica
Landing Points: Arica (Chile), Barranquilla (Colombia), Boca Raton (USA), Fortaleza (Brazil), Las Toninas (Argentina), Lurin (Peru), Mancora (Peru), Puerto Barrios (Guatemala), Puerto San Jose (Guatemala), Rio de Janeiro (Brazil), Salinas (Ecuador), Salvador (Brazil), Sa RFS Year:
2001
Est. End of Service Date:
2026
Est. System Cost (US$): Santos
Valparaiso Las Toninas
Rio de Janeiro
South America-1
Total Length (kms):
650,000,000 24,140
Initial Capacity:
160 Gbps
Design Capacity:
1.92 Tbps
Owners:
Telefonica
System Supplier:
Tyco Telecommunications
Marine Surveyor:
C&C Technologies
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
Telefonica International Wholesale Services Infinera 2009, 2010, 2012 10 Gbps, 40 Gbps, 100 Gbps Americas http://subtelforum.com/articles/?s=sam-1
SAMOA-FIJI
Samoa
System Name:
Fiji
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Samoa-Fiji [Planned]
Landing Points: Upola, Samoa; Savai’I, Samoa; Suva, Fiji RFS Year:
2017
Est. End of Service Date:
2042
Est. System Cost (US$): Total Length (kms): Owners: Region: News:
57,400,000 1,300 Samoa Submarine Cable Company AustralAsia http://subtelforum.com/articles/tag/ samoa-fiji/
SAPL
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Oahu Hilo System Name: South America Pacific Link [Planned] Landing Points: Oahu, Hawaii (USA); Balboa, Panama; Valparaiso, Chile; Jacksonville, Florida (USA); future connectivity to: Hilo, Hawaii (USA); Manta, Ecuador; Lima, Peru; Arica, Chile; Cuba; Dominican Republic RFS Year: 2018 Est. End of Service Date:
2043
Est. System Cost (US$): 460,000,000 Total Length (kms): 14,200 Design Capacity: 30 Tbps Fiber Pairs: 3 Fiber Pairs Channels: 100 Channel Capacity: 100 Gbps Owners: Ocean Networks System Supplier:
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks, IT International Telecom Region: News:
Transpacific http://subtelforum.com/articles/tag/sapl/
Balboa Manta Lima Arica Santiago
SAPL CX
System Name:
South America Pacific Link Caribbean Express [Planned]
Landing Points: Jacksonville, Florida (USA); Panama
Jacksonville
RFS Year: 2017 Est. End of Service Date:
2042
Total Length (kms):
3,400
Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
60 Tbps 6 Fiber Pairs 100 100 Gbps Ocean Networks, Inc.
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Region: Americas News:
Panama
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
http://subtelforum.com/articles/tag/ sapl/
SAS-1
System Name:
Saudi Arabia-Sudan
Landing Points: Jeddah (Saudi Arabia), Port Sudan (Sudan) RFS Year: 2003 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
2028 20,000,000 333 1.28 Tbps 4 Fiber Pairs STC (Saudi Arabia)
Region: EMEA
Jeddah
Port Sudan
SAT-3 Sesimbra Chipiona
South Atlantic 3
Landing Points: Abidjan (Ivory Coast), Accra (Ghana), Alta Vista (Spain), Chipiona (Spain), Cotonou (Benin), Dakar (Senegal), Douala (Cameroon), Lagos (Nigeria), Libreville (Gabon), Luanda (Angola), Melkbosstrand (South Africa), Sesimbra (Portugal) RFS Year:
2002
Est. End of Service Date:
2027
Est. System Cost (US$): 370,000,000 Total Length (kms): 14,350 Initial Capacity: 340 Gbps Design Capacity: Fiber Pairs: Channel Capacity: Owners:
System Supplier: System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
800 Gbps
Alta Vista
Dakar
Ab i Ac dja cr n a Co La to go no s u
System Name:
Douala Libreville
2 Fiber Pairs 40 Gbps Angola Telecom, AT&T, British Telecom, Camtel of Cameroon, CIT, Cote dIvoire Telecom, CPRM, C&W, France Telecom (12.08%), Ghana Telecom, Maroc Telecom of Morocco, Mauritius Telecom, Nigerian Telecommunications Ltd, Nitel (8.39%), OPT Benin, OPT Gabon, PT
Luanda
Alcatel Submarine Networks Angola Telecom, PT Comunicações S.A., Sonatel, Telefonica de España S.A.U., Telkom SA Limited, Vodafone Limited Alcatel-Lucent Submarine Networks 2014 40 Gbps EMEA http://subtelforum.com/articles/tag/sat-3/
Melkbosstrand
SCAN
Hong Kong
System Name:
Submarine Cable Asia Network
Landing Points: Hong Kong, Indonesia RFS Year: 2011 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Design Capacity: Owners: System Supplier:
2036 337,000,000 4,300 40 Gbps 1.92 Tbps PT. Fangbian Iskan Corporindo, Telemedia Pacific Inc. NEC
Region: AustralAsia News:
Jakarta
http://subtelforum.com/articles/tag/ scan/
SCF-CN
System Name:
SCF-CN
Landing Points: Basseterre (St. Kitts & Nevis), Bridgetown (Barbados), Kingstown (St. Vincent), Martinique (Martinique), Port Castries (St Lucia), Port Salines (Grenada), Macqueripe (Trinidad and Tobago) RFS Year: 2007
Basseterre
Est. End of Service Date:
2032
Total Length (kms):
1,186
Initial Capacity: Owners:
1.28 Tbps SCF (Group Loret)
Region: Americas
Martinique Port Castries
Kingstown Bridgetown Port Salines Redcar
SCOTLAND-ORKNEY-SHETLAND
System Name:
Scotland-Orkney-Shetland
Landing Points: Scotland-Orkney-Shetland RFS Year: 2013 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
2038 12,000,000 400 British Telecom
Region: EMEA
Shetland
Orkney
Scotland
SEABRAS-1
Project Completion Phases: Pre-Engineering
New York
Survey System Manufacture System Installation Commissioning & Acceptance
System Name: Seabras-1 [Planned] Landing Points: Sao Paolo, Brazil; New York, (USA); branching unit to Fortaleza, Brazil RFS Year: 2017 Est. End of Service Date:
2042
Est. System Cost (US$): 509,000,000 Total Length (kms): 10,750 Design Capacity: 72 Tbps
Fortaleza
Fiber Pairs: 6 Fiber Pairs Channels: 120 Channel Capacity: 100 Gbps Owners: Seaborn Networks, Microsoft System Supplier:
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Marine Surveyor: Survey Boat: Region: News:
Gardline Sea Surveyor Americas http://subtelforum.com/articles/tag/ seabras-1/
Sao Paulo
SEACOM
Mumbai
Djibouti
System Name:
Seacom
Landing Points: Abu Talat (Egypt), Dar es Salaam (Tanzania), Djibouti (Republic of Djibouti), Maputo (Mozambique), Mombasa (Kenya), Mtunzini (South Africa), Mumbai (India), Zafarana (Egypt)
Mombasa Dar es Salaam
RFS Year: 2009 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity:
1.28 Tbps
Tyco Telecommunications SSI
System Installer:
Tyco Telecommunications SSI
Upgrader:
M
ap
ut
o
Upgrade Year:
i
Convergence Partners (12.50%), Herakles Telecom LLC (25%), Industrial Promotion Services (25%), Shanduka Group (12.50%), VenFin Limited (25%)
System Supplier:
System Maintainer:
nz in
13,601 110 Gbps
Cableship:
tu
600,000,000
Initial Capacity: Owners:
M
2034
Upgraded Capacity:
Durable, Decisive, Dependable, Resolute, Responder Seacom Ltd, E-marine PJSC Ciena 2013 100 Gbps
Region: Indian Ocean Pan-East Asian News:
http://subtelforum.com/articles/tag/ seacom/
SEAK
Juneau Hawk Inlet Angoon Sitka Petersburg Wrangell
Ketchikan System Name:
South East Alaska
Landing Points: Angoon (USA), Hawk Inlet (USA), Juneau (USA), Ketchikan (USA), Petersburg (USA), Sitka (USA), Wrangell (USA) RFS Year:
2008
Est. End of Service Date:
2033
Initial Capacity: 10 Gbps Owners: Region:
GCI Americas
SEA-ME-WE 3
Owners: System Supplier: Cableship:
SEA-ME-WE 3 Consortium Alcatel Submarine Networks, Fujitsu, Pirelli, KDDSCS, Tyco Telecommunications Agile, Maersk Defender, Maersk Fighter, Fresnel, Fu Lai, Nexus, Leon Thevinin, Vercors, Raymond Croze, Etisalat, Umm Al Anber
Marine Surveyor: C&C Technologies System Maintainer:
nh
Landing Points: Alexandria (Egypt), Al Seeb (Oman), Batangas (Philippines), Chania (Greece), Cochin (India), Da Nang (Vietnam), Deep Water Bay (Hong Kong), Dehiwala-Mount Lavinia (Sri Lanka), Djibouti (Republic of Djibouti), Fangshan (Taiwan), Fujairah (United Arab Emira 1999
Est. End of Service Date:
2024
Pe Sat na un D ng a N an g
Mumbai
nt
eb
Se
Al South East Asia-Middle East-Western Europe 3
Karachi ou
Se
Djibouti
RFS Year:
Deep Water Bay
u to a an ip Sh Ta
Fujairah Jeddah
System Name:
Keoje
ui
Teutan
British Telecommunications PLC, China Telecommunications Corporation, Chunghwa Telecom Co., Cyprus Telecommunications Authority, Deutsche Telekom AG, Hellenic Telecommunications Organization S.A., KDDI, KT Corporation, Oman Telecommunications Company,
Na
Mazara Marmaris Yeroskipou Chania Alexandria Suez
Co D chi La ehi n vi wa ni la a -M
sim
br a
G
oo
nh
ill y
Norden Oostende Penmarch
Pyapon
Medan
Tuas
Okinawa Toucheng Fangshan Batangas
Tungku Mersing
Est. System Cost (US$): 1,500,000,000 Total Length (kms):
39,622
Initial Capacity:
40 Gbps
Design Capacity:
55 Gbps
Fiber Pairs: 2 Fiber Pairs Channels: 8 Channel Capacity:
2.5 Gbps, 10 Gbps
Perth Region: EMEA, Indian Ocean Pan-East Asian, AustralAsia News:
http://subtelforum.com/articles/tag/seame-we-3/
SEA-ME-WE 4
System Name:
Landing Points: Alexandria (Egypt), Annaba (Algeria), Bizerte (Tunisia), Chennai (India), Colombo (Sri Lanka), Cox’s Bazaar (Bangladesh), Fujairah (United Arab Emirates), Jeddah (Saudi Arabia), Karachi (Pakistan), Marseille (France), Melaka (Malaysia), Mumbai (India), Mu
Marseille Palermo
An n Bi aba ze rte
South East Asia-Middle East-Western Europe 4
RFS Year: 2005 Est. End of Service Date:
Alexandria Suez
Est. System Cost (US$): Total Length (kms):
2030 500,000,000 18,846
Karachi Jeddah
Cox’s Bazaar Mumbai Chennai
Colombo
el
M
Initial Capacity: 1.28 Tbps
Satun
a ak
Design Capacity: 12.8 Tbps
Tuas
Fiber Pairs: 2 Fiber Pairs Channels:
64
Channel Capacity: 100 Gbps Owners:
Region: News:
Algerie Telecom, Algeria, Bangladesh Submarine Cable Company Limited (BSCCL), Bangladesh, Bharti Airtel, CAT Telecom (Thailand), Du, France Telecom, Pakistan Telecommunication Company Limited, Pakistan, Saudi Telecom Company (STC), Saudi Arabia, Sri Lanka EMEA, Indian Ocean Pan-East Asian http://subtelforum.com/articles/tag/ sea-me-we-4/ http://subtelforum.com/ articles/?s=sea-me-we+4
System Supplier:
Alcatel Submarine Networks, Fujitsu
System Installer:
Orange Marine
Cableship: System Maintainer:
Upgrader: Upgrade Year:
Niwa, Descartes E-marine PJSC, Orange, Singapore Telecommunications Limited, Sri Lanka Telecom Ltd, TATA Communications, Telecom Egypt, Telecom Italia Sparkle, TM Berhad, Verizon Ltd Alcatel-Lucent Submarine Networks, Mitsubishi Electric 2011, 2015
Upgraded Capacity: 40 Gbps, 100 Gbps
SEA-ME-WE 5
Project Completion Phases: Pre-Engineering Survey
Marseille
System Manufacture System Installation
An n Bi aba ze rte
Palermo
Commissioning & Acceptance
Alexandria Suez Karachi Jeddah
Mumbai
South East Asia-Middle East-Western Europe 5 [Planned]
Landing Points: Marseille (France), Annaba (Algeria), Palermo (Italy), Bizerte (Tunisia), Jedda (Saudi Arabia), Fujairah (UAE), Karachi (Pakistan), Mumbai (India), Chennai (India), Colombo (Sri Lanka), Cox’s Bazar (Bangladesh), Satun (Thailand), Singapore (Singapore), Ma RFS Year:
2016
Est. End of Service Date:
2040
Chennai Satun
Colombo
M Sin alac ga ca po re
System Name:
Cox’s Bazaar
Est. System Cost (US$): 100,000,0000 Total Length (kms): 20,000 Design Capacity: Channel Capacity: Owners:
24 Tbps 100 Gbps Bangladesh Submarine Cable Company Ltd, China Mobile International Ltd, China Global Telecommunications Limited, China Network Communications Group Co Ltd, Emirates Integrated Telecommunications Co, Orange, Myanmar Post and Telecom, PT Telekomunikasi Indo
System Supplier:
Alcatel-Lucent Submarine Networks, NEC
System Installer:
Alcatel-Lucent Submarine Networks, NEC
Marine Surveyor:
Elettra
Region: EMEA, Indian Ocean Pan-East Asian News: http://subtelforum.com/articles/tag/seame-we-5/
SEA-US
Los Angeles Hawaii Davao Guam City Manado System Name:
South East Asia-United States [Planned]
Landing Points: Manado (Indonesia), Davao (Phillippines), Piti, Guam: Oahu, Hawaii (United States), Los Angeles, California (United States) RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Channel Capacity:
Project Completion Phases:
Owners:
Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
2041 250,000,000 15,000 20 Tbps 100 Gbps Telekomunikasi Indonesia International (Telin), Globe Telecom, RAM Telecom International (RTI), Hawaiian Telcom, GTI Corporation, Telkom USA, GTA
System Supplier:
NEC
System Installer:
NEC
Region: Transpacific News:
http://subtelforum.com/articles/tag/sea-us/
SG-SCS
System Name:
Suriname-Guyana Submarine Cable System
Landing Points: Macqueripe (Trinidad), Georgetown (Guyana), Totness (Suriname) RFS Year: 2010 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
Chaguaramas
Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners:
Georgetown
2035 54,000,000 1,249 1.28 Tbps 2 Fiber Pairs 64 10 Gbps Guyana Telephone and Telegraph Co. Ltd, Telesur of Suriname
System Supplier:
Huawei Marine Networks, Nexans
System Installer:
Global Marine Systems Limited, Huawei Marine Networks
Cableship:
Sovereign
Region: Americas
Totness
News:
http://subtelforum.com/articles/tag/sg-scs/
SHEFA 2
Tórshavn
System Name: Shetland-Faroese 2 Landing Points: Ayre of Cara (UK), Banff (UK), Maywick (UK), Sandwick (Scotland), Tórshavn (Faroe Islands) RFS Year: 2008 Est. End of Service Date:
2033
Maywick
Sandwick
Est. System Cost (US$): 27,000,000 Total Length (kms): 828 Initial Capacity: 20 Gbps Design Capacity: 570 Gbps Owners: Faroese Telecom System Supplier:
Ayre of Cara
NSW
System Installer: International Telecom Cableship: IT Intrepid Marine Surveyor:
Fugro
System Maintainer: Faroese Telecom Upgrader: Region: News:
Xtera Communications EMEA http://subtelforum.com/articles/?s=shefa
Banff
SILPHIUM
System Name:
Silphium
Landing Points: Chania (Greece), Darnah (Libya) RFS Year: 2012 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
426 70 Gbps
Design Capacity:
1.2 Tbps
Channels: Channel Capacity: Owners:
3 Fiber Pairs 40 10 Gbps Libyan Post, Telecom, and Information Technology Company
System Supplier:
Huawei Marine Networks, Nexans
System Installer:
Huawei Marine Networks
Region: EMEA News:
Darnah
20,000,000
Initial Capacity: Fiber Pairs:
Chania
2037
http://subtelforum.com/articles/tag/ silphium/
SJC
Chikura
Lantau
System Name:
Landing Points: Chikura (Japan), Lantau (Hong Kong), Nasugbu (Philippines), Shantou (China), Telisai (Brunei), Tuas (Singapore) RFS Year:
2013
Est. End of Service Date:
2038
Est. System Cost (US$): Total Length (kms):
Nasugbu
Initial Capacity: Fiber Pairs: Channel Capacity: Owners:
400,000,000 8,986 28 Tbps 6 Fiber Pairs 100 Gbps SJC Consortium (Brunei International Gateway Sendirian Berhad, China Mobile, China Telecom, China Telecom (Hong Kong) International Ltd., Donghwa Telecom Co., Ltd., Globe Telecom, Inc., Google SJC Bermuda Ltd., KDDI Corporation, Singapore Telecom, Telin,
System Supplier:
TE SubCom, NEC
System Installer:
S.B. Submarine Systems, NEC
Upgrader:
Tuas
South-East Asia Japan Cable
Upgrade Year: Upgraded Capacity: Region: News:
TE SubCom 2014, 2016 100 Gbps AustralAsia http://subtelforum.com/articles/tag/sjc/
SKR1M
System Name:
Sistem Kabel Rakyat 1 Malaysia [Planned]
Landing Points: Peninsular Malaysia; Sabah, Malaysia; Sarawak, Malaysia RFS Year: 2017 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Owners:
2042 100,000,000 3,500 4 Tbps TIME dotCom Bhd
System Supplier:
NEC
System Installer:
Telekom Malaysia
Region: AustralAsia
Sabah
Project Completion Phases: Pre-Engineering Survey
Peninsular
System Manufacture System Installation Commissioning & Acceptance
Sarawak
SMPCS
System Name:
Sulawesi-Maluku-Papua Cable System
Landing Points: Papua Provinces, New Guinea RFS Year: 2015 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity:
Maluku
Owners:
Papua
71,100,000 2,000 40 Gbps PT Telekom (Indonesia)
System Supplier:
NEC, Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks, NTT, NEC
Marine Surveyor: Sulawesi
2040
Fugro
Survey Boat: Fugro Supporter Region: AustralAsia News:
http://subtelforum.com/articles/tag/ smpcs/
SMPR-1
System Name:
St. Maarten-Puerto Rico 1
Landing Points: San Juan (Puerto Rico), St Martin (Netherlands Antilles) RFS Year: 2004 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: System Maintainer:
2029 15,000,000 382 2.5 Gbps Smitcoms SMITCOMS
Region: Americas
San Juan
St. Martin
SOCC
System Name:
Solomons Oceanic Cable Network [Planned]
Landing Points: Honiara (Solomon), Sydney (Australia), Auki (Soloman), Noro (Soloman) RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners: System Supplier:
2041 54,000,000 827 Solomons Oceanic Cable Company TE SubCom
Region: AustralAsia News:
Noro
http://subtelforum.com/articles/?s=SOCC
Auki Honiara
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation
Sydney
Commissioning & Acceptance
SOLAS
System Name:
Solas
Landing Points: Kilmore Quay (Ireland), Oxwich Bay (UK) RFS Year: 2012 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2037 6,000,000 140
Initial Capacity:
5 Gbps
Owners:
Eircom
System Installer: Cableship: System Maintainer:
Global Marine Systems Limited Wave Sentinel Vodafone Limited
Region: EMEA
Kilmore Quay
Oxwich Bay
SOUTHERN CROSS CABLE NETWORK
System Name:
Southern Cross Cable Network
Landing Points: Alexandria (Australia), Brookvale (Australia), Kahe Point (Hawaii), Morro Bay (USA), Nedonna Beach (USA), Spencer Beach (USA), Suva (Fiji), Takapuna (New Zealand), Whenuapai (New Zealand)
Nedonna Beach Morro Bay Kahe Point
Spencer Beach
RFS Year: 2000 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
3.6 Tbps 14 Tbps
Fiber Pairs: Channels:
3 Fiber Pairs Segments A,C,G1,G2,I. 4 Fiber Pairs Segments D and F 16 100 Gbps Southern Cross Cable Network
System Supplier:
Alcatel Submarine Networks, Fujitsu
System Installer:
Alcatel Submarine Networks
Cableship:
System Maintainer:
Takapuna Whenuapai
30,000
Design Capacity:
Owners:
Brookvale Alexandria
1,300,000,000
Initial Capacity:
Channel Capacity:
Suva
2030
Upgrader: Upgrade Year: Upgraded Capacity:
Cable Innovator laid 13761 km, Nexus laid 3306 km, Vercors laid 10007 km. Fresnel laid 800 km Southern Cross Cables Limited, Verizon Ciena 2012, 2013 40 Gbps, 100 Gbps
Region: Transpacific News:
http://subtelforum.com/articles/tag/ southern-cross/
SVALBARD
System Name:
Svalbard
Landing Points: Andøy (Norway), Harstad (Norway), Hotellneset (Norway) RFS Year: 2004
Hotellneset
Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
2029 80,000,000 2,800 4.8 Tbps Telenor
System Supplier:
Tyco Telecommunications, Nexans
System Installer:
Global Marine Systems Limited
Cableship:
Innovator
Region: EMEA
Andøy
Harstad
TANGERINE
System Name:
Tangerine
Landing Points: Broadstairs (United Kingdom), Oostende (Belguim) RFS Year: 2000 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Fiber Pairs:
2025 10,000,000 121 240 Gbps 96 Fiber Pairs
Owners:
Level 3 Communications
System Maintainer:
Level 3 Communications
Region: EMEA
Broadstairs
Oostende
TANNAT
Santos
System Name:
Tannat [Planned]
Landing Points: Santos (Brazil), Maldonado (Uruguay) RFS Year:
2017
Est. End of Service Date:
2042
Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs:
Project Completion Phases:
Owners:
50,000,000 2,000 90 Tbps 6 Fiber Pairs Google, Government of Uruguay
Pre-Engineering
System Supplier:
Alcatel-Lucent Submarine Networks
Survey
System Installer:
Alcatel-Lucent Submarine Networks
System Manufacture System Installation Commissioning & Acceptance
Maldinado
Marine Surveyor: Region: News:
EGS Americas http://subtelforum.com/articles/tag/ tannat/
TASMAN GLOBAL ACCESS
System Name:
Tasman Global Access [Planned]
Landing Points: Australia, New Zealand RFS Year: 2016 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Channel Capacity: Owners:
2041 60,000,000 2,300 20 Tbps 2 Fiber Pairs 100 Gbps Spark New Zealand, Vodafone, Telstra
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Region: AustralAsia News:
http://subtelforum.com/articles/tag/tga/
alia
tr Aus
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
New Zealand
TAT 14
Blaabjerg
M
an
as qu
an
orden th N u o ijk em Wid Bay Katw aux C n e alery V t n i Sa
Tuckerton
System Name:
TAT-14
Landing Points: Blaabjerg (Denmark), Katwijk (Netherlands), Manasquan (USA), Norden (Germany), Saint-Valery-en-Caux (France), Tuckerton (USA), Widemouth (UK) RFS Year:
2001
Est. End of Service Date:
2026
Cableship:
Est. System Cost (US$): 400,000,000 Total Length (kms): 15,453 Initial Capacity: 160 Gbps Design Capacity: Fiber Pairs: Channels: Channel Capacity: Owners: System Supplier:
Marine Surveyor: System Maintainer:
9.38 Tbps 4 Fiber Pairs 40 40 Gbps TAT-14 Consortium Mitsubishi Electric Corporation
System Installer: Global Marine Systems Limited
Upgrader: Upgrade Year: Upgraded Capacity:
Cable Innovator, Cable Endeavour, Bold Endurance, Wave Sentinel, Subaru, Maersk Recorder, Maersk Forwarder, Sir Eric Sharp, Agile, Teliri, Fresnel, Vercors Fugro AT&T, British Telecommunications PLC, Deutsche Telekom AG, KPN Telecom International, Orange, TeliaSonera International Carrier AB Mitsubishi 2012 40 Gbps
Region: Transatlantic News: http://subtelforum.com/articles/?s=tat-14
TE NORTH
Marseille
System Name:
Telecom Egypt North
Landing Points: Abu Talat (Egypt), Pentaskinos (Republic of Cyprus), Marseille (France) RFS Year:
2011
Est. End of Service Date: 2036 Est. System Cost (US$): 150,000,000 Total Length (kms): 2,938
Cyprus
Initial Capacity: 10 Tbps Design Capacity: 20 Tbps Fiber Pairs: 8 Fiber Pairs Channels:
25
Channel Capacity: 100 Gbps Owners: System Supplier:
Telecom Egypt Alcatel-Lucent Submarine Networks
System Maintainer: Telecom Egypt Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
Infinera 2012 100 Gbps EMEA http://subtelforum.com/articles/tag/tenorth/
Alexandria
TEAMS Fujairah
System Name:
The East African Marine System
Landing Points: Fujairah (United Arab Emirates), Mombasa (Kenya) RFS Year:
2009
Est. End of Service Date:
2034
Est. System Cost (US$): Total Length (kms):
120 Gbps
Design Capacity:
1.28 Tbps
sa ba
Etisalat (15%), TEAMS Ltd. (85%)
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
e-Marine
Cableship:
Niwa
Marine Surveyor:
Fugro
Region:
om
4,500
Initial Capacity: Owners:
M
130,000,000
News:
Indian Ocean Pan-East Asian http://subtelforum.com/articles/tag/ teams/
TGN EURASIA
Marseille
Alexandria Ras Sidr
M
um
ba
i
Jeddah
System Name:
Djibouti
TGN Eurasia
Landing Points: Abu Talat (Egypt), Djibouti (Republic of Djibouti), Jeddah (Saudi Arabia), Marseille (France), Mtunzini (South Africa), Mumbai (India), Zafarana (Egypt) RFS Year:
2009
Est. End of Service Date:
2034
Est. System Cost (US$): Total Length (kms):
250,000,000 9,240
Initial Capacity: 160 Gbps Design Capacity: 1.28 Tbps Owners:
SEACOM, Tata Communications, Telecom Egypt
System Maintainer:
TATA Communications, Tyco Electronics Subsea Communications LLC
Region: Indian Ocean Pan-East Asian News:
http://subtelforum.com/ articles/?s=TGN+Eurasia
TGN GULF
System Name:
TGN Gulf
Landing Points: Al-Khobar (Saudi Arabia), Dubai (UAE), Kuwait City (Kuwait), Manama (Bahrain), Sumaisma (Qatar) RFS Year: 2011 Est. End of Service Date: Est. System Cost (US$):
Kuwait City
Total Length (kms): Design Capacity: Fiber Pairs: Owners: System Supplier:
Al-Khobar
M
an
am
a
System Maintainer:
Sumaisma
Dubai
2036 200,000,000 2,306 1.28 Tbps 2 Fiber Pairs Tata Communications TE SubCom TATA Communications, Tyco Electronics Subsea Communications LLC
Region: EMEA News:
Co
ion to nnect
m
Seaco
http://subtelforum.com/ articles/?s=TGN+Gulf
Toyohashi
TGN INTRA-ASIA
Deep Water Bay
Ballesteros
Piti Vung Tau
Est. System Cost (US$): Total Length (kms):
3.84 Tbps
Channel Capacity:
100 Gbps
or e ap Si ng Landing Points: Ballesteros (Philippines), Deep Water Bay (Hong Kong), Piti (Guam), Singapore (Singapore), Toyohashi (Japan), Vung Tau (Vietnam) RFS Year:
2009
Est. End of Service Date:
2034
Tata Communications
System Supplier:
Tyco Telecommunications
System Installer:
Orange Marine
System Maintainer: TGN Intra-Asia
6,485
Initial Capacity: Owners:
System Name:
180,000,000
TATA Communications, Tyco Electronics Subsea Communications LLC
Upgrader:
Ciena
Upgrade Year:
2014`
Upgraded Capacity: Region:
100 Gbps AustralAsia
News: http://subtelforum.com/ articles/?s=TGN+Intra-Asia
H
um
an
by
TGN NORTHERN EUROPE
De Marne
System Name:
TGN Northern Europe
Landing Points: De Marne (Netherlands), Humanby (UK) RFS Year:
2002
Est. End of Service Date:
2027
Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer: Region: News:
551 3.84 Tbps 4 Fiber Pairs Tata Communications TATA Communications, Tyco Electronics Subsea Communications LLC EMEA http://subtelforum.com/ articles/?s=TGN+Northern+Europe
TGN TRANSATLANTIC
Highbridge Saunton Sands
Wall Township
System Name:
TGN Transatlantic
Landing Points: Highbridge (UK), Saunton Sands (UK), Wall Township (USA) RFS Year: 2001 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: System Supplier: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
2026 340,000,000 12,670 2.56 Tbps Tata Communications Tyco Telecommunications TATA Communications, Tyco Electronics Subsea Communications LLC Ciena 2013 100 Gbps
Region: Transatlantic
TGN TRANSPACIFIC
Nedonna Beach
Emi Toyohashi
Hermosa Beach
System Name:
TGN Transpacific
Landing Points: Emi (Japan), Hermosa Beach (USA), Nedonna Beach (USA), Toyohashi (Japan) RFS Year: 2002 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2027 580,000,000 21,424
Initial Capacity:
5.12 Tbps
Channel Capacity:
100 Gbps
Owners: System Supplier: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Tata Communications Tyco Telecommunications TATA Communications, Tyco Electronics Subsea Communications LLC Ciena 2014 100 Gbps
Region: Transpacific
TGN WESTERN EUROPE
Highbridge
System Name:
Bilbao
TGN Western Europe
Landing Points: Bilbao (Spain), Highbridge (UK), Seixal (Portugal) RFS Year: 2002 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: System Supplier:
Seixal
System Maintainer:
2027 100,000,000 3,487 3.84 Tbps Tata Communications Tyco Telecommunications TATA Communications, Tyco Electronics Subsea Communications LLC
Region: EMEA News:
http://subtelforum.com/ articles/?s=TGN+WEstern+Europe
TGN-TATA INDIACOM
Chennai
System Name:
TGN-TATA IndiaCom
Landing Points: Chennai (India), Changi (Singapore) RFS Year:
2004
Est. End of Service Date:
2029
Est. System Cost (US$): 90,000,000 Total Length (kms): 3,175 Initial Capacity: 640 Gbps Fiber Pairs: Owners: Region:
8 Fiber Pairs Tata Communications Indian Ocean Pan-East Asian
Changi
TGN-TIC
Chennai
System Name:
TGN-TIC
Landing Points: Chennai (India), Tuas (Singapore) RFS Year:
2005
Est. End of Service Date:
2030
Total Length (kms): 3,175 Initial Capacity: 5.12 Tbps Owners: System Maintainer: Region: News:
Tata Communications TATA Communications Indian Ocean Pan-East Asian http://subtelforum.com/ articles/?s=TGN+TIC
Tuas
TIERRA DEL FUEGO
System Name:
Tierra del Fuego
Landing Points: Punta Dungeness (Argentina), Espiritu Santo (Argentina) RFS Year: 2012 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
2037 5,000,000 27 AR-SAT
System Supplier:
Boskalis, Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Cableship:
Ile de Batz
Region: Americas News:
Punta Dungeness Espiritu Santo
http://subtelforum.com/articles/tag/ tierra-del-fuego/
TIS
System Name:
Thailand-Indonesia-Singapore
Landing Points: Batam (Indonesia), Songkhla (Thailand) RFS Year: 2006 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
Songkhla
2031 36,000,000 1,003 30 Gbps CAT Telecom (Thailand), PT Telekom, Singtel
System Supplier:
Tyco Telecommunications
System Installer:
ASEAN Cableship
System Maintainer:
Singapore Telecommunications Limited
Region: AustralAsia
Batam
TONGA-FIJI
System Name:
Tonga-Fiji
Landing Points: Nuku’alofa (Tonga), Suva (Fiji) RFS Year: 2012 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
2037 18,900,000 827 Tonga Cable Limited
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer:
Alcatel-Lucent Submarine Networks
Region: AustralAsia
TPE
Nedonna Beach
Qingdao Keoje Chongming Fuzhou Tanshui System Name:
Trans-Pacific Express
Landing Points: Chongming (China), Shin-Maruyama (China), Keoje (South Korea), Nedonna Beach (USA), Qingdao (China), Tanshui (Taiwan) RFS Year:
2008
Est. End of Service Date:
2033
Est. System Cost (US$): 440,000,000 Total Length (kms): 16,163 Initial Capacity: 1.28 Tbps Design Capacity: Owners:
System Supplier:
5.12 Tbps AT&T, China Telecom, China Unicom, Chunghwa Telecom International, KT Coropration, Verizon, NTT Com Tyco Telecommunications
System Installer: Global Marine Systems Limited, NTT Cableship: System Maintainer:
Cable Innovator China Telecommunications Corporation, Chunghwa Telecom Co., KT Corporation, NTT Communications Corporation, Verizon Ltd
Upgrader:
TE SubCom
Upgrade Year: 2013 Upgraded Capacity: 10 Gbps Region: Transpacific News: http://subtelforum.com/articles/ tag/TPE/ http://subtelforum.com/ articles/?s=TPE
TRIDENT
System Name:
Trident [Planned]
Landing Points: Perth, Onslow (Australia), Jakarta (Indonesia) RFS Year: 2017 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs:
Jakarta
Channels: Channel Capacity: Owners:
2042 290,000,000 4,600 38 Tbps 2 Fiber pairs Perth-Singapore (8 Tbps), 1 fibre pair Perth-Jakarta (10 Tbps), 1 fibre pair Onslow-Jakarta (10 Tbps) and 1 fibre pair Perth-Onslow (10 Tbps) Perth-Singapore 40, rest 100 100 Gbps Trident Subsea Cable
System Supplier:
TE SubCom
System Installer:
TE SubCom
Region: AustralAsia News:
Onslow
Project Completion Phases: Pre-Engineering Survey System Manufacture System Installation Commissioning & Acceptance
Perth
http://subtelforum.com/articles/tag/ trident/
Tr in
id
ad
Cu
ra
ça o
TRINIDAD-CURAÇAO
System Name:
Trinidad-Curaçao
Landing Points: Curacao (Curacao), Trinidad (Trinidad) RFS Year:
2007
Est. End of Service Date:
2032
Total Length (kms): 1,240 Initial Capacity: 1.875 Tbps Owners:
Columbus Networks, New World Network
System Supplier:
Tyco Telecommunications SSI, Alcatel, NEC
System Installer: Tyco SSI Cableship: Region:
Tyco Durable, Ile de Sein, Ile de Batz, Fu Hai, Segero, Cable Innovator Americas
SUBMARINE CABLE SYSTEM REPORTING
Presenting the industry’s most extensive collection of 375+ current and planned submarine cable systems impacting financiers, carriers, cable owners, system suppliers, component manufacturers and marine contractors, and detailing more than 50 menu-based data fields and maps in a customer-customizable report.
REPORTING IN 3-5 BUSINESS DAYS
For more information: subtelforum.com/stfanalytics
Powered by the comprehensive and industry leading STF Submarine Cable Database
TSE-1
Fuzhou
New Taipei City
System Name:
Taiwan Strait Express
Landing Points: Changle, Fuzhou City, China; Tamsui District, New Taipei City, Taiwan RFS Year:
2013
Est. End of Service Date:
2038
Est. System Cost (US$): Total Length (kms): Design Capacity: Fiber Pairs: Owners:
System Installer: Region:
10,000,000 270 6.4 Tbps 8 Fiber Pairs Taiwan International Gateway Corporation, China Mobile, Chunghwa Telecom, Taiwan Mobile, Far EasTone Telecommunications, China Unicom Huawei Marine Networks, NTT, S.B. Submarine Systems AustralAsia
TUBROK-EMASED
System Name: Tubrok-Emased Landing Points: Tobruk (Libya), El Quawef (Libya) RFS Year: 2010 Est. End of Service Date:
2035
Est. System Cost (US$): 10,000,000 Total Length (kms): 180 Design Capacity: 25.6 Tbps Fiber Pairs: 8 Fiber Pairs Channels: 80 Channel Capacity: 40 Gbps Owners: Libyan Post Telecommunications & Information Technology Company System Supplier:
Huawei Marine Networks
System Installer: Huawei Marine Networks, Orange Marine Region:
EMEA
Tobrok
El-Quawef
TWA-1
Fujairah
Karachi Al Seeb System Name:
Transworld Associates
Landing Points: Al Seeb (Oman), Fujairah (United Arab Emirates), Karachi (Pakistan) RFS Year:
2006
Est. End of Service Date:
2031
Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
40,000,000 1,300 1.28 Tbps Trans-World Associates
System Supplier:
Tyco Telecommunications
System Installer:
Tyco Telecommunications
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
E-marine PJSC, Oman Telecommunications Company Huawei Marine 2016 100 Gbps EMEA http://subtelforum.com/articles/tag/ twa-1/
UGARIT
System Name:
Ugarit
Landing Points: Pentaskhinos (Cyprus), Tartus (Syria) RFS Year: 1995 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: System Supplier: System Maintainer:
2020 16,000,000 240 622 Mbps Cypress Telecommunications Authority Tyco Telecommunications Cyprus Telecommunications Authority
Pe nt a
sk
hi
no
s
Region: EMEA
Tartus
UNISUR
Florianopolis
System Name:
Unisur
Landing Points: Florianopolis (Brazil), Las Toninas (Argentina), Maldonado (Uruguay)
Maldonado
RFS Year:
1994
Est. End of Service Date:
2019
Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners:
Las Toninas
System Maintainer: Region:
74,000,000 1,720 560 Mbps Antel (Uruguay), Embratel, Telecom Argentina, Telefonica de Argentina Telefonica International Wholesale Services Americas
UNITY
Chikura
Hermosa Beach
System Name:
Unity
Landing Points: Chikura (Japan), Los Angeles (USA) RFS Year: 2010 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2035 300,000,000 9,486
Initial Capacity:
1.92 Tbps
Design Capacity:
4.8 Tbps
Fiber Pairs: Owners:
5 Fiber Pairs Bharti Airtel, Global Transit, Google, KDDI, PACNET, Singtel
System Supplier:
Tyco Telecommunications
System Installer:
NEC, Kokusai Cable Ship
System Maintainer:
KDDI
Upgrader:
Ciena
Upgrade Year: Upgraded Capacity:
2013 100 Gbps
Region: Transpacific News:
http://subtelforum.com/articles/tag/ unity/
VENTSPILS-GOTLAND
System Name:
Vetnspils-Gotlan
Landing Points: Fårösund (Sweden), Stockholm (Sweden), Ventspils (Latvia) RFS Year: 2004 Est. End of Service Date: Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:
2029 175 2.5 Gbps 34 Fiber Pairs Baltcom TE SubCom
Region: EMEA
Stockholm
Stavsnas
Fårösund Ventspils
VMSCS
Catania
St. George’s Bay
System Name:
Vodafone Malta-Sicily Cable System
Landing Points: Balluta (Malta), Catania (Italy) RFS Year:
2004
Est. End of Service Date:
2029
Est. System Cost (US$): Total Length (kms): Initial Capacity: Owners: Region:
10,000,000 250 10 Gbps Vodafone Malta EMEA
Whitesand Bay
WACS
System Name:
West Africa Cable System
Sesimbra
Landing Points: Accra (Ghana), Alta Vista (Spain), Cape Verde (Cape Verde), Douala (Cameroon), Lagos (Nigeria), Lome (Togo), Luanda (Angola), Muanda (DRC), Pointe Noire (Congo), Sesimbra (Portugal), Walvis Bay (Namibia), Whitesands Bay (UK) RFS Year:
2012
Est. End of Service Date:
2037
Alta Vista
Est. System Cost (US$): 600,000,000 Total Length (kms): 14,350 Initial Capacity: 5.12
Channel Capacity: Owners:
4 Fiber Pairs 32 100 Gbps Angola Cables, Broadband Infraco, Congo Telecom, C&W, MTN Group, Office Congolais de Poste et Telecommunication, PT Comunicações, Tata Communications, Telecom Namibia, Telekom SA, Togo Telecom, Vodacom
System Supplier:
Alcatel-Lucent Submarine Networks
Marine Surveyor:
Fugro
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity: Region: News:
Cape Verde
Angola Cables, Telecom Nambia, Telkom SA Limited
m La e go s
Channels:
14.5 Tbps
cr a Lo
Fiber Pairs:
Ac
Design Capacity:
Douala
Pointe Noire Muanda Luanda
Huawei Marine Networks 2015 100 Gbps EMEA http://subtelforum.com/articles/ tag/wacs/ http://subtelforum.com/ articles/?s=WACS
Walvis Bay
WARF
Cochin
Hulhumalé
System Name:
WARF
Landing Points: Cochin (India), Hulhumalé (India) RFS Year: 2007 Est. End of Service Date: Est. System Cost (US$): Total Length (kms):
2032 20,000,000 680
Owners:
WARF Telecom International
System Supplier:
Alcatel Submarine Networks
Marine Surveyor:
Fugro
Region: Indian Ocean Pan-East Asian
WESTERN VISAYAS-PALAWAN
System Name:
Western Visayas-Palawan
Landing Points: Taytay, Palawan; San Jose de Buenavista, Iloilo (Philippines) RFS Year: 2014 Est. End of Service Date: Est. System Cost (US$): Total Length (kms): Owners:
2039 20,000,000 300 PLDT (Philippines)
Region: AustralAsia
Taytay
San Jose de Buenavista Iloilo
Voice
of the Industry